2025 Law Modifications
Citation CitationSort Type S.L. Bill Bill Section BillSectionSort Effective Date Status of Bill
1-18 25 H40 1(a) 1 06/26/2025
1-75.4 25 H40 29(1) 29 06/26/2025
1-82 20 H91 2.1 2.1 06/26/2025
1-283 54 H620 12(a) 12 07/02/2025
1-507.34 25 H40 29(1) 29 06/26/2025
1-538.2 71 S311 4(e) 4 12/01/2025
1-539.2A 25 H40 29(1) 29 06/26/2025
1-569.17 25 H40 2 2 06/26/2025
1A-1-4 25 H40 29(1) 29 06/26/2025
1A-1-5 25 H40 29(1) 29 06/26/2025
1A-1-63 54 H620 19(a) 19 07/02/2025
1C-1601 (a)(10) 46 H378 6(b) 6 09/01/2025
1C-1601.5 46 H378 6(a) 6 09/01/2025
1E-1 Chapter, title 1 57 S655 1 1 07/03/2025
1E-1 2 57 S655 1 1 07/03/2025
1E-10 57 S655 1 1 07/03/2025
1E-11 57 S655 1 1 07/03/2025
1E-12 57 S655 1 1 07/03/2025
1E-20 57 S655 1 1 07/03/2025
6-21 (13), (14) 94 H926 2.5 2.5 10/06/2025
6-21.6 25 H40 43 43 06/26/2025
7A-27 93 H307 6.5(e) 6.5 10/03/2025
7A-38.1 (l) 54 H620 18(a) 18 07/02/2025
7A-38.2 25 H40 29(5) 29 06/26/2025
7A-38.3B 54 H620 18(c) 18 07/02/2025
7A-38.3D (k) 54 H620 18(d) 18 07/02/2025
7A-38.3F 25 H40 29(5) 29 06/26/2025
7A-38.3F 25 H40 29(1) 29.1 06/26/2025
7A-38.4A (j) 54 H620 18(b) 18 07/02/2025
7A-40.1 54 H620 12.5(a) 12.5 07/02/2025
7A-45.3 54 H620 14(a) 14 12/01/2025
7A-45.4 54 H620 14(b) 14 12/01/2025
7A-45.4 25 H40 29(1) 29.1 06/26/2025
7A-47.4 54 H620 7 7 07/02/2025
7A-49.5 (b2) 54 H620 21 21 07/02/2025
7A-60 (a1) 93 H307 9(a) 9 07/01/2025
7A-60 (a3) 97 S449 5.6(b) 5.6 07/01/2025
7A-95 (c) 54 H620 12.3 12.3 07/02/2025
7A-105 54 H620 13(a) 13 07/02/2025
7A-109 (d) 92 H358 5.2 5.2 07/01/2025
7A-140.1 54 H620 12.5(b) 12.5 07/02/2025
7A-171 (a) 54 H620 16 16 07/02/2025
7A-171.3 (1) 93 H307 3(a) 3 10/03/2025
7A-173 93 H307 3(b) 3 10/03/2025
7A-232 54 H620 3(a) 3 07/02/2025
7A-301 54 H620 17 17 07/02/2025
7A-343 (13) 57 S655 2 2 07/03/2025
7A-343 (6c) 54 H620 15 15 07/02/2025
7A-343.1 (a) 57 S655 3 3 07/03/2025
7A-343.1 (a) 54 H620 1 1 07/02/2025
7A-792 54 H620 2(b) 2 08/01/2025
7A-793 54 H620 2(c) 2 08/01/2025
7A-801 54 H620 2(a) 2 08/01/2025
7B-100 Art 1, Subchapter I, title 59 S442 1(a) 1 07/03/2025
7B-101 16 H612 1.1 1.1 10/01/2025
7B-101 (14a) 16 H612 1.10(a) 1.10 04/01/2026
7B-102 59 S442 1(b) 1 07/03/2025
7B-201 (a) 1 16 H612 1.2(a) 1.2 06/26/2025
7B-302 (a) 1.5 16 H612 1.3(a) 1.3 10/01/2025
7B-302 (c) 2 16 H612 1.10(c) 1.10 04/01/2026
7B-302 (d) 3 16 H612 1.10(d) 1.10 04/01/2026
7B-302 (f), (g) 4 16 H612 1.3(a) 1.3 10/01/2025
7B-302.1 16 H612 1.4(a) 1.4 10/01/2025
7B-303 (a) 1 16 H612 1.10(e) 1.10 04/01/2026
7B-303 (c) 2 16 H612 1.3(b) 1.3 10/01/2025
7B-305 16 H612 1.3(c) 1.3 10/01/2025
7B-306 16 H612 1.3(d) 1.3 10/01/2025
7B-308 (b) 16 H612 1.3(e) 1.3 10/01/2025
7B-323 (e) 16 H612 1.19(a) 1.19 10/01/2025
7B-325 16 H612 1.19(b) 1.19 10/01/2025
7B-400 (c) 16 H612 1.4(b) 1.4 10/01/2025
7B-401.1 (e1), (g), (h) 16 H612 1.5 1.5 10/01/2025
7B-403 (a) 16 H612 1.10(f) 1.10 04/01/2026
7B-403 (b) 16 H612 1.3(f) 1.3 10/01/2025
7B-404 (b) 16 H612 1.6(c) 1.6 10/01/2025
7B-502 (b) 16 H612 1.6(a) 1.6 10/01/2025
7B-505 (a) 16 H612 1.11(c) 1.11 06/26/2025
7B-506 (a) 16 H612 1.6(b) 1.6 10/01/2025
7B-508 16 H612 1.7 1.7 10/01/2025
7B-600 (b), (b2) 16 H612 1.8 1.8 10/01/2025
7B-602 (b) 16 H612 1.9 1.9 10/01/2025
7B-604 16 H612 1.10(b) 1.10 04/01/2026
7B-903 (a)(6) 16 H612 1.11(b) 1.11 06/26/2025
7B-903.1 (c) 16 H612 1.11(a) 1.11 06/26/2025
7B-903.2 16 H612 1.12(a) 1.12 06/26/2025
7B-904 (d), (d1), (e) 16 H612 1.14(a) 1.14 06/26/2025
7B-906.1 16 H612 1.13(a) 1.13 10/01/2025
7B-906.2 16 H612 1.13(b) 1.13 10/01/2025
7B-909.2 16 H612 1.18(a) 1.18 10/01/2025
7B-909.3 16 H612 1.18(b) 1.18 10/01/2025
7B-1109 (f) 16 H612 1.14(b) 1.14 10/01/2025
7B-1114 16 H612 1.14(d) 1.14 06/26/2025
7B-1407 (b), (c) 27 H576 4.1(a) 4.1 07/01/2025
7B-1903 54 H620 10(a) 10 12/01/2025
7B-1904 54 H620 10(b) 10 12/01/2025
7B-2204 (d) 25 H40 3 3 06/26/2025
7B-2510 (c), (c1), (d) 93 H307 8(a) 8 12/01/2025
7B-2511 93 H307 8(b) 8 12/01/2025
7B-2514 (b), (b1), (g) 93 H307 8(c) 8 12/01/2025
7B-3101 (a) 70 S429 10 10 07/09/2025
7B-4001 25 H40 29(6) 29 06/26/2025
8-50.4 47 S391 13(c) 13 10/01/2025
9-37 Art. 6 54 H620 12.2(a) 12.2 12/01/2025
10B-5 (b)(8), (d) 25 H40 44(b) 44 06/26/2025
10B-5 (b)(8), (e) 25 H40 44(a) 44 06/26/2025
10B-7 25 H40 29(1) 29.1 06/26/2025
10B-25 (n) 33 H388 9(a) 9 07/01/2025
10B-36 25 H40 29(5) 29 06/26/2025
10B-50 25 H40 29(1) 29.1 06/26/2025
10B-51 25 H40 29(1) 29.1 06/26/2025
10B-54 25 H40 29(1) 29.1 06/26/2025
10B-106 25 H40 29(1) 29.1 06/26/2025
10B-126 25 H40 29(6) 29 06/26/2025
10B-200 (b) 33 H388 9(b) 9 07/01/2025
12-3.3 84 H805 1(a) 1 01/01/2026
14-16.6 Art. 5A, title 81 H193 4 4 12/01/2025
14-16.7 81 H193 4 4 12/01/2025
14-16.8 81 H193 4 4 12/01/2025
14-16.10 81 H193 4 4 12/01/2025
14-27.31 (b), (d) 70 S429 9 9 12/01/2025
14-32.6 70 S429 18(a) 18 12/01/2025
14-33 (b) 71 S311 1(a) 1 12/01/2025
14-33 (e) 70 S429 17(a) 17 12/01/2025
14-33.2 70 S429 17(b) 17 12/01/2025
14-34.5 S50 9.1(a) 9.1 12/01/2025 Vetoed
14-34.6 (c) S50 9.1(b) 9.2 12/01/2025 Vetoed
14-35 73 S375 1(b) 1 12/01/2025
14-44.1 25 H40 29(5) 29 06/26/2025
14-49 71 S311 5(a) 5 12/01/2025
14-51 71 S311 10(a) 10 12/01/2025
14-52 71 S311 10(b) 10 12/01/2025
14-53 71 S311 10(c) 10 12/01/2025
14-54 71 S311 10(d) 10 12/01/2025
14-54 (b1) 71 S311 4(a) 4 12/01/2025
14-72 (c1) 71 S311 9(a) 9 12/01/2025
14-72.12 71 S311 4(b) 4 12/01/2025
14-86.5 71 S311 4(c) 4 12/01/2025
14-86.6 71 S311 4(d) 4 12/01/2025
14-113.7A 25 H40 4 4 06/26/2025
14-113.20 25 H40 29(3) 29 06/26/2025
14-113.20 25 H40 29(1) 29.1 06/26/2025
14-113.30 25 H40 29(3) 29 06/26/2025
14-113.31 25 H40 29(3) 29 06/26/2025
14-118.7 25 H40 29(3) 29 06/26/2025
14-159.12 (a)(4) 57 S655 4 4 12/01/2025
14-159.15 94 H926 2(b) 2 10/06/2025
14-159.50 Art. 22D H96 1 1 12/01/2025 Vetoed
14-159.50 Art. 22D 88 S55 1 1 12/01/2025
14-159.51 H96 1 1 12/01/2025 Vetoed
14-159.51 88 S55 1 1 12/01/2025
14-159.52 H96 1 1 12/01/2025 Vetoed
14-159.52 88 S55 1 1 12/01/2025
14-159.53 H96 1 1 12/01/2025 Vetoed
14-159.53 88 S55 1 1 12/01/2025
14-159.54 H96 1 1 12/01/2025 Vetoed
14-159.54 88 S55 1 1 12/01/2025
14-159.55 H96 1 1 12/01/2025 Vetoed
14-159.55 88 S55 1 1 12/01/2025
14-159.56 H96 1 1 12/01/2025 Vetoed
14-159.56 88 S55 1 1 12/01/2025
14-196.3 25 H40 29(3) 29 06/26/2025
14-196.3 25 H40 29(1) 29.1 06/26/2025
14-202 70 S429 8(a) 8 12/01/2025
14-202.3 (c) 70 S429 3(a) 3 12/01/2025
14-202.5 25 H40 29(5) 29 06/26/2025
14-202.5 25 H40 29(3) 29.3 06/26/2025
14-202.5A 25 H40 29(5) 29.5 06/26/2025
14-203 25 H40 29(3) 29.3 06/26/2025
14-203 25 H40 29(5) 29.5 06/26/2025
14-208.6 25 H40 29(1) 29.1 06/26/2025
14-208.6 25 H40 29(3) 29.3 06/26/2025
14-208.12A 70 S429 5(a) 5 12/01/2025
14-208.12B (b), (j) 70 S429 5(b) 5 12/01/2025
14-208.15 25 H40 29(3) 29.3 06/26/2025
14-208.19 25 H40 29(1) 29.1 06/26/2025
14-269 S50 4 4 12/01/2025 Vetoed
14-269.1 S50 5 5 12/01/2025 Vetoed
14-269.2 (a)(1d), (1e) 81 H193 1 1 12/01/2025
14-269.2 (g)(8) 81 H193 2 2 12/01/2025
14-269.2 (k1) 81 H193 3 3 12/01/2025
14-269.3 S50 6 6 12/01/2025 Vetoed
14-269.4 (6) S50 7 7 12/01/2025 Vetoed
14-277.2 (d) S50 8 8 12/01/2025 Vetoed
14-277.3A 25 H40 29(1) 29.1 06/26/2025
14-288.1 (3), (4b), (11) 18 H251 4(a) 4 12/01/2025
14-288.6 18 H251 4(b) 4 12/01/2025
14-288.9 25 H40 30 30 06/26/2025
14-313 25 H40 29(3) 29.3 06/26/2025
14-318.2 (c) 4 H74 5.4(a) 5.4 05/14/2025
14-318.2 (d) 59 S442 2(a) 2 07/01/2025
14-318.4 16 H612 3.2 3.2 12/01/2025
14-318.4 (c) 4 H74 5.4(b) 5.4 05/14/2025
14-318.4 (c1) 59 S442 2(b) 2 07/01/2025
14-318.4 (d)(2) 59 S442 2(b) 2 07/01/2025
14-318.7 70 S429 1(a) 1 12/01/2025
14-326.1 70 S429 16(a) 16 07/01/2025
14-344.1 25 H40 29(3) 29.3 06/26/2025
14-344.1 25 H40 29(5) 29.5 06/26/2025
14-344.2 25 H40 29(3) 29.3 06/26/2025
14-344.2 25 H40 29(5) 29.5 06/26/2025
14-395 20 H91 2.2 2.2 06/26/2025
14-401.24 (c)(5) S50 9 9 12/01/2025 Vetoed
14-409.40 (f) S50 10 10 12/01/2025 Vetoed
14-409.44 70 S429 23(a) 23 10/01/2025
14-409.45 81 H193 7 7 07/29/2025
14-409.46 81 H193 7 7 07/29/2025
14-409.46A 81 H193 7 7 07/29/2025
14-415.1 71 S311 8(a) 8 12/01/2025
14-415.1 1 S50 15.6 15.6 12/01/2025 Vetoed
14-415.1 (a2) 2 S50 15.5 15.5 12/01/2025 Vetoed
14-415.4 (e)(2) S50 11 11 12/01/2025 Vetoed
14-415.10A S50 2 2 12/01/2025 Vetoed
14-415.11 (a) S50 12 12 12/01/2025 Vetoed
14-415.12 (a)(4)d. 51 S710 3(a) 3 10/01/2025
14-415.12 (b)(7), (11) S50 3 3 12/01/2025 Vetoed
14-415.14 25 H40 29(1) 29.1 06/26/2025
14-415.14 (a1) 72 S118 7(a) 7 10/01/2025
14-415.16 25 H40 29(1) 29.1 06/26/2025
14-415.16 (a) 72 S118 7(b) 7.1 10/01/2025
14-415.19 (a2) 72 S118 1(a) 1 07/01/2025
14-415.22 S50 13 13 12/01/2025 Vetoed
14-415.35 Art. 54C S50 1 1 12/01/2025 Vetoed
14-415.36 S50 1 1 12/01/2025 Vetoed
14-433 25 H40 29(3) 29.3 06/26/2025
14-453 25 H40 29(1) 29.1 06/26/2025
14-453 25 H40 29(3) 29.3 06/26/2025
14-453 25 H40 29(5) 29.5 06/26/2025
14-458 25 H40 29(1) 29.1 06/26/2025
14-458.1 25 H40 29(1) 29.1 06/26/2025
14-458.1 25 H40 29(3) 29.3 06/26/2025
14-458.1 25 H40 29(5) 29.5 06/26/2025
14-458.2 25 H40 29(1) 29.1 06/26/2025
14-458.2 25 H40 29(3) 29.3 06/26/2025
14-458.2 25 H40 29(5) 29.5 06/26/2025
15-155.1 Art. 15A 25 H40 5 5 06/26/2025
15-155.2 25 H40 5 5 06/26/2025
15-155.3 25 H40 5 5 06/26/2025
15-187 93 H307 6.5(a) 6.5 10/03/2025
15-188 93 H307 6.5(b) 6.5 10/03/2025
15-188.1 93 H307 6.5(c) 6.5 10/03/2025
15-190 (a) 93 H307 6.5(d) 6.5 10/03/2025
15A-101.1 25 H40 29(3) 29.3 06/26/2025
15A-145 25 H40 31(b) 31 06/26/2025
15A-145.1 25 H40 31(c) 31 06/26/2025
15A-145.2 (a)(2), (a1) 25 H40 31(d) 31 06/26/2025
15A-145.3 (a), (b1) 25 H40 31(e) 31 06/26/2025
15A-145.4 (c)(2), (f) 25 H40 31(f) 31 06/26/2025
15A-145.5 25 H40 31(a) 31 06/26/2025
15A-145.5 (c)(1)a. 71 S311 12(a) 12 07/09/2025
15A-145.6 (c)(2), (g) 25 H40 31(g) 31 06/26/2025
15A-145.7 (a)(2), (b) 25 H40 31(h) 31 06/26/2025
15A-145.8 (a) 25 H40 31(i) 31 06/26/2025
15A-145.8A (f) 25 H40 31(j) 31 06/26/2025
15A-145.9 (g) 25 H40 31(k) 31 06/26/2025
15A-146 (a3) 25 H40 31(l) 31 06/26/2025
15A-147 (b) 25 H40 31(m) 31 06/26/2025
15A-149 (c) 25 H40 31(n) 31 06/26/2025
15A-151 (a)(10) 51 S710 3(b) 3 10/01/2025
15A-153 (a), (b) 25 H40 31(o) 31 06/26/2025
15A-401 (b) 70 S429 17(c) 17 12/01/2025
15A-501 (2a) 93 H307 1(a) 1 12/01/2025
15A-531 (9) 93 H307 1(b) 1 12/01/2025
15A-533 97 S449 5.3(b) 5.3 10/22/2025
15A-533 (b), (b1) 93 H307 1(c) 1 12/01/2025
15A-534 1 93 H307 1(d) 1 12/01/2025
15A-534 (d4) 2 85 H318 2 2 10/01/2025
15A-534 (h) 3 54 H620 10(d) 10 12/01/2025
15A-534 (b) 4 97 S449 5.3(a) 5.3 10/22/2025
15A-534.1 (a) 70 S429 17(d) 17 12/01/2025
15A-534.2 (d) 27 H576 4.2(a) 4.2 06/27/2025
15A-534.9 81 H193 6 6 12/01/2025
15A-535 97 S449 5.3(b) 5.3 10/22/2025
15A-535 (b) 93 H307 1(e) 1 12/01/2025
15A-960 (c) 54 H620 10(c) 10 12/01/2025
15A-1003 (a1) 93 H307 7(a) 7 12/01/2025
15A-1008 (c), (d) 93 H307 7(b) 7 12/01/2025
15A-1052 (b) 70 S429 4(a) 4 07/09/2025
15A-1053 (b) 70 S429 4(b) 4 07/09/2025
15A-1241 (b) 70 S429 11(a) 11 07/09/2025
15A-1340.16 (d)(19c) 93 H307 2(a) 2 12/01/2025
15A-1340.50 Art. 81D 16 H612 3.1 3.1 12/01/2025
15A-1341 25 H40 29(5) 29.5 06/26/2025
15A-1354 (a) 70 S429 19(a) 19 12/01/2025
15A-1415 70 S429 15(a) 15 12/01/2025
15A-1415 (a) 93 H307 6(a) 6 12/01/2025
15A-1419 (a)(4) 70 S429 15(b) 15 12/01/2025
15A-2000 (d)(1) 1 93 H307 6(b) 6 12/01/2025
15A-2000 (e)(12) 2 93 H307 2(b) 2 12/01/2025
15A-2007 93 H307 6(c) 6 12/01/2025
15B-11 (a) 70 S429 7(a) 7 07/09/2025
15C-12 25 H40 29(6) 29 06/26/2025
17C-6 (a)(13b) 47 S391 13(d) 13 10/01/2025
17C-10.1 (g) 20 H91 1.1 1.1 06/26/2025
17C-10.2 51 S710 6(a) 6 07/02/2025
17E-7.1 51 S710 6(b) 6 07/02/2025
18B-105 25 H40 29(6) 29 06/26/2025
18B-203 (a)(23) 51 S710 4(a) 4 10/01/2025
18B-501 25 H40 29(5) 29.5 06/26/2025
18B-502 (c) 51 S710 5 5 07/02/2025
18B-903 (c1) 65 S664 2(a) 2 07/07/2025
18B-907 25 H40 29(5) 29.5 06/26/2025
18B-1001 25 H40 29(3) 29.3 06/26/2025
18B-1001 (11) 94 H926 5 5 10/06/2025
18B-1001 (3), (5), (10) 65 S664 4(a) 4 10/01/2025
18B-1001.4 25 H40 29(3) 29.3 06/26/2025
18B-1105 (a1) 65 S664 2(b) 2 07/07/2025
18C-912 25 H40 29(1) 29.1 06/26/2025
19A-27.5 H96 3 3 * Vetoed
20-7 25 H40 29(5) 29.5 06/26/2025
20-7 (f)(6) 1 91 S245 1 1 09/30/2025
20-7 (f)(6)a.4. 2 72 S118 5(a) 5 10/01/2025
20-7 (f)(6)a.4. 3 91 S245 3 3 09/30/2025
20-7.1 25 H40 29(1) 29.1 06/26/2025
20-7.3 25 H40 29(5) 29.5 06/26/2025
20-11 (f) 1 91 S245 2 2 09/30/2025
20-11 (n) 2 56 S125 2(a) 2 07/03/2025
20-13.2 (c1) 56 S125 2(b) 2 07/03/2025
20-16 (a)(6a) 45 H737 8(a) 8 07/01/2026
20-17 (a)(4) 71 S311 7(a) 7 12/01/2025
20-37.7 25 H40 29(5) 29.5 06/26/2025
20-37.22 25 H40 29(6) 29 06/26/2025
20-43.1 25 H40 29(1) 29.1 06/26/2025
20-43.2 25 H40 29(5) 29.5 06/26/2025
20-43.2 (c) 60 S600 2(d) 2 01/01/2027
20-48 25 H40 29(1) 29.1 06/26/2025
20-54 (14) 47 S391 13(e) 13 10/01/2025
20-62.1 25 H40 29(3) 29.3 06/26/2025
20-62.1 (a) 47 S391 19(a) 19 10/01/2025
20-66 25 H40 29(1) 29.1 06/26/2025
20-77 25 H40 29(5) 29.5 06/26/2025
20-77 (b) 54 H620 6(h) 6 12/01/2025
20-79 (c), (c1) 22 H421 2 2 10/01/2025
20-79.4 (b)(175) 97 S449 10.2 10.2 07/01/2025
20-79.6 (b) 54 H620 19(b) 9 07/02/2025
20-79.8 25 H40 29(5) 29.5 06/26/2025
20-127 (f) 47 S391 21 21 07/01/2025
20-127 (g) 47 S391 22(d) 22 12/01/2025
20-137.3 25 H40 29(1) 29.1 06/26/2025
20-137.3 25 H40 29(3) 29.3 06/26/2025
20-137.4A 25 H40 29(1) 29.1 06/26/2025
20-138.7 (a) 65 S664 4(b) 4 10/01/2025
20-138.7 (d) 27 H576 4.2(b) 4.2 06/27/2025
20-140 (g), (h) 71 S311 6(a) 6 12/01/2025
20-141.3 71 S311 7(b) 7 12/01/2025
20-146 (f) 47 S391 17(a) 17 12/01/2025
20-160.1 (a) 70 S429 12(a) 12 12/01/2025
20-166 71 S311 7(c) 7 12/01/2025
20-175.2 70 S429 13(a) 13 12/01/2025
20-179 71 S311 11(a) 11 12/01/2025
20-179.3 (b)(2) 71 S311 7(d) 7 12/01/2025
20-179.5 71 S311 11(b) 11 12/01/2025
20-183.3 (a)(5) 47 S391 22(a) 22 12/01/2025
20-183.7 (a) 47 S391 22(b) 22 12/01/2025
20-183.7B (b)(9)o. 47 S391 22(c) 22 12/01/2025
20-183.7B (c)(7)o. 47 S391 22(c) 22 12/01/2025
20-219.3A 71 S311 11.5(a) 11.5 12/01/2025
20-219.15 71 S311 11.5(b) 11.5 07/09/2025
20-279.21 4 H74 6.2 6,2 05/14/2025
20-286 (11)a.6., 7. 41 S295 4 4 07/01/2025
20-286 (15a), (15b) 41 S295 5 5 07/01/2025
20-288 (b2) 47 S391 2 2 07/01/2025
20-295 (b) 22 H421 1 1 10/01/2025
20-301.1 25 H40 29(3) 29.3 06/26/2025
20-302 25 H40 29(5) 29.5 06/26/2025
20-305 (4) 1 41 S295 1 1 07/01/2025
20-305 (4) 2 41 S295 3 3 07/01/2025
20-305 (6) 3 41 S295 1 1 07/01/2025
20-305 (7) 4 41 S295 6 6 07/01/2025
20-305 (33) 5 41 S295 9 9 07/01/2025
20-305 (57) 6 41 S295 2 2 07/01/2025
20-305 (58), (59) 7 41 S295 7 7 07/01/2025
20-305.1 41 S295 8 8 07/01/2025
20-305.1 25 H40 29(5) 29.5 06/26/2025
20-309 25 H40 29(5) 29.5 06/26/2025
20-309 (a3) 45 H737 8(b) 8 07/01/2026
20-309.2 (a)(4), (a1) 45 H737 8(c) 8 07/01/2026
20-315 25 H40 29(3) 29.3 06/26/2025
20-322 47 S391 1 1 07/01/2025
20-329 (c) 47 S391 24 24 07/01/2025
24-10 (g) 43 H762 2 2 07/01/2025
25-1-201 25 H40 108 108 10/01/2025
25-1-204 25 H40 109 109 10/01/2025
25-1-301 25 H40 110 110 10/01/2025
25-1-306 25 H40 111 111 10/01/2025
25-2-102 25 H40 113 113 10/01/2025
25-2-103 25 H40 114 114 10/01/2025
25-2-104 25 H40 112 112 10/01/2025
25-2-105 25 H40 112 112 10/01/2025
25-2-106 25 H40 115 115 10/01/2025
25-2-107 25 H40 112 112 10/01/2025
25-2-201 25 H40 116 116 10/01/2025
25-2-202 25 H40 117 117 10/01/2025
25-2-203 25 H40 118 118 10/01/2025
25-2-204 25 H40 112 112 10/01/2025
25-2-205 25 H40 119 119 10/01/2025
25-2-206 25 H40 112 112 10/01/2025
25-2-207 25 H40 112 112 10/01/2025
25-2-209 25 H40 120 120 10/01/2025
25-2-210 25 H40 112 112 10/01/2025
25-2-302 25 H40 112 112 10/01/2025
25-2-304 25 H40 112 112 10/01/2025
25-2-305 25 H40 112 112 10/01/2025
25-2-306 25 H40 112 112 10/01/2025
25-2-308 25 H40 112 112 10/01/2025
25-2-309 25 H40 112 112 10/01/2025
25-2-310 25 H40 112 112 10/01/2025
25-2-311 25 H40 112 112 10/01/2025
25-2-312 25 H40 112 112 10/01/2025
25-2-313 25 H40 112 112 10/01/2025
25-2-314 25 H40 112 112 10/01/2025
25-2-316 25 H40 112 112 10/01/2025
25-2-317 25 H40 112 112 10/01/2025
25-2-319 25 H40 112 112 10/01/2025
25-2-320 25 H40 112 112 10/01/2025
25-2-321 25 H40 112 112 10/01/2025
25-2-322 25 H40 112 112 10/01/2025
25-2-323 25 H40 112 112 10/01/2025
25-2-324 25 H40 112 112 10/01/2025
25-2-325 25 H40 112 112 10/01/2025
25-2-325 25 H40 112 112 10/01/2025
25-2-326 25 H40 112 112 10/01/2025
25-2-327 25 H40 112 112 10/01/2025
25-2-328 25 H40 112 112 10/01/2025
25-2-401 25 H40 112 112 10/01/2025
25-2-402 25 H40 112 112 10/01/2025
25-2-403 25 H40 112 112 10/01/2025
25-2-501 25 H40 112 112 10/01/2025
25-2-502 25 H40 112 112 10/01/2025
25-2-504 25 H40 112 112 10/01/2025
25-2-505 25 H40 112 112 10/01/2025
25-2-506 25 H40 112 112 10/01/2025
25-2-507 25 H40 112 112 10/01/2025
25-2-508 25 H40 112 112 10/01/2025
25-2-510 25 H40 112 112 10/01/2025
25-2-511 25 H40 112 112 10/01/2025
25-2-512 25 H40 112 112 10/01/2025
25-2-513 25 H40 112 112 10/01/2025
25-2-515 25 H40 112 112 10/01/2025
25-2-601 25 H40 112 112 10/01/2025
25-2-602 25 H40 112 112 10/01/2025
25-2-603 25 H40 112 112 10/01/2025
25-2-605 25 H40 112 112 10/01/2025
25-2-606 25 H40 112 112 10/01/2025
25-2-607 25 H40 112 112 10/01/2025
25-2-608 25 H40 112 112 10/01/2025
25-2-608 25 H40 112 112 10/01/2025
25-2-609 25 H40 112 112 10/01/2025
25-2-610 25 H40 112 112 10/01/2025
25-2-611 25 H40 112 112 10/01/2025
25-2-612 25 H40 112 112 10/01/2025
25-2-613 25 H40 112 112 10/01/2025
25-2-614 25 H40 112 112 10/01/2025
25-2-615 25 H40 112 112 10/01/2025
25-2-616 25 H40 112 112 10/01/2025
25-2-702 25 H40 112 112 10/01/2025
25-2-703 25 H40 112 112 10/01/2025
25-2-704 25 H40 112 112 10/01/2025
25-2-705 25 H40 112 112 10/01/2025
25-2-706 25 H40 112 112 10/01/2025
25-2-707 25 H40 112 112 10/01/2025
25-2-708 25 H40 112 112 10/01/2025
25-2-709 25 H40 112 112 10/01/2025
25-2-711 25 H40 112 112 10/01/2025
25-2-712 25 H40 112 112 10/01/2025
25-2-713 25 H40 112 112 10/01/2025
25-2-714 25 H40 112 112 10/01/2025
25-2-715 25 H40 112 112 10/01/2025
25-2-716 25 H40 112 112 10/01/2025
25-2-718 25 H40 112 112 10/01/2025
25-2-719 25 H40 112 112 10/01/2025
25-2-722 25 H40 112 112 10/01/2025
25-2-723 25 H40 112 112 10/01/2025
25-2-725 25 H40 112 112 10/01/2025
25-2A-102 25 H40 121 121 10/01/2025
25-2A-103 25 H40 122 122 10/01/2025
25-2A-104 25 H40 112 112 10/01/2025
25-2A-105 25 H40 112 112 10/01/2025
25-2A-106 25 H40 112 112 10/01/2025
25-2A-107 25 H40 123 123 10/01/2025
25-2A-108 25 H40 112 112 10/01/2025
25-2A-109 25 H40 112 112 10/01/2025
25-2A-201 25 H40 124 124 10/01/2025
25-2A-202 25 H40 125 125 10/01/2025
25-2A-203 25 H40 126 126 10/01/2025
25-2A-204 25 H40 112 112 10/01/2025
25-2A-205 25 H40 127 127 10/01/2025
25-2A-206 25 H40 112 112 10/01/2025
25-2A-208 25 H40 128 128 10/01/2025
25-2A-209 25 H40 112 112 10/01/2025
25-2A-210 25 H40 112 112 10/01/2025
25-2A-211 25 H40 112 112 10/01/2025
25-2A-212 25 H40 112 112 10/01/2025
25-2A-214 25 H40 112 112 10/01/2025
25-2A-215 25 H40 112 112 10/01/2025
25-2A-217 25 H40 112 112 10/01/2025
25-2A-218 25 H40 112 112 10/01/2025
25-2A-219 25 H40 112 112 10/01/2025
25-2A-220 25 H40 112 112 10/01/2025
25-2A-221 25 H40 112 112 10/01/2025
25-2A-303 25 H40 112 112 10/01/2025
25-2A-304 25 H40 112 112 10/01/2025
25-2A-305 25 H40 112 112 10/01/2025
25-2A-307 25 H40 112 112 10/01/2025
25-2A-308 25 H40 112 112 10/01/2025
25-2A-309 25 H40 112 112 10/01/2025
25-2A-310 25 H40 112 112 10/01/2025
25-2A-401 25 H40 112 112 10/01/2025
25-2A-402 25 H25 112 112 10/01/2025
25-2A-403 25 H40 112 112 10/01/2025
25-2A-404 25 H40 112 112 10/01/2025
25-2A-405 25 H40 112 112 10/01/2025
25-2A-406 25 H40 112 112 10/01/2025
25-2A-407 25 H40 112 112 10/01/2025
25-2A-501 25 H40 112 112 10/01/2025
25-2A-503 25 H40 112 112 10/01/2025
25-2A-504 25 H40 112 112 10/01/2025
25-2A-505 25 H40 112 112 10/01/2025
25-2A-506 25 H40 112 112 10/01/2025
25-2A-507 25 H40 112 112 10/01/2025
25-2A-508 25 H40 112 112 10/01/2025
25-2A-509 25 H40 112 112 10/01/2025
25-2A-510 25 H40 112 112 10/01/2025
25-2A-511 25 H40 112 112 10/01/2025
25-2A-512 25 H40 112 112 10/01/2025
25-2A-513 25 H40 112 112 10/01/2025
25-2A-514 25 H40 112 112 10/01/2025
25-2A-515 25 H40 112 112 10/01/2025
25-2A-516 25 H40 112 112 10/01/2025
25-2A-517 25 H40 112 112 10/01/2025
25-2A-517 25 H40 112 112 10/01/2025
25-2A-518 25 H40 112 112 10/01/2025
25-2A-519 25 H40 112 112 10/01/2025
25-2A-520 25 H40 112 112 10/01/2025
25-2A-521 25 H40 112 112 10/01/2025
25-2A-522 25 H40 112 112 10/01/2025
25-2A-523 25 H40 112 112 10/01/2025
25-2A-524 25 H40 112 112 10/01/2025
25-2A-525 25 H40 112 112 10/01/2025
25-2A-526 25 H40 112 112 10/01/2025
25-2A-527 25 H40 112 112 10/01/2025
25-2A-528 25 H40 112 112 10/01/2025
25-2A-529 25 H40 112 112 10/01/2025
25-2A-531 25 H40 112 112 10/01/2025
25-3-104 25 H40 129 129 10/01/2025
25-3-105 25 H40 130 130 10/01/2025
25-3-401 25 H40 131 131 10/01/2025
25-3-604 25 H40 132 132 10/01/2025
25-4A-103 25 H40 133(b) 133 10/01/2025
25-4A-103 (a)(1), (a)(3a) 25 H40 133(a) 133 10/01/2025
25-4A-201 25 H40 134 134 10/01/2025
25-4A-202 25 H40 135 135 10/01/2025
25-4A-203 25 H40 136 136 10/01/2025
25-4A-207 25 H40 137 137 10/01/2025
25-4A-208 25 H40 138 138 10/01/2025
25-4A-210 (a) 25 H40 139 139 10/01/2025
25-4A-211 25 H40 140 140 10/01/2025
25-4A-305 25 H40 141 141 10/01/2025
25-5-104 25 H40 142 142 10/01/2025
25-5-116 25 H40 143 143 10/01/2025
25-6-620 25 H40 104 104 10/01/2025
25-7-102 25 H40 144 144 10/01/2025
25-7-106 25 H40 145 145 10/01/2025
25-8-102 25 H40 146 146 10/01/2025
25-8-103 25 H40 147 147 10/01/2025
25-8-106 25 H40 148 148 10/01/2025
25-8-303 25 H40 150 150 10/01/2025
25-9-102 25 H40 58 58 10/01/2025
25-9-104 25 H40 59 59 10/01/2025
25-9-105 25 H40 60 60 10/01/2025
25-9-105.1 25 H40 61 61 10/01/2025
25-9-107.1 25 H40 62 62 10/01/2025
25-9-107.2 25 H40 63 63 10/01/2025
25-9-110 25 H40 149 149 10/01/2025
25-9-201 25 H40 34(b) 34 10/01/2025
25-9-203 25 H40 64 64 10/01/2025
25-9-204 25 H40 65 64 10/01/2025
25-9-207 25 H40 66 66 10/01/2025
25-9-208 25 H40 67 67 10/01/2025
25-9-209 25 H40 68 68 10/01/2025
25-9-210 25 H40 69 69 10/01/2025
25-9-301 25 H40 70 70 10/01/2025
25-9-304 (a), (b) 25 H40 71 71 10/01/2025
25-9-305 25 H40 72 72 10/01/2025
25-9-306.1 25 H40 73 73 10/01/2025
25-9-306.2 25 H40 74 74 10/01/2025
25-9-310 25 H40 75 75 10/01/2025
25-9-312 25 H40 76 76 10/01/2025
25-9-313 25 H40 77 77 10/01/2025
25-9-314 25 H40 78 78 10/01/2025
25-9-314.1 25 H40 79 79 10/01/2025
25-9-316 25 H40 80 80 10/01/2025
25-9-317 25 H40 81 81 10/01/2025
25-9-323 25 H40 82 82 10/01/2025
25-9-324 25 H40 83 83 10/01/2025
25-9-326.1 25 H40 84 84 10/01/2025
25-9-330 25 H40 85 85 10/01/2025
25-9-331 25 H40 86 86 10/01/2025
25-9-332 25 H40 87 87 10/01/2025
25-9-334 25 H40 88 88 10/01/2025
25-9-341 25 H40 89 89 10/01/2025
25-9-404 25 H40 90 90 10/01/2025
25-9-406 25 H40 91 91 10/01/2025
25-9-408 25 H40 92 92 10/01/2025
25-9-509 25 H40 93 93 10/01/2025
25-9-513 25 H40 94 94 10/01/2025
25-9-601 25 H40 95 95 10/01/2025
25-9-605 25 H40 96 96 10/01/2025
25-9-608 25 H40 97 97 10/01/2025
25-9-611 25 H40 98 98 10/01/2025
25-9-613 25 H40 99 99 10/01/2025
25-9-614 25 H40 100 100 10/01/2025
25-9-615 25 H40 101 101 10/01/2025
25-9-616 25 H40 102 102 10/01/2025
25-9-619 25 H40 103 103 10/01/2025
25-9-621 25 H40 105 105 10/01/2025
25-9-624 25 H40 106 106 10/01/2025
25-9-628 25 H40 107 107 10/01/2025
25-12-101 Art. 12 25 H40 57 57 10/01/2025
25-12-102 25 H40 57 57 10/01/2025
25-12-103 25 H40 57 57 10/01/2025
25-12-104 25 H40 57 57 10/01/2025
25-12-105 25 H40 57 57 10/01/2025
25-12-106 25 H40 57 57 10/01/2025
25-12-107 25 H40 57 57 10/01/2025
28A-2-4 25 H40 52 52 01/01/2026
28A-2A-8 33 H388 8.2 8.2 01/01/2026
28A-2A-15 54 H620 6(b) 6 12/01/2025
28A-2A-17 (a) 54 H620 6(c) 6 12/01/2025
28A-2B-1 33 H388 8.3 8.3 01/01/2026
28A-2B-3 33 H388 8.4 8 01/01/2026
28A-5-1 (b) 54 H620 6(d) 6 12/01/2025
28A-5-2 (b)(1) 54 H620 6(e) 6 12/01/2025
28A-21-3 54 H620 6(f) 6 12/01/2025
28A-25-6 33 H388 12.5 12 06/30/2025
28A-28-2 (a) 54 H620 6(g) 6 12/01/2025
28C-1 44 H537 1 1 07/01/2025
28C-2 44 H537 2 2 07/01/2025
28C-10 54 H620 8 8 07/02/2025
29-19 (b)(1), (2) 75 H992 3 3 12/01/2025
29-30 25 H40 1(b) 1 06/26/2025
29-30 (a), (d), (e) 54 H620 6(a) 6 12/01/2025
29-30 (a)(2a) 25 H40 47(a) 47 06/26/2025
30-3.3A (e) 33 H388 10.1 10 01/01/2026
30-3.4 33 H388 10.2 10 01/01/2026
30-15 33 H388 12.1 12 01/01/2026
30-17 33 H388 12.2 12 01/01/2026
30-20 33 H388 12.3 12 01/01/2026
30-23.1 33 H388 12.4 12 01/01/2026
30-41 Art. 5 25 H40 51 51 01/01/2026
30-42 25 H40 51 51 01/01/2026
30-43 25 H40 51 51 01/01/2026
30-44 25 H40 51 51 01/01/2026
30-45 25 H40 51 51 01/01/2026
30-46 25 H40 51 51 01/01/2026
30-47 25 H40 51 51 01/01/2026
30-48 25 H40 51 51 01/01/2026
30-49 25 H40 51 51 01/01/2026
30-50 25 H40 51 51 01/01/2026
30-51 25 H40 51 51 01/01/2026
30-52 25 H40 51 51 01/01/2026
31-3.1 33 H388 8.5 8 01/01/2026
31-3.2 33 H388 8.6 8 01/01/2026
31-5.1 33 H388 8.7 8 01/01/2026
31-11 54 H620 6(i) 6 12/01/2025
31-71 Art. 11 33 H388 8.1 8.1 01/01/2026
31-72 33 H388 8.1 8.1 01/01/2026
31-73 33 H388 8.1 81 01/01/2026
31B-2.1 25 H40 29(1) 29.1 06/26/2025
31C-1 Chapter 25 H40 50 50 01/01/2026
31C-2 25 H40 50 50 01/01/2026
31C-3 25 H40 50 50 01/01/2026
31C-4 25 H40 50 50 01/01/2026
31C-5 25 H40 50 50 01/01/2026
31C-6 25 H40 50 50 01/01/2026
31C-7 25 H40 50 50 01/01/2026
31C-8 25 H40 50 50 01/01/2026
31C-9 25 H40 50 50 01/01/2026
31C-10 25 H40 50 50 01/01/2026
31C-11 25 H40 50 50 01/01/2026
31C-12 25 H40 50 50 01/01/2026
35A-1216 25 H40 29(6) 29.6 06/26/2025
35A-1230 54 H620 5(a) 5 12/01/2025
35A-1231 (a) 54 H620 5(b) 5 12/01/2025
35A-1261 54 H620 5(c) 5 12/01/2025
35A-1295 (a) 54 H620 5(d) 5 12/01/2025
36C-6-604 33 H388 11.1 11 01/01/2026
39-13.3 25 H40 48(a) 48 10/01/2025
40A-3 (c)(14) 39 H948 8.1 8.1 07/01/2025
41-63 25 H40 48(b) 48 10/01/2025
41-71 25 H40 31.1(a) 31.1 06/30/2020
42-46 (i) 54 H620 12.4 12.4 09/09/2024
42-46 (i)(3), (4) 52 S690 3(a) 3 09/09/2024
42-46 (l) 45 H737 10 10 07/01/2025
44A-11.2 25 H40 29(1) 29.1 06/26/2025
44A-11.2 25 H40 29(5) 29.5 06/26/2025
44A-40 25 H40 151 151 06/26/2025
44A-40 25 H40 29(1) 29.1 06/26/2025
44A-43 25 H40 29(1) 29.1 06/26/2025
44A-43 25 H40 29(5) 29.5 06/26/2025
45-21.12A (d)(1)a. 20 H91 2.3 2.3 06/26/2025
45-36.5 25 H40 29(1) 29.1 06/26/2025
47-36.2 25 H40 29(1) 29.1 06/26/2025
47-81.2 20 H91 2.4 2.4 06/26/2025
47C-3-108 25 H40 29(1) 29.1 06/26/2025
47C-3-108 25 H40 29(3) 29.3 06/26/2025
47E-4 25 H40 29(1) 29.1 06/26/2025
47F-3-108 25 H40 29(1) 29.1 06/26/2025
47F-3-108 25 H40 29(3) 29.3 06/26/2025
48-1-101 (13a) 16 H612 1.18(d) 1.18 10/01/2025
48-1-106 (c) 16 H612 1.18(d) 1.18 10/01/2025
48-2-100 (a1) 16 H612 1.18(d) 1.18 10/01/2025
48-2-305 (2) 16 H612 1.18(d) 1.18 10/01/2025
48-3-203 (a1)(1), (2) 59 S442 1(c) 1 07/03/2025
48-3-205 25 H40 46(b) 46 06/26/2025
48-3-230 Art. 3, Part 2A 25 H40 46(a) 46 06/26/2025
48-3-231 25 H40 46(a) 46 06/26/2025
48-3-232 25 H40 46(a) 46 06/26/2025
48-3-233 25 H40 46(a) 46 06/26/2025
48-3-234 25 H40 46(a) 46 06/26/2025
48-3-235 25 H40 46(a) 46 06/26/2025
48-3-236 25 H40 46(a) 46 06/26/2025
48-3-237 25 H40 46(a) 46 06/26/2025
48-3-238 25 H40 46(a) 46 06/26/2025
48-3-239 25 H40 46(a) 46 06/26/2025
48-3-309 25 H40 32 32 06/26/2025
48-3-309 (e) 27 H576 5.3(a) 5.3 06/27/2025
48-3-610 16 H612 1.18(d) 1.18 10/01/2025
48-3-702 (b1)(3) 16 H612 1.18(d) 1.18 10/01/2025
48-3-703 (a)(8) 16 H612 1.18(d) 1.18 10/01/2025
48-3-705 (c)(1) 16 H612 1.18(d) 1.18 10/01/2025
48-3-706 (c1) 16 H612 1.18(d) 1.18 10/01/2025
48-9-107 9 S248 1 1 01/01/2026
48-10-101 25 H40 29(1) 29.1 06/26/2025
48-10-101 25 H40 29(3) 29.3 06/26/2025
48-10-101 25 H40 29(5) 29.5 06/26/2025
50-11 25 H40 1(c) 1 06/26/2025
50-13.2 25 H40 29(1) 29.1 06/26/2025
50-13.2 25 H40 29(3) 29.3 06/26/2025
50-13.2B 16 H612 1.18(c) 1.18 10/01/2025
50-13.10 (d) 16 H612 1.21(a) 1.21 10/01/2025
50-18 20 H91 2.5 2.5 06/26/2025
50-20 25 H40 48(d) 48 10/01/2025
50-20 25 H40 48(c) 48 10/01/2025
50A-1 Chapter title 25 H40 45(a) 45 10/01/2025
50A-351 (18) 20 H91 2.6 2.6 06/26/2025
50A-411 Art. 4 25 H40 45(b) 45 10/01/2025
50A-412 25 H40 45(b) 45 10/01/2025
50A-413 25 H40 45(b) 45 10/01/2025
50A-414 25 H40 45(b) 45 10/01/2025
50A-415 25 H40 45(b) 45 10/01/2025
50A-416 25 H40 45(b) 45 10/01/2025
50A-417 25 H40 45(b) 45 10/01/2025
50A-418 25 H40 45(b) 45 10/01/2025
50A-419 25 H40 45(b) 45 10/01/2025
50A-420 25 H40 45(b) 45 10/01/2025
50A-421 25 H40 45(b) 45 10/01/2025
50A-422 25 H40 45(b) 45 10/01/2025
50B-2 54 H620 9(a) 9 07/02/2025
50B-2 (a) 70 S429 6(a) 6 12/01/2025
50B-3.1 70 S429 20(a) 20 12/01/2025
50B-4 (a) 54 H620 9(b) 9 07/02/2025
52-10 25 H40 1(d) 1 06/26/2025
52-244.100 43 H762 1 1 10/01/2025
52-244.144 43 H762 1 1 10/01/2025
52C-3-305 25 H40 29(1) 29.1 06/26/2025
52C-3-316 25 H40 29(1) 29.1 06/26/2025
53-180.1 25 H40 29(1) 29.1 06/26/2025
53-208.43 25 H40 29(5) 29.5 06/26/2025
53-244.010 Art. 19B, Part 1 43 H762 1 1 10/01/2025
53-244.020 43 H762 1 1 10/01/2025
53-244.030 43 H762 1 1 10/01/2025
53-244.040 43 H762 1 1 10/01/2025
53-244.050 43 H762 1 1 10/01/2025
53-244.060 43 H762 1 1 10/01/2025
53-244.070 43 H762 1 1 10/01/2025
53-244.080 43 H762 1 1 10/01/2025
53-244.090 43 H762 1 1 10/01/2025
53-244.100A 43 H762 1 1 10/01/2025
53-244.101 43 H762 1 1 10/01/2025
53-244.102 43 H762 1 1 10/01/2025
53-244.103 43 H762 1 1 10/01/2025
53-244.104 43 H762 1 1 10/01/2025
53-244.105 43 H762 1 1 10/01/2025
53-244.106 43 H762 1 1 10/01/2025
53-244.107 43 H762 1 1 10/01/2025
53-244.107 25 H40 29(5) 29.5 06/26/2025
53-244.108 43 H762 1 1 10/01/2025
53-244.109 43 H762 1 1 10/01/2025
53-244.110 43 H762 1 1 10/01/2025
53-244.111 43 H762 1 1 10/01/2025
53-244.112 43 H762 1 1 10/01/2025
53-244.113 43 H762 1 1 10/01/2025
53-244.114 43 H762 1 1 10/01/2025
53-244.115 43 H762 1 1 10/01/2025
53-244.116 43 H762 1 1 10/01/2025
53-244.118 43 H762 1 1 10/01/2025
53-244.119 43 H762 1 1 10/01/2025
53-244.120 43 H762 1 1 10/01/2025
53-244.121 43 H762 1 1 10/01/2025
53-244.122 43 H762 1 1 10/01/2025
53-244.141 Art. 19B, Part 2 43 H762 1 1 10/01/2025
53-244.142 43 H762 1 1 10/01/2025
53-244.143 43 H762 1 1 10/01/2025
53-420 25 H40 29(1) 29.1 06/26/2025
53C-1-3 25 H40 29(5) 29.5 06/26/2025
53C-1-4 25 H40 29(5) 29.5 06/26/2025
53C-2-5 25 H40 29(6) 29.6 06/26/2025
53C-6-12 25 H40 29(5) 29.5 06/26/2025
54B-155 25 H40 29(6) 29.6 06/26/2025
54D-1 Chapter 25 H40 158 158 10/01/2025
54D-2 25 H40 158 158 10/01/2025
54D-3 25 H40 158 158 10/01/2025
54D-4 25 H40 158 158 10/01/2025
54D-5 25 H40 158 158 10/01/2025
54D-6 25 H40 158 158 10/01/2025
54D-7 25 H40 158 158 10/01/2025
54D-8 25 H40 158 158 10/01/2025
54D-9 25 H40 158 158 10/01/2025
54D-10 25 H40 158 158 10/01/2025
54D-11 25 H40 158 158 10/01/2025
54D-12 25 H40 158 158 10/01/2025
54D-13 25 H40 158 158 10/01/2025
54D-14 25 H40 158 158 10/01/2025
54D-15 25 H40 158 158 10/01/2025
55-1-64 25 H40 29(5) 29.5 06/26/2025
55-2-02 (b)(3), (e) 33 H388 1 1 10/01/2025
55-2-07 (a) 33 H388 2(a) 2 10/01/2025
55-2-08 33 H388 3(a) 3 10/01/2025
55-3-03 33 H388 2(b) 2 10/01/2025
55-6-04 33 H388 4(a) 4 10/01/2025
55-6-25 33 H388 4(b) 4 10/01/2025
55-7-40.1 33 H388 5(a) 5 10/01/2025
55-7-42 33 H388 5(b) 5 10/01/2025
55-7-44 33 H388 5(c) 5 10/01/2025
55-7-46 33 H388 5(d) 5 10/01/2025
55-7-50 33 H388 3(b) 3 10/01/2025
55-8-25 (e)(2), (4) 33 H388 6 6 07/01/2025
55-11-04 (f) 33 H388 7(a) 7 10/01/2025
55-11-12 33 H388 7(b) 7 10/01/2025
55A-16-24 25 H40 29(5) 29.5 06/26/2025
55A-18-01 Art. 18 79 S416 1 1 12/01/2025
55A-18-02 79 S416 1 1 12/01/2025
55A-18-03 79 S416 1 1 12/01/2025
55A-18-04 79 S416 1 1 12/01/2025
55A-18-05 79 S416 1 1 12/01/2025
55A-18-06 79 S416 1 1 12/01/2025
55A-18-07 79 S416 1 1 12/01/2025
55D-5 25 H40 29(6) 29.6 06/26/2025
57D-1-03 55 S307 1 1 10/01/2025
57D-3-02 55 S307 2 2 10/01/2025
58-2-69 25 H40 29(1) 29.1 06/26/2025
58-2-240 25 H40 29(1) 29.1 06/26/2025
58-2-255 25 H40 29(1) 29.1 06/26/2025
58-3-169 37 H67 6.1(h) 6.1 See Bill
58-3-182 69 S479 7.1 7.1 01/01/2027
58-3-221 25 H40 29(5) 29.5 06/26/2025
58-3-230 (d) 37 H67 5.2(b) 5.2 10/01/2025
58-3-241 37 H67 5.2(a) 5.2 10/01/2025
58-3-241 37 H67 7.2(b) 7.2 10/01/2025
58-6-25 (b), (d)(9) 25 H40 6 5 06/26/2025
58-7-15 76 H1003 2.2(a) 22 10/01/2025
58-7-21 25 H40 29(5) 29.5 06/26/2025
58-10-735 25 H40 29(6) 29.6 06/26/2025
58-10-780 25 H40 29(6) 29.6 06/26/2025
58-19-5 45 H737 3(b) 3 01/01/2026
58-19-15 (b)(11a) 45 H737 3(c) 3 01/01/2026
58-19-25 45 H737 3(d) 3 01/01/2026
58-19-26 45 H737 3(a) 3 01/01/2026
58-19-27 45 H737 3(a) 3 01/01/2026
58-19-28 45 H737 3(a) 3 01/01/2026
58-19-40 45 H737 3(e) 3 01/01/2026
58-19-40 25 H40 29(6) 29.6 06/26/2025
58-21-35 25 H40 29(1) 29.1 06/26/2025
58-22-15 25 H40 29(5) 29.5 06/26/2025
58-26-45 25 H40 29(1) 29.1 06/26/2025
58-26-45 25 H40 29(5) 29.5 06/26/2025
58-28-14 25 H40 29(5) 29.5 06/26/2025
58-30-125 25 H40 29(1) 29.1 06/26/2025
58-33-10 (4a), (4b) 45 H737 7(a) 7 07/01/2025
58-33-30 (d), (e) 45 H737 1(a) 1 10/01/2025
58-33-32 (g) 45 H737 1(b) 1 10/01/2025
58-33-82 (e)(4), (5) 45 H737 7(b) 7 07/01/2025
58-33-82 (f) 45 H737 2(a) 2 10/01/2025
58-33-82.1 45 H737 7(c) 7 07/01/2025
58-33-85 97 S449 6.11 6.11 10/22/2025
58-33-85 (a) 45 H737 6(c) 6 07/01/2025
58-35-85 25 H40 29(1) 29.1 06/26/2025
58-36-10 25 H40 29(5) 29.5 06/26/2025
58-36-15 25 H40 29(1) 29.1 06/26/2025
58-36-15 25 H40 29(5) 29.5 06/26/2025
58-36-30 25 H40 29(5) 29.5 06/26/2025
58-36-43 25 H40 33(a) 33 07/01/2025
58-36-75 45 H737 11 11.1 07/01/2025
58-36-120 25 H40 29(5) 29.5 06/26/2025
58-39-16 25 H40 29(1) 29.1 06/26/2025
58-39-75 (4a) 76 H1003 2.3(b) 2.3 08/08/2025
58-41-15 45 H737 13 13 07/01/2025
58-44A-1 25 H40 29(5) 29.5 06/26/2025
58-44A-10 25 H40 29(1) 29.1 06/26/2025
58-44B-5 25 H40 29(5) 29.5 06/26/2025
58-44B-20 25 H40 29(5) 29.5 06/26/2025
58-44B-35 25 H40 29(6) 29.6 06/26/2025
58-48-10 (5) 45 H737 5(a) 5 07/01/2025
58-48-20 (4), (4a) 45 H737 5(b) 5 07/01/2025
58-48-35 45 H737 5(c) 5 07/01/2025
58-48-50 (a1)(1) 45 H737 5(d) 5 07/01/2025
58-48-85 45 H737 5(e) 5 07/01/2025
58-50-110 25 H40 7(c) 7 01/01/2026
58-50-130 25 H40 7(b) 7 06/26/2025
58-50-130 97 S449 6.6(a) 6.6 10/22/2025
58-50-130 (a)(5)b. 25 H40 7(a) 7 06/26/2025
58-50-285 25 H40 29(5) 29.5 06/26/2025
58-50-292 25 H40 29(5) 29.5 06/26/2025
58-50-296 37 H67 7.2(a) 7.2 10/01/2025
58-50-400 69 S479 5.1(a) 5.1 07/09/2025
58-50-400 Art. 50, Part 8 69 S479 5.1(b)(1) 5.1 07/09/2025
58-50-405 69 S479 5.1(b) 5.1 07/09/2025
58-50-405 (a) 69 S479 5.1(a)(2) 5.1 07/09/2025
58-50-410 69 S479 5.1(a)(3) 5.1 07/09/2025
58-50-410 69 S479 5.1(b) 5.1 07/09/2025
58-50-410 (j) 69 S479 5.2(a) 5.2 01/01/2026
58-50-415 69 S479 5.1(b) 5.1 07/09/2025
58-50-415 69 S479 5.1(a) 5.1 07/09/2025
58-50-420 69 S479 5.1(a)(4) 5.1 07/09/2025
58-50-420 69 S479 5.1(b) 5.1 07/09/2025
58-50-425 69 S479 5.1(a)(5) 5.1 07/09/2025
58-50-425 69 S479 5.1(b) 5.1 07/09/2025
58-50-429 69 S479 5.2(b) 5.2 01/01/2026
58-50-430 69 S479 5.1(b) 5.1 07/09/2025
58-51-37 69 S479 1.1 1.1 10/01/2025
58-56-26 (e) 37 H67 5.2(c) 5.2 10/01/2025
58-56-26 (e) 37 H67 7.2(c) 7.2 10/01/2025
58-56A-1 69 S479 3.1(a) 3.1 10/01/2025
58-56A-3 (b1), (c3), (f) 69 S479 4.1 4.1 10/01/2025
58-56A-4 (g) 69 S479 3.2(a) 3.2 10/01/2025
58-56A-6 69 S479 3.5(a) 3.5 10/01/2025
58-56A-15 69 S479 4.2 4.2 10/01/2025
58-56A-20 69 S479 6.1 6.1 10/01/2025
58-56A-21 69 S479 3.4 3.4 07/09/2025
58-56A-22 69 S479 3.1(b) 3.1 10/01/2025
58-56A-55 37 H67 5.2(d) 5.2 10/01/2025
58-56A-55 37 H67 7.2(d) 7.2 10/01/2025
58-56A-55 69 S479 3.3 3.3 07/09/2025
58-56B-1 Art. 56B 69 S479 2.1 2.1 10/01/2026
58-56B-5 69 S479 2.1 2.1 10/01/2026
58-56B-10 69 S479 2.1 2.1 10/01/2026
58-56B-15 69 S479 2.1 2.1 10/01/2026
58-56B-20 69 S479 2.1 2.1 10/01/2026
58-56B-30 69 S479 2.1 2.1 10/01/2026
58-56B-35 69 S479 2.1 2.1 10/01/2026
58-56B-40 69 S479 2.1 2.1 10/01/2026
58-56B-50 69 S479 2.2(a) 2.2 07/09/2025
58-58-1 76 H1003 2.2(b) 2.2 10/01/2025
58-58-97 76 H1003 2.3(a) 2.3 08/08/2025
58-58-125 76 H1003 2.2(c) 2.2 10/01/2025
58-58-205 25 H40 29(3) 29.3 06/26/2025
58-58-260 25 H40 29(3) 29.3 06/26/2025
58-58-260 25 H40 29(5) 29.5 06/26/2025
58-58-330 25 H40 29(3) 29.3 06/26/2025
58-58-330 (a) 76 H1003 2.2(d) 2.2 10/01/2025
58-58-335 (1a) 20 H91 1.2 1.2 06/26/2025
58-58-335 (8) 76 H1003 2.2(e) 2.2 10/01/2025
58-58-345 25 H40 29(3) 29.3 06/26/2025
58-60-35 (a) 76 H1003 2.2(f) 2.2 10/01/2025
58-60-135 25 H40 29(3) 29.3 06/26/2025
58-60-135 25 H40 29(5) 29.5 06/26/2025
58-63-15 97 S449 6.11 6.11 10/22/2025
58-63-15 (8) 45 H737 6(b) 6 01/01/2027
58-63-15 (8)b.4. 45 H737 6(a) 6 07/01/2025
58-63-16 45 H737 6(a) 6 07/01/2025
58-63-16 97 S449 6.11 6.11 10/22/2025
58-63-65 25 H40 29(6) 29.6 06/26/2025
58-64-1 Art. 64 58 H357 1 1 12/01/2025
58-64-5 58 H357 1 1 12/01/2025
58-64-7 58 H357 1 1 12/01/2025
58-64-10 58 H357 1 1 12/01/2025
58-64-15 58 H357 1 1 12/01/2025
58-64-20 58 H357 1 1 12/01/2025
58-64-25 58 H357 1 1 12/01/2025
58-64-30 58 H357 1 1 12/01/2025
58-64-33 58 H357 1 1 12/01/2025
58-64-35 58 H357 1 1 12/01/2025
58-64-40 58 H357 1 1 12/01/2025
58-64-45 58 H357 1 1 12/01/2025
58-64-46 58 H357 1 1 12/01/2025
58-64-50 58 H357 1 1 12/01/2025
58-64-55 58 H357 1 1 12/01/2025
58-64-60 58 H357 1 1 12/01/2025
58-64-65 58 H357 1 1 12/01/2025
58-64-70 58 H357 1 1 12/01/2025
58-64-75 58 H357 1 1 12/01/2025
58-64-80 58 H357 1 1 12/01/2025
58-64-85 58 H357 1 1 12/01/2025
58-64A-1 Art. 64A, Part 1 58 H357 2 2 12/01/2025
58-64A-2 58 H357 2 2 12/01/2025
58-64A-5 58 H357 2 2 12/01/2025
58-64A-10 58 H357 2 2 12/01/2025
58-64A-15 58 H357 2 2 12/01/2025
58-64A-20 58 H357 2 2 12/01/2025
58-64A-25 58 H357 2 2 12/01/2025
58-64A-30 58 H357 2 2 12/01/2025
58-64A-35 58 H357 2 2 12/01/2025
58-64A-40 58 H357 2 2 12/01/2025
58-64A-45 58 H357 2 2 12/01/2025
58-64A-50 Art. 64A, Part 2 58 H357 2 2 12/01/2025
58-64A-55 58 H357 2 2 12/01/2025
58-64A-60 58 H357 2 2 12/01/2025
58-64A-65 58 H357 2 2 12/01/2025
58-64A-70 58 H357 2 2 12/01/2025
58-64A-75 58 H357 2 2 12/01/2025
58-64A-80 58 H357 2 2 12/01/2025
58-64A-85 Art. 64A, Part 3 58 H357 2 2 12/01/2025
58-64A-90 58 H357 2 2 12/01/2025
58-64A-95 58 H357 2 2 12/01/2025
58-64A-100 Art. 64A, Part 4 58 H357 2 2 12/01/2025
58-64A-105 58 H357 2 2 12/01/2025
58-64A-110 58 H357 2 2 12/01/2025
58-64A-115 58 H357 2 2 12/01/2025
58-64A-120 58 H357 2 2 12/01/2025
58-64A-125 58 H357 2 2 12/01/2025
58-64A-130 58 H357 2 2 12/01/2025
58-64A-135 58 H357 2 2 12/01/2025
58-64A-140 58 H357 2 2 12/01/2025
58-64A-145 Art. 64A, Part 5 58 H357 2 2 12/01/2025
58-64A-150 58 H357 2 2 12/01/2025
58-64A-155 58 H357 2 2 12/01/2025
58-64A-155 25 H40 29(1) 29.1 06/26/2025
58-64A-160 58 H357 2 2 12/01/2025
58-64A-165 58 H357 2 2 12/01/2025
58-64A-170 Art. 64A, Part 6 58 H357 2 2 12/01/2025
58-64A-175 58 H357 2 2 12/01/2025
58-64A-180 Art. 64A, Part 7 58 H357 2 2 12/01/2025
58-64A-185 58 H357 2 2 12/01/2025
58-64A-190 58 H357 2 2 12/01/2025
58-64A-195 Art. 64A, Part 8 58 H357 2 2 12/01/2025
58-64A-200 58 H357 2 2 12/01/2025
58-64A-205 58 H357 2 2 12/01/2025
58-64A-210 58 H357 2 2 12/01/2025
58-64A-215 58 H357 2 2 12/01/2025
58-64A-220 Art. 64A, Part 9 58 H357 2 2 12/01/2025
58-64A-225 58 H357 2 2 12/01/2025
58-64A-230 Art. 64A, Part 10 58 H357 2 2 12/01/2025
58-64A-235 58 H357 2 2 12/01/2025
58-64A-240 58 H357 2 2 12/01/2025
58-64A-245 Art. 64A, Part 11 58 H357 2 2 12/01/2025
58-64A-250 58 H357 2 2 12/01/2025
58-64A-255 58 H357 2 2 12/01/2025
58-64A-260 58 H357 2 2 12/01/2025
58-64A-265 58 H357 2 2 12/01/2025
58-64A-270 58 H357 2 2 12/01/2025
58-64A-275 Art. 64A, Part 12 58 H357 2 2 12/01/2025
58-64A-280 58 H357 2 2 12/01/2025
58-64A-285 58 H357 2 2 12/01/2025
58-64A-290 58 H357 2 2 12/01/2025
58-64A-295 58 H357 2 2 12/01/2025
58-64A-300 58 H357 2 2 12/01/2025
58-64A-305 58 H357 2 2 12/01/2025
58-64A-310 58 H357 2 2 12/01/2025
58-64A-315 58 H357 2 2 12/01/2025
58-64A-320 58 H357 2 2 12/01/2025
58-64A-325 58 H357 2 2 12/01/2025
58-64A-330 58 H357 2 2 12/01/2025
58-64A-335 Art. 64A, Part 13 58 H357 2 2 12/01/2025
58-64A-340 58 H357 2 2 12/01/2025
58-64A-345 58 H357 2 2 12/01/2025
58-64A-350 Art. 64A, Part 14 58 H357 2 2 12/01/2025
58-64A-355 58 H357 2 2 12/01/2025
58-64A-360 58 H357 2 2 12/01/2025
58-64A-365 Art. 64A, Part 15 58 H357 2 2 12/01/2025
58-64A-370 58 H357 2 2 12/01/2025
58-64A-375 58 H357 2 2 12/01/2025
58-64A-380 58 H357 2 2 12/01/2025
58-82A-1 25 H40 29(6) 29.6 06/26/2025
58-82B-10 (2) 4 H74 2.3(a) 2.3 05/14/2025
58-89A-5 (3), (17) - (19) 45 H737 4(a) 4 07/01/2025
58-89A-15 25 H40 29(6) 29.6 06/26/2025
58-89A-35 (b) 45 H737 4(b) 4 07/01/2025
58-89A-50 45 H737 4(c) 4 07/01/2025
58-89A-60 45 H737 4(e) 4 07/01/2025
58-89A-60 (g) 45 H737 4(d) 4 07/01/2025
58-89A-70 45 H737 4(f) 4 07/01/2025
58-89A-75 45 H737 4(g) 4 07/01/2025
58-91-20 25 H40 29(6) 29.6 06/26/2025
58-91-35 25 H40 29(6) 29.6 06/26/2025
62-3 25 H40 29(3) 29.3 06/26/2025
62-23 25 H40 29(6) 29.6 06/26/2025
62-30.1 89 H125 4.5 4.5 07/01/2025
62-54 25 H40 29(1) 29.1 06/26/2025
62-73.1 25 H40 29(1) 29.1 06/26/2025
62-110 25 H40 29(3) 29.3 06/26/2025
62-110.1 (e), (f) 78 S266 2(a) 2 07/29/2025
62-110.9 78 S266 1 1 07/29/2025
62-133 (b)(1)c., (c) 78 S266 2(b) 2 07/29/2025
62-133.2 78 S266 3 3 07/29/2025
62-133.8 25 H40 29(5) 29.5 06/26/2025
62-133.16 (c), (d), (j) 78 S266 4 4 07/29/2025
62-172 78 S266 5 5 07/29/2025
62-280.1 25 H40 29(3) 29.3 06/26/2025
63-111 25 H40 29(5) 29.5 06/26/2025
63A-23 25 H40 29(5) 29.5 06/26/2025
64-33.1 25 H40 29(5) 29.5 06/26/2025
64-34 25 H40 29(5) 29.5 06/26/2025
65-48 (2a) 68 H210 1 1 07/07/2025
65-53 (7a) 68 H210 2 2 07/07/2025
65-62 68 H210 3 3 07/07/2025
66-58 25 H40 29(5) 29.5 06/26/2026
66-58.10 25 H40 29(6) 29.6 06/26/2025
66-58.12 25 H40 29(3) 29.3 06/26/2025
66-58.20 25 H40 29(3) 29.3 06/26/2025
66-207 25 H40 29(3) 29.3 06/26/2025
66-354 25 H40 29(5) 29.5 06/26/2025
66-355 25 H40 29(5) 29.5 06/26/2025
66-362 25 H40 29(1) 29.1 06/26/2025
66-385 Art. 45, Part 1, title 25 H40 34(a) 34 06/26/2025
66-386 25 H40 34(a) 34 06/26/2025
66-391 25 H40 29(3) 29.3 06/26/2025
66-392 25 H40 29(1) 29.1 06/26/2025
66-392 25 H40 29(3) 29.3 06/26/2025
66-458 25 H40 29(6) 29.6 06/26/2025
66-500 25 H40 29(5) 29.5 06/26/2025
66-505 Art. 51A 84 H805 2(a) 2 12/01/2025
66-506 84 H805 2(a) 2 12/01/2025
66-507 84 H805 2(a) 2 12/01/2025
66-508 84 H805 2(a) 2 12/01/2025
66-509 84 H805 2(a) 2 12/01/2025
66-510 84 H805 2(a) 2 12/01/2025
68-20 25 H40 29(5) 29.5 06/26/2025
70-14 25 H40 29(6) 29.6 06/26/2025
70-38 25 H40 29(6) 29.6 06/26/2025
70-52 25 H40 29(6) 29.6 06/26/2025
74C-2 (c) 51 S710 2(a) 2 10/01/2025
74C-3 (a)(6), (7) 51 S710 2(b) 2 10/01/2025
74C-3 (a)(6)e. 70 S429 22 22 07/09/2025
74C-9 (e)(17), (h), (i) 51 S710 2(c) 2 10/01/2025
74C-11 51 S710 2(d) 2 10/01/2025
74C-12 (a)(1), (9), (27) 51 S710 2(e) 2 10/01/2025
74C-13 51 S710 2(f) 2 10/01/2025
74C-13 (a1) 51 S710 9 9 07/02/2025
74D-1 Chapter, title 1 51 S710 1(a) 1 10/01/2025
74D-1 Art. 1, title 2 51 S710 1(a) 1 10/01/2025
74D-1 3 51 S710 1(a) 1 10/01/2025
74D-2 51 S710 1(a) 1 10/01/2025
74D-2.1 51 S710 1(a) 1 10/01/2025
74D-3 51 S710 1(a) 1 10/01/2025
74D-4 51 S710 1(a) 1 10/01/2025
74D-5 51 S710 1(a) 1 10/01/2025
74D-5.1 51 S710 1(a) 1 10/01/2025
74D-5.2 51 S710 1(a) 1 10/01/2025
74D-6 51 S710 1(a) 1 10/01/2025
74D-7 (c), (d) 51 S710 1(a) 1 10/01/2025
74D-8 51 S710 1(a) 1 10/01/2025
74D-8.1 (a) 51 S710 1(a) 1 10/01/2025
74D-9 (d) 51 S710 1(a) 1 10/01/2025
74D-10 (a) 51 S710 1(a) 1 10/01/2025
74D-11 (b), (c), (e), (f) 51 S710 1(a) 1 10/01/2025
74D-13 51 S710 1(a) 1 10/01/2025
74D-14 51 S710 1(a) 1 10/01/2025
74D-30 Art. 2 51 S710 1(b) 1 10/01/2025
74E-6 (c) S50 14 14 12/01/2025 Vetoed
74G-6 (d) S50 15 15 12/01/2025 Vetoed
75-40 25 H40 29(1) 29.1 06/26/2025
75-41 25 H40 29(1) 29.1 06/26/2025
75-42 25 H40 29(3) 29.3 06/26/2025
75-62 25 H40 29(3) 29.3 06/26/2025
75-62 25 H40 29(5) 29.5 06/26/2025
75-63 25 H40 29(1) 29.1 06/26/2025
75-63 25 H40 29(3) 29.3 06/26/2025
75-63 25 H40 29(5) 29.5 06/26/2025
75-63.1 25 H40 29(1) 29.1 06/26/2025
75-63.1 25 H40 29(5) 29.5 06/26/2025
75-65 25 H40 29(1) 29.1 06/26/2025
75-65 25 H40 29(3) 29.3 06/26/2025
75-65 25 H40 29(5) 29.5 06/26/2025
75-66 25 H40 29(3) 29.3 06/26/2025
75-102 25 H40 29(1) 29.1 06/26/2025
75-142 25 H40 29(1) 29.1 06/26/2025
75D-3 25 H40 35(a) 35 06/26/2025
75D-3 25 H40 35(b) 35 06/26/2025
75D-5 25 H40 35(c) 35 06/26/2025
75D-8 25 H40 35(d) 35 06/26/2025
77-50 Art. 5 25 H40 35.1 35.1 06/26/2025
77-51 25 H40 35.1 35.1 06/26/2025
77-52 25 H40 35.1 35.1 06/26/2025
77-53 25 H40 35.1 35.1 06/26/2025
77-54 25 H40 35.1 35.1 06/26/2025
77-55 25 H40 35.1 35.1 06/26/2025
77-56 25 H40 35.1 35.1 06/26/2025
77-57 25 H40 35.1 35.1 06/26/2025
77-58 25 H40 35.1 35.1 06/26/2025
77-80 Art. 6B, title 67 H23 5.1(a) 5.1 07/07/2025
77-89.1 67 H23 5.1(c) 5.1 07/07/2025
77-89.1 Art. 7B 67 H23 5.1(b) 5.1 07/07/2025
77-89.2 67 H23 5.1(b) 5.1 07/07/2025
77-89.2 67 H23 5.1(c) 5.1 07/07/2025
77-89.3 67 H23 5.1(b) 5.1 07/07/2025
77-89.3 67 H23 5.1(c) 5.1 07/07/2025
77-89.4 67 H23 5.1(b) 5.1 07/07/2025
77-89.4 67 H23 5.1(c) 5.1 07/07/2025
77-89.5 67 H23 5.1(b) 5.1 07/07/2025
77-89.5 67 H23 5.1(c) 5.1 07/07/2025
77-89.6 67 H23 5.1(b) 5.1 07/07/2025
77-89.6 67 H23 5.1(c) 5.1 07/07/2025
77-89.7 67 H23 5.1(b) 5.1 07/07/2025
77-89.7 67 H23 5.1(c) 5.1 07/07/2025
77-89.8 67 H23 5.1(b) 5.1 07/07/2025
77-89.8 67 H23 5.1(c) 5.1 07/07/2025
77-89.9 67 H23 5.1(d) 5.1 07/07/2025
77-89.10 67 H23 5.1(b) 5.1 07/07/2025
77-89.10 67 H23 5.1(c) 5.1 07/07/2025
77-113 (a)(10), (c), (f) 67 H23 5.3 5.3 07/07/2025
77-132 25 H40 29(6) 29.6 06/26/2025
78-14 25 H40 29(3) 29.3 06/26/2025
78A-14 25 H40 29(5) 29.5 06/26/2025
78A-17.1 25 H40 29(5) 29.5 06/26/2025
78A-36 (b) 45 H737 12(a) 12 10/01/2025
78A-36 (b) 52 S690 2(a) 2 10/01/2025
78C-86 46 H378 7(a) 7 07/01/2025
78C-88 46 H378 7(a) 7 07/01/2025
78C-94 46 H378 7(a) 7 07/01/2025
78C-95 46 H378 7(a) 7 07/01/2025
78C-98 46 H378 7(a) 7 07/01/2025
83A-5 25 H40 29(5) 29.5 06/26/2025
84-2.1 25 H40 29(5) 29.5 06/26/2025
84-4.1 19 H476 3.1 3.1 06/26/2025
84-28 54 H620 20 20 07/02/2025
85B-1 25 H40 36(a) 36 06/26/2025
85B-1 25 H40 36(b) 36 06/26/2025
87-10.2 25 H40 29(3) 29.3 06/26/2025
87-22 25 H40 29(1) 29.1 06/26/2025
87-97 25 H40 29(6) 29.6 06/26/2025
87-117 (15), (20a), (22) 21 H247 1 1 10/01/2025
87-121 21 H247 2 2 10/01/2025
87-122 21 H247 3 3 10/01/2025
87-124 21 H247 4 4 10/01/2025
87-126 (c) 21 H247 5 5 10/01/2025
87-128 21 H247 6 6 10/01/2025
87-129 21 H247 7 7 10/01/2025
88B-25 (4) 20 H91 2.7 2.7 06/26/2025
89C-19.2 94 H926 2(a) 2 10/06/2025
89E-3 25 H40 9(a) 9 06/26/2025
89E-4 (c) 25 H40 9(b) 9 06/26/2025
89E-6 (1), (4) 25 H40 9(c) 9 06/26/2025
89E-7 (b)(2), (3) 25 H40 9(d) 9 06/26/2025
89E-8 25 H40 9(e) 9 06/26/2025
89E-9 25 H40 9(f) 9 06/26/2025
89E-11 25 H40 9(g) 9 06/26/2025
89E-13 25 H40 9(h) 9 06/26/2025
89E-14 (b)(4) 25 H40 9(i) 9 06/26/2025
89E-18 25 H40 9(j) 9 06/26/2025
89E-19 (b) 25 H40 9(k) 9 06/26/2025
89E-22 25 H40 9(l) 9 06/26/2025
89E-24 25 H40 9(m) 9 06/26/2025
90-1.1 25 H40 29(3) 29.3 06/26/2025
90-1.1 (4), (4a) 37 H67 4(e) 4 04/01/2026
90-1.1 (4d) 37 H67 6.1(a) 6.1 See Bill
90-3 25 H40 29(5) 29.5 06/26/2025
90-5.1 1 37 H67 1(b) 1 01/01/2026
90-5.1 (11), (12) 2 37 H67 4(f) 4 04/01/2026
90-5.2 25 H40 29(1) 29.1 06/26/2025
90-5.3 25 H40 29(5) 29.5 06/26/2025
90-9.3 37 H67 6.1(b) 6.1 See Bill
90-9.3 (a1) 37 H67 4(b) 4 04/01/2026
90-9.3A 37 H67 6.1(c) 6.1 See Bill
90-11 (b) 37 H67 4(g) 4 04/01/2026
90-11 (b) 37 H67 1(c) 1 01/01/2026
90-12.03 37 H67 2(a) 2 01/01/2026
90-12.4 (d) 37 H67 6.1(d) 6.1 See Bill
90-12.4B catch line 37 H67 6.1(e) 6.1 See Bill
90-13.1 37 H67 1(d) 1 01/01/2026
90-13.1 (g) 37 H67 4(d) 4 04/01/2026
90-13.2 37 H67 1(e) 1 01/01/2026
90-13.2 (a), (b1) 37 H67 4(c) 4 04/01/2026
90-14 (18) 37 H67 4(h) 4 04/01/2026
90-14 (18) 37 H67 1(f) 1 01/01/2026
90-14.2 (a) 37 H67 1(g) 1 01/01/2026
90-18 (c)(3a) 37 H67 7.1(a) 7.1 10/01/2025
90-18.1 37 H67 6.1(f) 6.1 See Bill
90-18.4 37 H67 7.1(b) 7.1 10/01/2025
90-21.15A 60 S600 4.1 4.1 07/03/2025
90-21.81 (9) 37 H67 6.1(g) 6.1 See Bill
90-21.84 25 H40 29(5) 29.5 06/26/2025
90-21.93 25 H40 29(5) 29.5 06/26/2025
90-21.104 25 H40 29(5) 29.5 06/26/2025
90-21.132 25 H40 29(6) 29.6 06/26/2025
90-21.160 Art. 1O 84 H805 3.1(a) 3.1 07/29/2025
90-21.170 Art. IP 37 H67 1(a) 1 01/01/2026
90-21.171 37 H67 1(a) 1 01/01/2026
90-21.172 37 H67 1(a) 1 01/01/2026
90-21.173 37 H67 1(a) 1 01/01/2026
90-21.174 37 H67 1(a) 1 01/01/2026
90-21.175 37 H67 1(a) 1 01/01/2026
90-21.176 37 H67 1(a) 1 01/01/2026
90-21.177 37 H67 1(a) 1 01/01/2026
90-21.178 37 H67 1(a) 1 01/01/2026
90-21.179 37 H67 1(a) 1 01/01/2026
90-21.180 37 H67 1(a) 1 01/01/2026
90-21.181 37 H67 1(a) 1 01/01/2026
90-21.182 37 H67 1(a) 1 01/01/2026
90-21.183 37 H67 1(a) 1 01/01/2026
90-21.184 37 H67 1(a) 1 01/01/2026
90-21.185 37 H67 1(a) 1 01/01/2026
90-21.186 37 H67 1(a) 1 01/01/2026
90-21.187 37 H67 1(a) 1 01/01/2026
90-21.188 37 H67 1(a) 1 01/01/2026
90-21.189 37 H67 1(a) 1 01/01/2026
90-21.190 37 H67 1(a) 1 01/01/2026
90-21.191 37 H67 1(a) 1 01/01/2026
90-21.192 37 H67 1(a) 1 01/01/2026
90-21.193 37 H67 1(a) 1 01/01/2026
90-21.194 37 H67 1(a) 1 01/01/2026
90-85.3 (b2) 37 H67 7.1(c) 7.1 10/01/2025
90-85.3 (b2), (b3) 37 H67 5.1(a) 5.1 10/01/2025
90-85.3A (b), (e) 37 H67 5.1(b) 5.1 10/01/2025
90-85.15A 25 H40 29(6) 29.6 06/26/2025
90-85.28 25 H40 29(5) 29.5 06/26/2025
90-85.42 69 S479 9 9 07/09/2025
90-85.50 (b) 69 S479 5.1(a)(2) 5.1 07/09/2025
90-85.51 69 S479 5.1(a)(4) 5.1 07/09/2025
90-85.52 69 S479 5.1(a)(3) 5.1 07/09/2025
90-85.53 69 S479 5.1(a)(5) 5.1 07/09/2025
90-85.60 Art. 4D 69 S479 8(a) 8.1 01/01/2026
90-85.61 69 S479 8(a) 8.1 01/01/2026
90-85.62 69 S479 8(a) 8.1 01/01/2026
90-85.63 69 S479 8(a) 8.1 01/01/2026
90-88 25 H40 29(6) 29.6 06/26/2025
90-95 70 S429 14(a) 14 12/01/2025
90-95 25 H40 29(5) 29.5 06/26/2025
90-96.2 (c3)(3a) 71 S311 2(d) 2 12/01/2025
90-96.2 (c3)(3a) 91 S245 3.5(a) 3.5 12/01/2025
90-113.52A 25 H40 29(3) 29.3 06/26/2025
90-113.151 25 H40 29(5) 29.5 06/26/2025
90-113.158 Art. 5I 71 S311 2(c) 2 12/01/2025
90-116 25 H40 29(6) 29.6 06/26/2025
90-121.6 25 H40 29(5) 29.5 06/26/2025
90-171.95F 25 H40 29(5) 29.5 06/26/2025
90-171.95F 25 H40 29(6) 29.6 06/26/2025
90-171.95G 25 H40 29(5) 29.5 06/26/2025
90-171.95G 25 H40 29(6) 29.6 06/26/2025
90-187.10 (13) 42 H975 2(a) 2 See Bill
90-210.18A 76 H1003 3.1 3.1 07/09/2025
90-210.20 71 S311 2(a) 2 12/01/2025
90-210.20 76 H1003 3.2(b) 3.2 07/09/2025
90-210.20 (a), (b), (c), (c1) 1 76 H1003 3.2(a) 3.2 07/09/2025
90-210.20 (c2), (d), (e), (e2) 2 76 H1003 3.2(a) 3.2 07/09/2025
90-210.20 (f), (g), (h), (i) 3 76 H1003 3.2(a) 3.2 07/09/2025
90-210.20 (j), (k), (l) 4 76 H1003 3.2(a) 3.2 07/09/2025
90-210.20 (1), (3), (5), (6) 5 76 H1003 3.2(a) 3.1 07/09/2025
90-210.20 (7), (8), (9), (11) 6 76 H1003 3.2(a) 3.2 07/09/2025
90-210.20 (12), (13), (14), (16) 7 76 H1003 3.2(a) 3.2 07/09/2025
90-210.20 (17), (18), (20) 8 76 H1003 3.2(a) 3.2 07/09/2025
90-210.23 (d), (d1), (e) 76 H1003 3.3 3.3 07/09/2025
90-210.24 76 H1003 3.4 3.4 07/09/2025
90-210.25 76 H1003 3.5 3.5 07/09/2025
90-210.25 25 H40 29(1) 29.1 06/26/2025
90-210.25 25 H40 29(6) 29.6 06/26/2025
90-210.25 (a2)(2) 76 H1003 5.1A(a) 5.1 07/01/2030
90-210.25B 76 H1003 3.6 3.6 07/09/2025
90-210.26 76 H1003 3.7 3.7 07/09/2025
90-210.27A 76 H1003 3.8 3.8 07/09/2025
90-210.27A (a1) 2 H47 5.6(a) 5.6 03/19/2025
90-210.28 76 H1003 3.9 3.9 07/09/2025
90-210.29A 76 H1003 3.10 3.10 07/09/2025
90-210.29B 76 H1003 3.11 3.11 07/09/2025
90-210.29C 71 S311 2(b) 2 12/01/2025
90-210.60 76 H1003 4.1 4.1 07/09/2025
90-210.60 (5), (10) 76 H1003 2.1(a) 2.1 10/01/2025
90-210.61 (d) 76 H1003 4.2 4.2 07/09/2025
90-210.62 (b) 76 H1003 4.3 4.3 07/09/2025
90-210.63 76 H1003 4.4 4.4 07/09/2025
90-210.64 76 H1003 4.5 4.5 07/09/2025
90-210.67 (b), (c) 76 H1003 4.6 4.6 07/09/2025
90-210.67 (b), (c) 76 H1003 4.6 4.6 07/09/2025
90-210.68 76 H1003 4.7 4.7 07/09/2025
90-210.69 76 H1003 4.8 4.8 07/09/2025
90-210.70 (e) 76 H1003 4.9 4.9 07/09/2025
90-210.72 76 H1003 2.1(b) 2.1 10/01/2025
90-210.73 76 H1003 4.10 4.10 07/09/2025
90-210.120 Art. 13F, title 76 H1003 1.1(b) 1.1 10/01/2025
90-210.121 1 76 H1003 1.1(c) 1.1 10/01/2025
90-210.121 (1) 2 76 H1003 1.1(a) 1.1 10/01/2025
90-210.121 (1a) 3 76 H1003 1.1(a) 1.1 10/01/2025
90-210.121 (17a) 4 76 H1003 1.1(a) 1.1 10/01/2025
90-210.121 (17a), (17b), (17c), (17d) 5 76 H1003 1.1(a) 1.1 10/01/2025
90-210.122 76 H1003 1.2 1.2 10/01/2025
90-210.123 76 H1003 1.4 1.4 10/01/2025
90-210.124 76 H1003 1.5 1.5 10/01/2025
90-210.124A 76 H1003 1.6 1.6 10/01/2025
90-210.125 (a)(6), (7), (13) 76 H1003 1.7 1.7 10/01/2025
90-210.126 (a) 76 H1003 1.8 1.8 10/01/2025
90-210.127 (b), (c), (d) 76 H1003 1.9 1.9 10/01/2025
90-210.128 (b) 76 H1003 1.10 1.10 10/01/2025
90-210.129 76 H1003 1.11 1.11 10/01/2025
90-210.130 76 H1003 1.12 1.12 10/01/2025
90-210.131 (d), (e) 76 H1003 1.13 1.13 10/01/2025
90-210.132 76 H1003 1.14 1.14 10/01/2025
90-210.136 76 H1003 1.15 1.15 10/01/2025
90-210.136 (a)(1), (2), (3), (4) 76 H1003 1.1(a) 1.1 10/01/2025
90-270.56 37 H67 10(a) 10 10/01/2025
90-270.63 37 H67 10(b) 10 10/01/2025
90-270.126 25 H40 29(6) 29.6 06/26/2025
90-270.128 25 H40 29(5) 29.5 06/26/2025
90-270.128 25 H40 29(6) 29.6 06/26/2025
90-270.130 25 H40 29(6) 29.6 06/26/2025
90-270.139 (e), (e1) 37 H67 3(a) 3 10/01/2025
90-270.140 37 H67 3(d) 3.4 10/01/2025
90-270.145 (b)(3) 37 H67 3(b) 3 10/01/2025
90-270.153 (a), (h), (i) 37 H67 3(c) 2 10/01/2025
90-270.169 25 H40 29(6) 29.6 06/26/2025
90-270.170 25 H40 29(5) 29.5 06/26/2025
90-270.170 25 H40 29(6) 29.6 06/26/2025
90-270.172 25 H40 29(6) 29.6 06/26/2025
90-270.200 Art 18J 37 H67 4(a) 4 04/01/2026
90-270.201 37 H67 4(a) 4 04/01/2026
90-270.202 37 H67 4(a) 4 04/01/2026
90-270.203 37 H67 4(a) 4 04/01/2026
90-270.204 37 H67 4(a) 4 04/01/2026
90-270.205 37 H67 4(a) 4 04/01/2026
90-270.206 37 H67 4(a) 4 04/01/2026
90-270.207 37 H67 4(a) 4 04/01/2026
90-270.208 37 H67 4(a) 4 04/01/2026
90-270.209 37 H67 4(a) 4 04/01/2026
90-270.210 37 H67 4(a) 4 04/01/2026
90-270.211 37 H67 4(a) 4 04/01/2026
90-270.212 37 H67 4(a) 4 04/01/2026
90-308 94 H926 9.1(a) 9.1 10/01/2025
90-312.8 25 H40 29(6) 29.6 06/26/2025
90-312.10 25 H40 29(5) 29.5 06/26/2025
90-312.10 25 H40 29(6) 29.6 06/26/2025
90-312.12 25 H40 29(6) 29.6 06/26/2025
90-352 25 H40 29(1) 29.1 06/26/2025
90-352 25 H40 29(3) 29.3 06/26/2025
90-354 (a)(1) 92 H358 2.11(c) 2.11 09/30/2025
90-356 25 H40 29(6) 29.6 06/26/2025
90-357.5 (a)(1), (c)(1) 92 H358 2.11(d) 2.11 09/30/2025
90-359 92 H358 2.11(e) 2.11 09/30/2025
90-414.4 25 H40 39.1(c) 39.1 06/26/2025
90-631 (b) 56 S125 2(c) 2 07/03/2025
90-631 (b) 92 H358 2.11(f) 2.11 09/30/2025
90-632.11 25 H40 29(1) 29.1 06/26/2025
90A-30 25 H40 24(c) 24 06/26/2025
90A-53 25 H40 10 10 06/26/2025
90B-1 Chapter, title 1 7 H231 1(b) 1.1 10/01/2025
90B-1 Art. 1 2 7 H231 1(a) 1 10/01/2025
90B-1 3 7 H231 1(c) 1.2 10/01/2025
90B-2 7 H231 1(a) 1 10/01/2025
90B-3 7 H231 1(a) 1 10/01/2025
90B-4 7 H231 1(a) 1 10/01/2025
90B-5 7 H231 1(a) 1 10/01/2025
90B-6 7 H231 1(a) 1 10/01/2025
90B-6.1 7 H231 1(a) 1 10/01/2025
90B-6.2 7 H231 1(a) 1 10/01/2025
90B-7 7 H231 1(a) 1 10/01/2025
90B-8 7 H231 1(a) 1 10/01/2025
90B-9 7 H231 1(a) 1 10/01/2025
90B-9.1 7 H231 1(a) 1 10/01/2025
90B-10 7 H231 1(a) 1 10/01/2025
90B-11 7 H231 1(a) 1 10/01/2025
90B-12 7 H231 1(a) 1 10/01/2025
90B-13 7 H231 1(a) 1 10/01/2025
90B-14 7 H231 1(a) 1 10/01/2025
90B-15 7 H231 1(a) 1 10/01/2025
90B-16 7 H231 1(a) 1 10/01/2025
90B-20 Art. 2 7 H231 2 2 10/01/2025
90B-21 7 H231 2 2 10/01/2025
90B-22 7 H231 2 2 10/01/2025
90B-23 7 H231 2 2 10/01/2025
90B-24 7 H231 2 2 10/01/2025
90B-25 7 H231 2 2 10/01/2025
90B-26 7 H231 2 2 10/01/2025
90B-27 7 H231 2 2 10/01/2025
90B-28 7 H231 2 2 10/01/2025
90B-29 7 H231 2 2 10/01/2025
90B-30 7 H231 2 2 10/01/2025
90B-31 7 H231 2 2 10/01/2025
90B-32 7 H231 2 2 10/01/2025
90B-33 7 H231 2 2 10/01/2025
90B-34 7 H231 2 2 10/01/2025
90B-35 7 H231 2 2 10/01/2025
93-12 (5) 35 S321 1(a) 1 01/01/2026
93A-4 (a2) 56 S125 2(d) 2 07/03/2025
93A-4 (a2) 92 H358 2.11(g) 2.11 09/30/2025
93A-38.5 (e) 56 S125 2(e) 2 07/03/2025
93A-38.5 (e) 92 H358 2.11(h) 2.11 09/30/2025
93A-51 25 H40 29(6) 29.6 06/26/2025
93A-61 25 H40 29(1) 29.1 06/26/2025
93A-62 (d), (e) 75 H992 1 1 12/01/2025
93A-62.1 75 H992 2 2 12/01/2025
93A-67 25 H40 29(5) 29.5 06/26/2025
93B-2 (f) 61 H763 1(b) 1 10/01/2025
93B-8.1 (d) 51 S710 3(c) 3 10/01/2025
93B-14 94 H926 27 27 10/06/2025
93B-15.1 25 H40 29(5) 29.5 06/26/2025
93B-15.3 61 H763 1(a) 1.5 10/01/2025
93D-7.1 94 H926 9(a) 9 10/01/2025
93D-14 (b), (c) 94 H926 8(a) 8 10/06/2025
93E-1-4 (5a), (5b), (9a) 52 S690 1(a) 1 01/01/2026
93E-1-6 (a1) 52 S690 1(b) 1 01/01/2026
93E-1-6 (a1) 52 S690 1(c) 1 12/31/2030
93E-1-7 (b2) 56 S125 2(f) 2 07/03/2025
93E-1-7 (b2) 92 H358 2.11(i) 2.11 09/30/2025
93E-1-8 (b), (d) 56 S125 2(g) 2 07/03/2025
93E-1-8 (b), (d) 92 H358 2.11(j) 2.11 09/30/2025
93E-1-10 25 H40 29(6) 29.6 06/26/2025
93E-2-3 25 H40 29(6) 29.6 06/26/2025
95-4 (7) 92 H358 4.1(g) 4.1 09/30/2025
95-9 28 H568 2.1 2.1 06/27/2025
95-13 92 H358 4.1(a) 4.1 09/30/2025
95-25.5 (n) 56 S125 2(h) 2 07/03/2025
95-25.15 25 H40 29(1) 29.1 06/26/2025
95-25.18 92 H358 4.1(b) 4.1 09/30/2025
95-25.23A 25 H40 29(1) 29.1 06/26/2025
95-36.3 (c) 28 H568 1.5 1.5 06/27/2025
95-47.9 (e) 92 H358 4.1(c) 4.1 09/30/2025
95-69.17 25 H40 29(1) 29.1 06/26/2025
95-107 63 H559 1(a) 1 07/07/2025
95-108 63 H559 1(b) 1 07/07/2025
95-110.2 28 H568 1.6(a) 1.6 06/27/2025
95-110.3 28 H568 1.6(b) 1.6 06/27/2025
95-110.4 28 H568 1.6(c) 1.6 06/27/2025
95-110.5 28 H568 1.6(d) 1.6 06/27/2025
95-110.5 (20) 63 H559 1(c) 1 07/07/2025
95-110.5A 63 H559 1(d) 1 07/07/2025
95-110.6 25 H40 29(1) 29.1 06/26/2025
95-110.9 (b) 28 H568 1.6(e) 1.6 06/27/2025
95-110.10 25 H40 29(1) 29.1 06/26/2025
95-110.12 92 H358 4.1(d) 4.1 09/30/2025
95-111.3 (6) 28 H568 1.7(a) 1.7 06/27/2025
95-111.4 28 H568 1.7(b) 1.7 06/27/2025
95-111.4 (19) 63 H559 1(e) 1 07/07/2025
95-111.4A 63 H559 1(f) 1 07/07/2025
95-111.6 25 H40 29(1) 29.1 06/26/2025
95-111.10 (b) 28 H568 1.7(c) 1.7 06/27/2025
95-111.13 25 H40 29(1) 29.1 06/26/2025
95-111.15 92 H358 4.1(e) 4.1 09/30/2025
95-120 (9) 63 H559 1(g) 1 07/07/2025
95-120.2 63 H559 1(h) 1 07/07/2025
95-123 25 H40 29(1) 29.1 06/26/2025
95-125.2 (b) 28 H568 1.8 1.8 06/27/2025
95-125.3 25 H40 29(1) 29.1 06/26/2025
95-135 (d) 28 H568 1.3(a) 1.3 06/27/2025
95-136.2 28 H568 1 1 06/27/2025
95-137 25 H40 29(1) 29.1 06/26/2025
95-142 92 H358 4.1(f) 4.1 09/30/2025
95-234 25 H40 29(1) 29.1 06/26/2025
95-260 71 S311 3(a) 3 07/09/2025
95-261 71 S311 3(a) 3 07/09/2025
95-262 71 S311 3(a) 3 07/09/2025
95-264 71 S311 3(a) 3 07/09/2025
95-266 71 S311 3(a) 3 07/09/2025
95-271 71 S311 3(a) 3 07/09/2025
96-4 25 H40 29(6) 29.6 06/26/2025
97-25.6 25 H40 29(1) 29.1 06/26/2025
97-86 25 H40 29(1) 29.1 06/26/2025
99E-90 Art. 10 94 H926 26(a) 26 10/06/2025
101-2 54 H620 4(a) 4 12/01/2025
102-1.1 51 S710 7 7 07/02/2025
104E-24 25 H40 24(d) 24 06/26/2025
105-113.4 25 H40 29(3) 29.3 06/26/2025
105-113.4F 25 H40 29(1) 29.1 06/26/2025
105-130.4A 25 H40 29(3) 29.3 06/26/2025
105-130.9 (4) 4 H74 9.1(b) 9.1 01/01/2025
105-130.34 4 H74 9.1(a) 9.1 01/01/2025
105-130.34A 4 H74 9.1(a) 9.1 01/01/2025
105-153.5 (a)(2)a. 4 H74 9.1(d) 9.1 01/01/2025
105-153.8A 60 S600 2(a) 2 01/01/2027
105-153.11 4 H74 9.1(c) 9.1 01/01/2025
105-164.3 25 H40 29(4) 29 06/26/2025
105-164.3 25 H40 29(3) 29.3 06/26/2025
105-164.8 25 H40 29(3) 29.3 06/26/2025
105-164.8 25 H40 29(5) 29.5 06/26/2025
105-164.13 25 H40 29(3) 29.3 06/26/2025
105-164.13 (74) 58 H357 3 3 12/01/2025
105-164.14 (c)(15) 39 H948 8.2 8.2 07/01/2025
105-164.28 25 H40 29(3) 29.3 06/26/2025
105-187.19 (b) 66 S706 1(a) 1 10/01/2025
105-228.5C 89 H125 2B.12(a) 2 07/01/2025
105-241.01 25 H40 29(5) 29.5 06/26/2025
105-259 (b)(56), (57) 60 S600 2(b) 2 01/01/2027
105-262.1 25 H40 29(3) 29.3 06/26/2025
105-262.1 25 H40 29(6) 29.6 06/26/2025
105-264.2 25 H40 29(5) 29.5 06/26/2025
105-269.8 27 H576 4.6 4.6 06/27/2025
105-269.14 25 H40 29(3) 29.3 06/26/2025
105-277.4 25 H40 29(5) 29.5 06/26/2025
105-277.13 53 S387 1 1 07/01/2025
105-291 25 H40 29(6) 29.6 06/26/2025
105-317.1 25 H40 29(5) 29.5 06/26/2025
105-330.5 25 H40 29(1) 29.1 06/26/2025
105-361 25 H40 29(5) 29.5 06/26/2025
105-506.1 (3), (4) 39 H948 2.1 2.1 07/01/2025
105-507.2 39 H948 2.2 2.2 07/01/2025
105-507.3 1 39 H948 2.4 2.4 See Bill
105-507.3 (b) 2 39 H948 2.3 2.3 07/01/2025
105-537 Local Modification 87 H305 2(b) 2 07/31/2025
105-538 Local Modification 87 H305 2(c) 2 07/31/2025
105A-1 Art. 1 83 H549 11(a) 11 12/01/2025
105A-1 Chapter title 83 H549 11(a) 11 12/01/2025
105A-2 (5) 83 H549 11(a) 11 12/01/2025
105A-2 (6) 94 H926 28 28 10/06/2025
105A-2 (7) 83 H549 11(a) 11 12/01/2025
105A-3 83 H549 11(a) 11 12/01/2025
105A-4 83 H549 11(a) 11 12/01/2025
105A-5 (a), (e) 83 H549 11(a) 11 12/01/2025
105A-6.1 83 H549 11(a) 11 12/01/2025
105A-6.2 83 H549 11(a) 11 12/01/2025
105A-6.3 83 H549 11(a) 11 12/01/2025
105A-6.4 83 H549 11(a) 11 12/01/2025
105A-8 catch line 83 H549 11(a) 11 12/01/2025
105A-8.1 83 H549 11(a) 11 12/01/2025
105A-9 83 H549 11(a) 11 12/01/2025
105A-13 (a), (a1), (c) 83 H549 11(a) 11 12/01/2025
105A-14 83 H549 11(a) 11 12/01/2025
105A-14.1 83 H549 11(a) 11 12/01/2025
106-202.16 25 H40 29(6) 29.6 06/26/2025
106-568.43 25 H40 29(5) 29.5 06/26/2025
106-568.45 25 H40 29(5) 29.5 06/26/2025
106-740 12 H126 1 1 10/01/2025
108A-24 16 H612 2.2(a) 2.2 10/01/2025
108A-27.8 25 H40 29(6) 29.6 06/26/2025
108A-40 25 H40 28(b) 28 01/01/2023
108A-41 25 H40 28(b) 28 01/01/2023
108A-42 25 H40 27(b) 27 01/01/2023
108A-42.1 25 H40 28(c) 28 01/01/2023
108A-42.1 25 H40 28(b) 28 01/01/2023
108A-47.1 25 H40 28(b) 28 01/01/2023
108A-50.3 16 H612 2.1 2.1 10/01/2025
108A-50.4 16 H612 2.1 2.1 10/01/2025
108A-50.5 16 H612 2.1 2.1 10/01/2025
108A-50.6 16 H612 2.1 2.1 10/01/2025
108A-50.7 16 H612 2.1 2.1 10/01/2025
108A-50.8 16 H612 2.1 2.1 10/01/2025
108A-50.9 16 H612 2.1 2.1 10/01/2025
108A-50.10 Art. 2, Part 4A 16 H612 2.3 2.3 06/26/2025
108A-50.11 16 H612 2.3 2.3 06/26/2025
108A-50.12 16 H612 2.3 2.3 06/26/2025
108A-50.13 16 H612 2.4 2.4 06/26/2025
108A-54 25 H40 29(5) 29.5 06/26/2025
108A-54.1A 25 H40 29(5) 29.5 06/26/2025
108A-54.1B 25 H40 29(6) 29.6 06/26/2025
108A-54.2 25 H40 29(5) 29.5 06/26/2025
108A-54.3A 64 H546 5.1(a) 5.1 07/07/2025
108A-55 25 H40 29(5) 29.5 06/26/2025
108A-57 27 H576 2.4(a) 2.4 06/27/2025
108A-68.1A 25 H40 29(5) 29.5 06/26/2025
108A-70.9A (f) 25 H40 24(e) 24 06/26/2025
108A-70.9B (g) 25 H40 24(f) 24 06/26/2025
108A-74 (a5) 16 H612 1.17(b) 1.17 06/26/2025
108A-106.1 27 H576 5.1(a) 5.1 11/01/2025
108A-106.2 27 H576 5.1(a) 5.1 11/01/2025
108A-118 Art. 6B 23 S400 1 1 10/01/2025
108A-118.1 23 S400 1 1 10/01/2025
108A-118.2 23 S400 1 1 10/01/2025
108A-118.3 23 S400 1 1 10/01/2025
108A-118.4 23 S400 1 1 10/01/2025
108A-118.5 23 S400 1 1 10/01/2025
108A-118.6 23 S400 1 1 10/01/2025
108A-118.7 23 S400 1 1 10/01/2025
108A-118.8 23 S400 1 1 10/01/2025
108A-145.3 (6c), (6d), (6e) 64 H546 6.1(c) 6.1 10/01/2025
108A-146.1 64 H546 6.1(d) 6.1 10/01/2025
108A-146.3 64 H546 6.1(e) 6.1 10/01/2025
108A-146.4 64 H546 6.1(f) 6.1 10/01/2025
108A-146.5 64 H546 5.1(b) 5.1 07/07/2025
108A-146.5 64 H546 6.1(g) 6.1 10/01/2025
108A-146.10 64 H546 6.1(h) 6.1 10/01/2025
108A-146.10A 64 H546 6.1(i) 6.1 07/07/2025
108A-146.13 (c) 64 H546 6.1(j) 6.1 10/01/2025
108A-147.1 64 H546 6.1(k) 6.1 10/01/2025
108A-147.2 64 H546 6.1(l) 6.1 10/01/2025
108A-147.2A 64 H546 6.1(m) 6.1 10/01/2025
108A-147.3 64 H546 6.1(n) 6.1 10/01/2025
108A-147.5 64 H546 6.1(o) 6.1 07/07/2025
108A-147.6 64 H546 6.1(p) 6.1 07/07/2025
108A-147.6A 64 H546 6.1(q) 6.1 07/07/2025
108A-147.11 64 H546 6.1(r) 6.1 07/07/2025
108A-147.11 (a)(2) 89 H125 2B.12(b) 2 07/01/2025
108A-148.1 (a) 64 H546 6.1(a) 6.1 07/07/2025
108A-150 (g) 27 H576 5.2 5.2 06/27/2025
108C-3 27 H576 2.3(a) 2.3 01/01/2023
108C-3 (c)(1a), (16), (e), (g) 27 H576 2.3(b) 2.3 01/01/2024
108C-5 25 H40 29(5) 29.5 06/26/2025
108C-9 25 H40 29(5) 29.5 06/26/2025
108D-1 25 H40 29(1) 29.1 06/26/2025
108D-16 25 H40 24(g) 24 06/26/2025
108D-40 (a)(9), (9a) 1 27 H576 2.2(a) 2.2 06/27/2025
108D-40 (a)(14) 2 64 H546 4.1(b) 4.1 07/07/2025
110-45 Art. 3 25 H40 11 11 06/26/2025
110-46 25 H40 11 11 06/26/2025
110-47 25 H40 11 11 06/26/2025
110-48 25 H40 11 11 06/26/2025
110-86 (3) 1 36 H412 18(a) 18 07/01/2025
110-86 (5a) 2 36 H412 2 2 07/01/2025
110-91 1 36 H412 5(a) 5 07/01/2025
110-91 (1) 1.5 37 H67 6.1(i) 6.1 See Bill
110-91 (4), (5) 2 36 H412 18(b) 18 07/01/2025
110-91 (7)a. 3 36 H412 6 6 07/01/2025
110-91 (8) 4 36 H412 7(a) 7 07/01/2025
110-98.5 (3) 36 H412 14.2 14 07/01/2025
110-105.3 25 H40 29(5) 29.5 06/26/2025
110-106.3 36 H412 14 14 07/01/2025
110-130 25 H40 12 12 06/26/2025
110-139 25 H40 29(3) 29.3 06/26/2025
113-136 S50 16 16 12/01/2025 Vetoed
113-217 25 H40 29(5) 29.5 06/26/2025
113-221 25 H40 29(3) 29.3 06/26/2025
113-229 (n)(3) 48 S472 3(c) 3 07/02/2025
113-281 Art. 21A 97 S449 4.5(a) 4.5 10/22/2025
113-282 97 S449 4.5(a) 4.51 10/22/2025
113-283 97 S449 4.5(a) 4.52 10/22/2025
113-284 97 S449 4.5(a) 4.53 10/22/2025
113-285 97 S449 4.5(a) 4.54 10/22/2025
113-286 97 S449 4.5(a) 4.55 10/22/2025
113-287 97 S449 4.5(a) 4.56 10/22/2025
113-333 25 H40 29(5) 29.5 06/26/2025
113-391 25 H40 29(6) 29.6 06/26/2025
113-391.1 (e) 54 H620 14(c) 14 12/01/2025
113-423 25 H40 29(5) 29.5 06/26/2025
113-425 25 H40 29(1) 29.1 06/26/2025
113A-103 (8a) 48 S472 3(a) 3 07/02/2025
113A-113 (b)(2), (5), (b1) 48 S472 3(b) 3 07/02/2025
113A-129.10 Art. 7, Part 5A 48 S472 2 2 07/02/2025
113A-129.11 48 S472 2 2 07/02/2025
113A-129.12 48 S472 2 2 07/02/2025
114-8.7 25 H40 29(1) 29.1 06/26/2025
114-8.7 25 H40 29(5) 29.5 06/26/2025
114-9.4 25 H40 29(5) 29.5 06/26/2025
114-9.7 25 H40 29(5) 29.5 06/26/2025
115C-12 25 H40 29(5) 29.5 06/26/2025
115C-12 (9c)d. 1 S227 1 1 * Vetoed
115C-12 (18)f. 2 20 H91 2.8 2.8 06/26/2025
115C-12 (50) 3 46 H378 1.1(c) 1.1 07/01/2025
115C-37.1 (d) 3 H58 2.2(e) 2.4 12/07/2026
115C-37.1 (d) 13 H3 2(c) 2 12/04/2028
115C-37.1 (d) 13 H3 2.1(e) 2.1 12/07/2026
115C-37.1 (d) 32 H309 4.5 4.5 6/30/2025
115C-47 25 H40 29(5) 29.5 06/26/2025
115C-47 (18) S227 2.5(a) 2.5 * Vetoed
115C-47 (33b), (33c) 84 H805 3.2(a) 3.2 07/29/2025
115C-47 (70), (71) 46 H378 1.1(d) 1.1 07/01/2025
115C-47 (72) 38 H959 1(b) 1 07/01/2025
115C-76.100 Art. 7B, Part 8 38 H959 3(a) 3 07/01/2025
115C-76.110 84 H805 3.4(a) 3.4 07/29/2025
115C-76.200 S227 2 2 * Vetoed
115C-76.205 S227 2 2 * Vetoed
115C-76.210 S227 2 2 * Vetoed
115C-81.26 38 H959 2(a) 2 07/01/2025
115C-83.10 25 H40 29(5) 29.5 06/26/2025
115C-83.15 25 H40 29(5) 29.5 06/26/2025
115C-84.3 (a)(3) 56 S125 2(i) 2 07/03/2025
115C-98.1 84 H805 3.3(a) 3.3 07/29/2025
115C-102.10 46 H378 1.1(a) 1.1 07/01/2025
115C-102.11 46 H378 1.1(a) 1.1 07/01/2025
115C-102.12 38 H959 1(a) 1 07/01/2025
115C-105.25 25 H40 29(5) 29.5 06/26/2025
115C-105.27 25 H40 29(5) 29.5 06/26/2025
115C-105.37 25 H40 29(5) 29.5 06/26/2025
115C-105.39A 25 H40 29(5) 29.5 06/26/2025
115C-109.1 25 H40 29(5) 29.5 06/26/2025
115C-111.2 40 S77 1 1 07/01/2025
115C-150.12C (37), (38) 46 H378 1.1(e) 1.1 07/01/2025
115C-174.12 25 H40 29(5) 29.5 06/26/2025
115C-218 (a1), (b)(10), (c)(2) 80 S254 1 1 07/29/2025
115C-218.8 (4) 80 S254 2 2 07/29/2025
115C-218.15 (c) 80 S254 3 3 07/29/2025
115C-218.33 46 H378 1.1(f) 1.1 07/01/2025
115C-218.65 25 H40 29(5) 29.5 06/26/2025
115C-218.75 (a) 60 S600 4(c) 4 07/03/2025
115C-218.85 25 H40 29(5) 29.5 06/26/2025
115C-218.85 (d) 80 S254 4 4 07/29/2025
115C-218.90 (a)(7) 80 S254 5 5 07/29/2025
115C-218.94 (c) 80 S254 6 6 07/29/2025
115C-218.105 (a2), (c2), (c3) 80 S254 7 7 07/29/2025
115C-218.106 80 S254 8 8 07/29/2025
115C-218.123 (c) 80 S254 9 9 07/29/2025
115C-218.125 80 S254 10 10 07/29/2025
115C-238.54A 92 H358 2.9(d) 2.9 09/30/2025
115C-238.54A 97 S449 2.1(a) 2.1 10/22/2025
115C-238.55 56 S125 2(j) 2 07/03/2025
115C-238.66 25 H40 29(5) 29.5 06/26/2025
115C-238.66 (7) 1 60 S600 4(d) 4 07/03/2025
115C-238.66 (18a), (18b) 2 46 H378 1.1(g) 1.1 07/01/2025
115C-238.85 92 H358 2.11(k) 2.11 09/30/2025
115C-264 (a1) 89 H125 2A.8(a) 2 07/01/2025
115C-269.50 25 H40 29(5) 29.5 06/26/2025
115C-269.55 25 H40 29(5) 29.5 06/26/2025
115C-270.1 (1b), (3a), (3b) 56 S125 3(a) 3 07/03/2025
115C-270.1 (1b), (3a), (3b) 38 H959 4(a) 4 07/01/2025
115C-270.1 (1b), (3a), (3b) 92 H358 2.6 2.6 09/30/2025
115C-270.20 (a)(5) 56 S125 3(b) 3 07/03/2025
115C-270.20 (a)(5) 38 H959 4(b) 4 07/01/2025
115C-270.20 (a)(5) 92 H358 2.6 2.6 09/30/2025
115C-270.30 (b2) S227 3 3 * Vetoed
115C-284 25 H40 13(a) 13 06/26/2025
115C-288 25 H40 29(1) 29.1 06/26/2025
115C-299 25 H40 13(b) 13 06/26/2025
115C-310.15 (d) 94 H926 7(b) 7 10/06/2025
115C-315 (a) 25 H40 13(c) 13 06/26/2025
115C-315 (b) 25 H40 3(d) 3 06/26/2025
115C-315 (d2) 60 S600 5(a) 5 07/03/2025
115C-319 Art. 21A, title 73 S375 2(b) 2 07/09/2025
115C-320 73 S375 2(a) 2 07/09/2025
115C-332 (b), (j), (k) 47 S391 12(a) 12 10/01/2025
115C-366 (a9) 72 S118 2(a) 2 07/09/2025
115C-366 (a9)(4) 92 H358 2.2 2.2 09/30/2025
115C-369 25 H40 29(1) 29.1 06/26/2025
115C-375.2 (a) 60 S600 4(a) 4 07/03/2025
115C-375.2A 60 S600 4(b) 4 07/03/2025
115C-390.2 25 H40 36.1(a) 36.1 06/26/2025
115C-390.2 (b) S227 2.5(b) 2.5 * Vetoed
115C-390.5 25 H40 36.1(b) 36.1 06/26/2025
115C-390.6 25 H40 29(1) 29.1 06/26/2025
115C-390.8 25 H40 29(1) 29.1 06/26/2025
115C-401.2 25 H40 29(1) 29.1 06/26/2025
115C-401.2 25 H40 29(3) 29.3 06/26/2025
115C-401.2 25 H40 29(5) 29.5 06/26/2025
115C-407.57 (b)(2)f. 49 H928 1 1 07/02/2025
115C-555 (2) 92 H358 2.11(l) 2.11 09/30/2025
115C-562.2 25 H40 29(1) 29.1 06/26/2025
115C-562.2 25 H40 29(5) 29.5 06/26/2025
115C-592 25 H40 29(1) 29.1 06/26/2025
115D-1 Art. 1, Part 1 56 S125 1(a) 1 07/03/2025
115D-1.3 56 S125 1(a) 1 07/03/2025
115D-2 (2) 56 S125 2(k) 2 07/03/2025
115D-4.1 56 S125 1(a) 1 07/03/2025
115D-5 56 S125 1(a) 1 07/03/2025
115D-5 (aa), (bb) S558 1(b) 1 * Vetoed
115D-5 (b)(2)i. 57 S655 5 5 07/03/2025
115D-5.1 56 S125 1(a) 1 07/03/2025
115D-5.1A 56 S125 1(a) 1 07/03/2025
115D-5.2 56 S125 1(a) 1 07/03/2025
115D-5.5 56 S125 1(a) 1 07/03/2025
115D-6 Art. 1, Part 2 56 S125 1(a) 1 07/03/2025
115D-6.1 56 S125 1(a) 1 07/03/2025
115D-6.2 56 S125 1(a) 1 07/03/2025
115D-6.5 (c) 56 S125 1(a) 1 07/03/2025
115D-9.5 56 S125 1(a) 1 07/03/2025
115D-9.10 56 S125 1(a) 1 07/03/2025
115D-9.15 56 S125 1(a) 1 07/03/2025
115D-9.20 56 S125 1(a) 1 07/03/2025
115D-9.25 56 S125 1(a) 1 07/03/2025
115D-9.30 56 S125 1(a) 1 07/03/2025
115D-9.35 56 S125 1(a) 1 07/03/2025
115D-9.40 46 H378 1.2(a) 1.2 07/01/2025
115D-10.5 Art. 1, Part 3 56 S125 1(a) 1 07/03/2025
115D-10.10 56 S125 1(a) 1 07/03/2025
115D-10.15 56 S125 1(a) 1 07/03/2025
115D-10.17 56 S125 1(a) 1 07/03/2025
115D-10.17 (e) 56 S125 2.5.(a) 2.5 07/03/2025
115D-10.19 56 S125 1(a) 1 07/03/2025
115D-10.21 56 S125 1(a) 1 07/03/2025
115D-10.25 56 S125 1(a) 1 07/03/2025
115D-10.30 56 S125 1(a) 1 07/03/2025
115D-10.35 56 S125 1(a) 1 07/03/2025
115D-10.40 56 S125 1(a) 1 07/03/2025
115D-10.45 56 S125 1(a) 1 07/03/2025
115D-10.50 56 S125 1(a) 1 07/03/2025
115D-10.65 Art. 1, Part 4 56 S125 1(a) 1 07/03/2025
115D-10.70 56 S125 1(a) 1 07/03/2025
115D-10.75 56 S125 1(a) 1 07/03/2025
115D-10.76 56 S125 1(a) 1 07/03/2025
115D-10.80 46 H378 2(b) 2 07/01/2025
115D-20 (4) 56 S125 1(b) 1 07/03/2025
115D-20 (4)a. 46 H378 3(a) 3 07/01/2025
115D-21.2 56 S125 1(c) 1 07/03/2025
115D-21.2 92 H358 2.11(b) 2.11 09/30/2025
115D-21.5 56 S125 1(d) 1 07/03/2025
115D-21.10 56 S125 1(e) 1 07/03/2025
115D-30.1 (b)(1), (3) 56 S125 2.5(b) 2.5 07/03/2025
115D-30.5 Art. 2B 56 S125 1(f) 1 07/03/2025
115D-30.10 56 S125 1(f) 1 07/03/2025
115D-30.15 56 S125 1(f) 1 07/03/2025
115D-30.20 56 S125 1(f) 1 07/03/2025
115D-30.25 56 S125 1(f) 1 07/03/2025
115D-30.25 (e) 56 S125 2.5(c) 2.5 07/03/2025
115D-30.30 56 S125 1(f) 1 07/03/2025
115D-31.1 56 S125 1(g) 1 07/03/2025
115D-31.2 56 S125 1(g) 1 07/03/2025
115D-31.3 56 S125 1(g) 1 07/03/2025
115D-31.3 (e) 56 S125 2.5(d) 2.5 07/03/2025
115D-32 56 S125 1(g) 1 07/03/2025
115D-33 56 S125 1(g) 1 07/03/2025
115D-34 56 S125 1(g) 1 07/03/2025
115D-35 56 S125 1(g) 1 07/03/2025
115D-36 56 S125 1(g) 1 07/03/2025
115D-37 56 S125 1(g) 1 07/03/2025
115D-38 56 S125 1(g) 1 07/03/2025
115D-38.5 56 S125 1(i) 1 07/03/2025
115D-38.10 56 S125 1(j) 1 07/03/2025
115D-39 56 S125 1(f) 1 07/03/2025
115D-39 (a1) 56 S125 2(l) 2 07/03/2025
115D-39.1 56 S125 1(f) 1 07/03/2025
115D-39.2 56 S125 1(h) 1 07/03/2025
115D-39.5 56 S125 1(h) 1 07/03/2025
115D-39.5 (a)(2)j. 92 H358 2.3(a) 2.3 09/30/2025
115D-40.1 56 S125 1(f) 1 07/03/2025
115D-40.5 56 S125 1(f) 1 07/03/2025
115D-41 1 56 S125 1(f) 1 07/03/2025
115D-41 2 56 S125 1(i) 1 07/03/2025
115D-41 (a) 3 56 S125 2(m) 2 07/02/2025
115D-43 1 56 S125 1(f) 1 07/03/2025
115D-43 2 56 S125 1(j) 1 07/03/2025
115D-44 1 56 S125 1(f) 1 07/03/2025
115D-44 2 56 S125 1(k) 1 07/03/2025
115D-72 Art. 6A 56 S125 2(n) 2 07/03/2025
115E-31.3 25 H40 29(3) 29.3 06/26/2025
116-11 97 S449 2.4 2.4 07/01/2025
116-11 (9b) 4 H74 2.1 2.1 05/14/2025
116-11 (9c) 46 H378 1.3(a) 1.3 07/01/2025
116-11 (9c) S558 1(a) 1 * Vetoed
116-11.4 92 H358 2.11(a) 2.11 09/30/2025
116-30.2 25 H40 14(a) 14 06/26/2025
116-40.14 S153 6 6 * Vetoed
116-44.9A Art. 1, Part 8A 46 H378 4(a) 4 07/01/2025
116-44.9B 46 H378 4(a) 4 07/01/2025
116-44.9C 46 H378 4(a) 4 07/01/2025
116-46.9A Art. 1, Part 8A 92 H358 2.5 2.5 09/30/2025
116-46.9B 92 H358 2.5 2.5 09/30/2025
116-46.9C 92 H358 2.5 2.5 09/30/2025
116-74.44 25 H40 29(6) 29.6 06/26/2025
116-143 (d), (d1), (d2) 17 H373 1 1 06/26/2025
116-143 (d1)(1)a., b. 92 H358 2.4(a) 2.4 06/26/2025
116-143.3 (a)(2) 20 H91 1.3 1.3 06/26/2025
116-143.3B 72 S118 3(b) 3.1 07/09/2025
116-143.11 (a) 97 S449 2.2(a) 2.2 07/01/2025
116-201 (b) 92 H358 2.11(m) 2.11 09/30/2025
116-201 (b)(8) 56 S125 2(o) 2 07/03/2025
116-204 (14) H87 1 1 * Vetoed
116-209.16A 25 H40 29(5) 29.5 06/26/2025
116-209.28 25 H40 15 15 06/26/2025
116-209.62 25 H40 29(6) 29.6 06/26/2025
116-209.110 Art. 23, Part 8 H87 2 2 * Vetoed
116-209.111 H87 2 2 * Vetoed
116-235 (b)(1) 20 H91 1.4 1.4 06/26/2025
116-239.8 25 H40 29(5) 29.5 06/26/2025
116-239.8 (b)(21a), (21b) 46 H378 1.1(h) 1.1 07/01/2025
116-239.8 (b)(9) 60 S600 4(e) 4 07/03/2025
116-255 (b)(6) 4 H74 2.3(b) 2.3 05/14/2025
116-280 (3) 56 S125 2(p) 2 07/03/2025
116-280 (3) 92 H358 2.11(n) 2.11 09/30/2025
116-300 (9) S558 4 4 * Vetoed
116-301 25 H40 29(5) 29.5 06/26/2025
116-415 Art. 39 S558 2 2 * Vetoed
116-416 S558 2 2 * Vetoed
116-417 S558 2 2 * Vetoed
116A-44.9A Art. 1, Part 8A 72 S118 3(a) 3 07/09/2025
116A-44.9B 72 S118 3(a) 3 07/09/2025
116A-44.9C 72 S118 3(a) 3 07/09/2025
116B-60 25 H40 29(1) 29.1 06/26/2025
116E-1 Chapter, title 62 S133 3(a) 3 07/01/2025
116E-2 62 S133 3(a) 3 07/01/2025
116E-4 62 S133 3(a) 3 07/01/2025
116E-5 62 S133 3(a) 3 07/01/2025
116E-6 62 S133 3(a) 3 07/01/2025
120-4.8 (4d) 11 H477 8(a) 8 06/13/2025
120-4.10 11 H477 8(b) 8 06/13/2025
120-4.21 (b2)(3) 19 H476 7.1 7.1 06/26/2025
120-4.26A 11 H477 8(c) 8 06/13/2025
120-4.27 11 H477 8(d) 8 06/13/2025
120-4.28 19 H476 7.2 7.2 06/26/2025
120-4.33A (c) 19 H476 2.1(d) 2.1 06/26/2025
120-29.5 25 H40 29(5) 29.5 06/26/2025
120-32 (1) 19 H476 5.1(a) 5.1 06/26/2025
120-32.2 97 S449 6.7(b) 6.7 07/01/2025
120-70.101 25 H40 29(6) 29.6 06/26/2025
120C-100 25 H40 29(1) 29.1 06/26/2025
120C-100 25 H40 29(5) 29.5 06/26/2025
121-6 (b), (c) 10 S477 4 4 06/13/2025
121-12.1 10 S477 7(a) 7.0 06/13/2025
121-42 25 H40 16 16 06/26/2025
121-52 25 H40 29(5) 29.5 06/26/2025
122A-5.14 25 H40 29(6) 29.6 06/26/2025
122C-24 25 H40 24(h) 24 06/26/2025
122C-24.1 (h), (j) 25 H40 24(i) 24 06/26/2025
122C-54 (d) 93 H307 1(f) 1 10/03/2025
122C-142.2 16 H612 1.16(a) 1.16 06/26/2025
122C-256 27 H576 6(a) 6 06/27/2025
122C-263.1 25 H40 29(5) 29.5 06/26/2025
122C-266 (a), (b1) 93 H307 9.5(a) 9.5 12/01/2025
122C-268 (c) 93 H307 7(c) 7 12/01/2025
122C-271 54 H620 11(a) 11 07/02/2025
122C-277 (b) 93 H307 7(d) 7 12/01/2025
122C-287 (1) 54 H620 11(b) 11 07/02/2025
126-1 25 H40 29(6) 29.6 06/26/2025
126-3.1 34 S124 5(a) 5 07/01/2025
126-5 (c1)(8) 1 4 H74 2.2(a) 2.2 01/01/2026
126-5 (c1)(40) 2.1 97 S449 5.4 5.4 07/01/2025
126-5 (c1)(40), (41) 2.2 6 H506 4.1(b) 4.1 07/01/2025
126-5 (c2) 3 6 H506 4.1(b) 4.1 07/01/2025
126-5 (c2)(3) 3.5 56 S125 2(q) 2 07/03/2025
126-5 (c7) 4 34 S124 2(b) 2.1 07/01/2025
126-5 (c11)(2)d. 5 10 S477 5(a) 5.0 06/13/2025
126-5 (c14), (d)(1)(2), (d)(1)(4) 5.5 89 H125 2E.3(b) 2 07/01/2025
126-5 (c17) 6 34 S124 2(c) 2.2 07/01/2025
126-5 (c18) 7 34 S124 2(d) 2.3 07/01/2025
126-5 (c22) 9 H171 1.1(b) 1.1 07/01/2026 Vetoed
126-6.3 (a) 47 S391 9 9 07/01/2025
126-6.4 34 S124 6(a) 6 07/01/2025
126-8.7 34 S124 1 1 07/01/2025
126-11.1 34 S124 9 9 07/01/2025
126-11.2 34 S124 10 10 07/01/2025
126-14.2 (b), (b1) 34 S124 3(a) 3 07/01/2025
126-14.3 (3) 34 S124 4(a) 4 07/01/2025
126-14.3A 34 S124 2(a) 2 07/01/2025
126-14.3B 34 S124 7 7 07/01/2025
126-14.7 H171 1.1(a) 1.1 07/01/2026 Vetoed
126-81 25 H40 17(a) 17 06/26/2025
126-85 25 H40 14(b) 14 06/26/2025
127A-50 51 S710 8(a) 8 07/02/2025
127A-50.1 51 S710 8(b) 8 07/02/2025
127A-56 51 S710 8(c) 8 07/02/2025
127A-57 51 S710 8(d) 8 07/02/2025
127A-59 51 S710 8(e) 8 07/02/2025
127A-60 51 S710 8(f) 8 07/02/2025
127A-65 25 H40 29(5) 29.5 06/26/2025
128-21 Art. 3, Part 1 1 11 H477 4(a) 4 06/13/2025
128-21 2 11 H477 6(a) 6 06/13/2025
128-22 11 H477 4(a) 4 06/13/2025
128-23 11 H477 4(a) 4 06/13/2025
128-23.1 11 H477 4(a) 4 06/13/2025
128-24 11 H477 4(a) 4 06/13/2025
128-24 (a) 11 H477 10(b) 10 06/13/2025
128-26 11 H477 4(a) 4 06/13/2025
128-26.1 19 H476 7.4 7.4 06/26/2025
128-26.1 25 H40 37 37 06/26/2025
128-26.5 11 H477 4(a) 4 06/13/2025
128-26A 11 H477 4(a) 4 06/13/2025
128-26A 19 H476 7.4 7.4 06/26/2025
128-26A 25 H40 37 37 06/26/2025
128-27 0 11 H477 4(a) 4 06/13/2025
128-27 (l) 01 11 H477 4(b) 4.2 06/13/2025
128-27 (l) 02 11 H477 4(c) 4.3 06/13/2025
128-27 (l) 03 11 H477 4(d) 4.4 06/13/2025
128-27 (l) 05 11 H477 4(e) 4.6 06/13/2025
128-27 (l) 06 11 H477 4(g) 4.62 06/13/2025
128-27 (l) 07 11 H477 4(h) 4.63 06/13/2025
128-27 (l) 08 11 H477 4(i) 4.64 06/13/2025
128-27 (l) 09 11 H477 4(q) 4.73 06/13/2025
128-27 (l) 10 11 H477 5(a) 5 06/13/2025
128-27 (l)(2)a. 12 11 H477 4(j) 4.65 06/13/2025
128-27 (l)(2)b. 13 11 H477 4(k) 4.67 06/13/2025
128-27 (l)(2)c. 14 11 H477 4(l) 4.68 06/13/2025
128-27 (l)(3) 15 11 H477 4(m) 4.69 06/13/2025
128-27 (l)(4) 16 11 H477 4(n) 4.70 06/13/2025
128-27 (l1) 16.1 11 H477 4(f) 4.61 06/13/2025
128-27 (l1) 16.5 11 H477 5(a) 5 06/13/2025
128-27 (l2), (l3), (l4), (l5) 16.7 11 H477 5(b) 5 06/13/2025
128-27 (l6) 17 11 H477 4(o) 4.71 06/13/2025
128-27 (l6) 18 11 H477 4(p) 4.72 06/13/2025
128-27 (l6) 20 11 H477 5(a) 5 06/13/2025
128-27 (m) 21 11 H477 9(b) 9 06/13/2025
128-28 (f1) 04 11 H477 4(d1) 4.45 06/13/2025
128-28 1 11 H477 4(a) 4 06/13/2025
128-28 2 25 H40 18(a) 18 06/26/2025
128-28 (c) 3 19 H476 7.3 7.3 06/26/2025
128-29 11 H477 4(a) 4 06/13/2025
128-29 (c) 6 H506 4.1(a) 4.2 01/01/2026
128-29 (g)(2) 19 H476 7.6(b) 7.6 06/26/2025
128-30 11 H477 4(a) 4 06/13/2025
128-30 (g) 11 H477 11(b) 11 06/13/2025
128-31 11 H477 4(a) 4 06/13/2025
128-31 25 H40 29(5) 29.5 06/26/2025
128-32.1 11 H477 4(a) 4 06/13/2025
128-33 11 H477 4(a) 4 06/13/2025
128-34 11 H477 4(a) 4 06/13/2025
128-35 11 H477 4(a) 4 06/13/2025
128-36 11 H477 4(a) 4 06/13/2025
128-37 11 H477 4(a) 4 06/13/2025
128-37.1 11 H477 4(a) 4 06/13/2025
128-37.2 11 H477 4(a) 4 06/13/2025
128-38 11 H477 4(a) 4 06/13/2025
128-38.1 11 H477 4(a) 4 06/13/2025
128-38.2 11 H477 4(a) 4 06/13/2025
128-38.3 11 H477 4(a) 4 06/13/2025
128-38.4 11 H477 4(a) 4 06/13/2025
128-38.4A 11 H477 4(a) 4 06/13/2025
128-38.4A (c) 19 H476 2.1(b) 2.1 06/26/2025
128-38.4B 11 H477 4(a) 4 06/13/2025
128-38.5 11 H477 4(a) 4 06/13/2025
128-38.6 11 H477 4(a) 4 06/13/2025
128-38.10 11 H477 4(a) 4 06/13/2025
128-38.29 11 H477 4(a) 4 06/13/2025
128-38.30 Art. 3, Part 2 1 11 H477 4(a1) 4.1 06/13/2025
128-38.30 Art. 3, Part 2 2 11 H477 6(b) 6 06/13/2025
128-38.30 (a) 3 11 H477 4(b) 4.2 06/13/2025
128-38.30 (b) 4 11 H477 4(c) 4.3 06/13/2025
128-38.31 1 11 H477 4(a1) 4.1 06/13/2025
128-38.31 2 11 H477 6(b) 6 06/13/2025
128-38.31 (a) 3 11 H477 4(d) 4.4 06/13/2025
128-38.31 (b) 4 11 H477 4(d1) 4.45 06/13/2025
128-38.35 1 11 H477 4(a1) 4.1 06/13/2025
128-38.35 2 11 H477 6(b) 6 06/13/2025
128-38.35 (a) 3 11 H477 4(e) 4.6 06/13/2025
128-38.35 (a) 4 11 H477 4(f) 4.61 06/13/2025
128-38.35 (b) 5 11 H477 4(g) 4.62 06/13/2025
128-38.35 (c) 6 11 H477 4(h) 4.63 06/13/2025
128-38.35 (d) 7 11 H477 4(i) 4.64 06/13/2025
128-38.36 1 11 H477 4(a1) 4.1 06/13/2025
128-38.36 2 11 H477 6(b) 6 06/13/2025
128-38.36 (1) 3 11 H477 4(k) 4.67 06/13/2025
128-38.36 (2)a. 4 11 H477 4(l) 4.68 06/13/2025
128-38.36 (2)b. 5 11 H477 4(m) 4.69 06/13/2025
128-38.36 (2)c. 6 11 H477 4(n) 4.70 06/13/2025
128-38.36 (3) 7 11 H477 4(j) 4.65 06/13/2025
128-38.40 1 11 H477 4(a1) 4.1 06/13/2025
128-38.40 2 11 H477 6(b) 6 06/13/2025
128-38.40 (b) 3 11 H477 4(o) 4.71 06/13/2025
128-38.40 (c) 4 11 H477 4(p) 4.72 06/13/2025
128-38.45 11 H477 4(a1) 4.1 06/13/2025
128-38.45 11 H477 6(b) 6 06/13/2025
128-38.46 11 H477 4(a1) 4.1 06/13/2025
128-38.46 11 H477 4(q) 4.73 06/13/2025
128-38.46 11 H477 6(b) 6 06/13/2025
130A-4.3 (b) 27 H576 1.1 1.1 06/27/2025
130A-22 (b3) 60 S600 3(b) 3 07/03/2025
130A-26.2 25 H40 29(6) 29.6 06/26/2025
130A-33.50 (b) 27 H576 4.3(a) 4.3 06/27/2025
130A-35 25 H40 29(6) 29.6 06/26/2025
130A-37 25 H40 29(6) 29.6 06/26/2025
130A-39 (b) 94 H926 16 16 10/06/2025
130A-45.1 25 H40 29(6) 29.6 06/26/2025
130A-50 (h) 50 H768 2 2 07/02/2025
130A-64.1 25 H40 29(1) 29.1 06/26/2025
130A-64.1 25 H40 29(5) 29.5 06/26/2025
130A-97 27 H576 4.4 4.4 06/27/2025
130A-99 (a) 9 S248 2 2 01/01/2026
130A-101 (f) 75 H992 4 4 12/01/2025
130A-118 (a1) 44 H537 3(a) 3 07/01/2025
130A-118 (a2) 44 H537 4(a), (b) 4 07/01/2025
130A-118 (f) 84 H805 4(a) 4 12/01/2025
130A-125 25 H40 29(6) 29.6 06/26/2025
130A-126 25 H40 29(6) 29.6 06/26/2025
130A-128.1 25 H40 29(5) 29.5 06/26/2025
130A-131.31 25 H40 29(3) 29.3 06/26/2025
130A-131.32 25 H40 29(5) 29.5 06/26/2025
130A-131.33 25 H40 29(5) 29.5 06/26/2025
130A-131.35 25 H40 29(5) 29.5 06/26/2025
130A-213 27 H576 4.3(b) 4.3 06/27/2025
130A-215.5 27 H576 4.5 4.5 06/27/2025
130A-248 (c4) 94 H926 13 13 10/06/2025
130A-280 94 H926 17 17 10/06/2025
130A-309.06 (c)(10) 66 S706 1(d) 1 10/01/2025
130A-309.09C (g) 66 S706 1(e) 1 10/01/2025
130A-309.11 25 H40 29(6) 29.6 06/26/2025
130A-309.22 25 H40 29(6) 29.6 06/26/2025
130A-309.28 92 H358 2.11(o) 2.11 09/30/2025
130A-309.54 66 S706 1(f) 1 10/01/2025
130A-309.63 66 S706 1(b) 1 10/01/2025
130A-309.64 66 S706 1(c) 1 10/01/2025
130A-309.131 25 H40 29(3) 29.3 06/26/2025
130A-309.136 25 H40 29(5) 29.5 06/26/2025
130A-309.138 25 H40 29(3) 29.3 06/26/2025
130A-309.138 25 H40 29(5) 29.5 06/26/2025
130A-309.207 25 H40 29(6) 29.6 06/26/2025
130A-309.213 25 H40 29(1) 29.1 06/26/2025
130A-309.213 25 H40 29(5) 29.5 06/26/2025
130A-309.214 25 H40 29(1) 29.1 06/26/2025
130A-309.214 25 H40 29(5) 29.5 06/26/2025
130A-310.39 53 S387 2 2 07/02/2025
130A-310.54 25 H40 29(5) 29.5 06/26/2025
130A-336.1 25 H40 29(1) 29.1 06/26/2025
130A-336.1 25 H40 29(6) 29.6 06/26/2025
130A-336.2 25 H40 29(6) 29.6 06/26/2025
130A-343 25 H40 29(3) 29.3 06/26/2025
130A-343 (j3) 94 H926 30 30 10/06/2025
130A-382 25 H40 29(5) 29.5 06/26/2025
130A-385 70 S429 2(a) 2 10/01/2025
130A-385 (e) 28 H568 1.4 1.4 06/27/2025
130A-389 (a) 70 S429 2(b) 2 10/01/2025
130A-389.1 (a), (d) 70 S429 2(c) 2 10/01/2025
130A-412.7 (a)(1a), (c3) 60 S600 2(c) 2 01/01/2027
130A-412.22 25 H40 29(5) 29.5 06/26/2025
130A-415 (j) 76 H1003 1.16 1.16 10/01/2025
130A-453.33 Art. 19C 60 S600 3(a) 3 07/03/2025
130A-453.34 60 S600 3(a) 3 07/03/2025
130A-453.35 60 S600 3(a) 3 07/03/2025
130A-453.42 25 H40 29(5) 29.5 06/26/2025
130A-465 25 H40 29(3) 29.3 06/26/2025
130A-469 25 H40 29(3) 29.3 06/26/2025
130A-480 25 H40 29(4) 29 06/26/2025
130A-480 25 H40 29(1) 29.1 06/26/2025
131-176 (7a) 25 H40 39.3(a) 39.3 11/21/2026
131A-3 25 H40 38(a) 38 06/26/2025
131D-2.3 27 H576 3.1 3.1 06/27/2025
131D-2.5 (b) 27 H576 3.2(a) 3.2 12/01/2025
131D-2.6 27 H576 3.2(b) 3.2 12/01/2025
131D-2.11 25 H40 29(5) 29.5 06/26/2025
131D-2.16 25 H40 29(6) 29.6 06/26/2025
131D-4.5C 25 H40 29(5) 29.5 06/26/2025
131D-10 25 H40 29(5) 29.5 06/26/2025
131D-10.3A (f) 27 H576 5.3(b) 5.3 06/27/2025
131D-34 (g), (i) 25 H40 24(j) 24 06/26/2025
131E-76 (1c) 27 H576 3.3(a) 3.3 06/27/2025
131E-78.4 37 H67 8(a) 8 01/01/2026
131E-78.5 25 H40 29(5) 29.5 06/26/2025
131E-84 (a2) 18 H251 5 5 06/26/2025
131E-88.2 27 H576 3.3(b) 3.3 06/27/2025
131E-129 (f) 25 H40 24(k) 24 06/26/2025
131E-131 25 H40 29(6) 29.6 06/26/2025
131E-147.2 37 H67 8(b) 8 01/01/2026
131E-147.5 (c) 89 H125 2B.11(a) 2 11/21/2025
131E-154.12 Art. 6, Part 6 27 H576 3.4 3.4 06/27/2025
131E-154.13 27 H576 3.4 3.4 06/27/2025
131E-154.14 27 H576 3.4 3.4 06/27/2025
131E-155.2 42 H975 2(b) 2 See Bill
131E-158 (c) 42 H975 1(a) 1 07/01/2025
131E-176 1 25 H40 39.2(a) 39.2 06/26/2025
131E-176 (5a), (5c) 2 25 H40 39.1(a) 39.1 06/26/2025
131E-176 (7e), (10) 3 25 H40 39.1(b) 39.1 06/26/2025
131E-176 (9b) 3.5 25 H40 39.4(a) 39.4 11/21/2026
131E-176 (13), (13d) 4 25 H40 39.1(c) 39.1 06/26/2025
131E-176 (14o) 7 25 H40 39.3(b) 39.3 11/21/2026
131E-176 (16)f1.7. 8 25 H40 39.3(c) 39.3 11/21/2026
131E-176.2 25 H40 39.2(b) 39.2 06/26/2025
131E-177 25 H40 39.2(c) 39.2 06/26/2025
131E-214.2 25 H40 29(5) 29.5 06/26/2025
131E-214.13 25 H40 29(5) 29.5 06/26/2025
131E-214.14 25 H40 29(5) 29.5 06/26/2025
131F-9 25 H40 29(1) 29.1 06/26/2025
131F-10 25 H40 29(1) 29 06/26/2025
131F-30 25 H40 29(5) 29.5 06/26/2025
131F-33 25 H40 29(6) 29.6 06/26/2025
132-1.2 (11) 46 H378 8(a) 8 07/01/2025
132-1.4 (c)(4) 70 S429 21 21 07/09/2025
132-1.5 25 H40 29(1) 29.1 06/26/2025
132-1.8 70 S429 2(d) 2 10/01/2025
132-1.10 25 H40 29(1) 29.1 06/26/2025
132-1.10 25 H40 29(3) 29.3 06/26/2025
132-1.10 25 H40 29(5) 29.5 06/26/2025
132-1.11A 25 H40 29(1) 29.1 06/26/2025
132-1.13 25 H40 29(1) 29.1 06/26/2025
132-1.14 25 H40 29(1) 29.1 06/26/2025
135-3 (a)(8) 19 H476 5.1(b) 5.1 06/26/2025
135-3 (b) 19 H476 5.1(c) 5.1 06/26/2025
135-3 (c) 01 11 H477 10(a) 10 06/13/2025
135-5 (hh) 19 H476 5.1(d) 5.1 06/26/2025
135-5 (l) 02 11 H477 1(h) 1.65 06/13/2025
135-5 (l) 03 11 H477 1(i) 1.66 06/13/2025
135-5 (l) 04 11 H477 1(j) 1.67 06/13/2025
135-5 (l) 05 11 H477 1(k) 1.69 06/13/2025
135-5 (l) 06 11 H477 1(l) 1.70 06/13/2025
135-5 (l) 07 11 H477 1(m) 1.71 06/13/2025
135-5 (l) 08 11 H477 1(s) 1.77 06/13/2025
135-5 (l) 09 11 H477 1(t) 1.78 06/13/2025
135-5 (l) 10 11 H477 1(u) 1.78 06/13/2025
135-5 (l) 11 11 H477 1(v) 1.79 06/13/2025
135-5 (l) 12 11 H477 1(w) 1.80 06/13/2025
135-5 (l) 13 11 H477 1(z) 1.83 06/13/2025
135-5 (l) 14 11 H477 2(b) 2.1 06/13/2025
135-5 (l)(2)a. 15 11 H477 1(n) 1.72 06/13/2025
135-5 (l)(2)b. 16 11 H477 1(o) 1.73 06/13/2025
135-5 (l)(2)c. 17 11 H477 1(p) 1.74 06/13/2025
135-5 (l)(3) 18 11 H477 1(q) 1.75 06/13/2025
135-5 (l)(4) 19 11 H477 1(r) 1.76 06/13/2025
135-5 (l1) 20 11 H477 1(x) 1.81 06/13/2025
135-5 (l1) 21 11 H477 1(y) 1.82 06/13/2025
135-5 (l1) 22 11 H477 1(aa) 1.84 06/13/2025
135-5 (m) 23 11 H477 9(a) 9 06/13/2025
135-5.1 (a)(4) 19 H476 5.1(e) 5.1 06/26/2025
135-5.3 19 H476 1.1 1.1 06/26/2025
135-5.6 (a) 19 H476 8(a) 8 06/26/2025
135-5.7 (b) 19 H476 8(b) 8 06/26/2025
135-6 01 25 H40 18(b) 18 06/26/2025
135-6 (e1) 02 11 H477 1(j1) 1.68 06/13/2025
135-7 25 H40 42.1 42.1 06/26/2025
135-7 (c) 01 6 H506 4.2(b) 4.2 01/01/2026
135-7 (g) 03 11 H477 1(c) 1.20 06/13/2025
135-7 (g) 03.5 11 H477 2(a) 2 06/13/2025
135-7 (g)(2) 04 11 H477 1(b) 1.10 06/13/2025
135-7 (g)(2) 04.5 11 H477 1(d) 1.30 06/13/2025
135-7 (g)(3) 05 11 H477 1(e) 1.40 06/13/2025
135-7 (g)(3) 06 11 H477 1(f) 1.50 06/13/2025
135-7 (g)(3) 07 11 H477 1(g) 1.60 06/13/2025
135-7 (h)(2) 08 19 H476 7.6(a) 7.6 06/26/2025
135-8 (f) 11 H477 11(a) 11 06/13/2025
135-9 25 H40 29(5) 29.5 06/26/2025
135-18.10A (c) 19 H476 2.1(a) 2.1 06/26/2025
135-27 (e)(3) 19 H476 5.1(f) 5.1 06/26/2025
135-48.1 (2a), (2c) 25 H40 17(b) 17 06/26/2025
135-48.30 (a)(20) 19 H476 7.8 7.8 06/26/2025
135-48.36 69 S479 10(a) 10 10/01/2025
135-48.40 (d)(10) 19 H476 7.5 7.5 06/26/2025
135-48.54 (b)(2) 19 H476 7.7 7.7 06/26/2025
135-52 (c) 11 H477 7(b) 7 06/13/2025
135-53 (3a) 11 H477 7(a) 7 06/13/2025
135-63 1 11 H477 7(d) 7 06/13/2025
135-63 (b), (d) 2 11 H477 7(c) 7 06/13/2025
135-64 1 11 H477 7(f) 7 06/13/2025
135-64 (f) - (j) 2 11 H477 7(e) 7 06/13/2025
135-75.1A (c) 19 H476 2.1(c) 2.1 06/26/2025
135-151 (d) 89 H125 3.6(d) 3.6 07/01/2025
135-153 Art. 8 11 H477 1(a) 1 06/13/2025
135-153 Art. 8 11 H477 3 3 06/13/2025
135-154 25 H40 29(1) 29.1 06/26/2025
135-154 1 11 H477 1(a) 1 06/13/2025
135-154 2 11 H477 3 3 06/13/2025
135-154 (a) 3 11 H477 1(b) 1.10 06/13/2025
135-154 (a) 4 11 H477 1(c) 1.20 06/13/2025
135-154 (b) 5 11 H477 1(d) 1.30 06/13/2025
135-154 (c) 6 11 H477 1(e) 1.40 06/13/2025
135-154 (c) 7 11 H477 1(f) 1.50 06/13/2025
135-154 (d) 8 11 H477 1(g) 1.60 06/13/2025
135-154 (e) 9 11 H477 16(a) 16 07/01/2025
135-155 1 11 H477 1(a) 1 06/13/2025
135-155 2 11 H477 3 3 06/13/2025
135-155 (a) 3 11 H477 1(h) 1.65 06/13/2025
135-155 (b) 4 11 H477 1(i) 1.66 06/13/2025
135-160 1 11 H477 1(a) 1 06/13/2025
135-160 2 11 H477 3 3 06/13/2025
135-160 (b) 3 11 H477 1(j1) 1.68 06/13/2025
135-160 (a) 4 11 H477 1(j) 1.67 06/13/2025
135-165 1 11 H477 1(a) 1 06/13/2025
135-165 2 11 H477 3 3 06/13/2025
135-165 (b) 3 11 H477 1(k) 1.69 06/13/2025
135-165 (c) 4 11 H477 1(l) 1.70 06/13/2025
135-165 (d) 5 11 H477 1(m) 1.71 06/13/2025
135-170 1 11 H477 1(a) 1 06/13/2025
135-170 2 11 H477 3 3 06/13/2025
135-170 (1) 3 11 H477 1(o) 1.73 06/13/2025
135-170 (2)a. 4 11 H477 1(p) 1.74 06/13/2025
135-170 (2)b. 5 11 H477 1(q) 1.75 06/13/2025
135-170 (2)c. 6 11 H477 1(r) 1.76 06/13/2025
135-170 (3) 7 11 H477 1(n) 1.72 06/13/2025
135-175 1 11 H477 1(a) 1 06/13/2025
135-175 2 11 H477 3 3 06/13/2025
135-175 (b) 3 11 H477 1(s) 1.77 06/13/2025
135-175 (c) 4 11 H477 1(t) 1.78 06/13/2025
135-180 1 11 H477 1(a) 1 06/13/2025
135-180 2 11 H477 3 3 06/13/2025
135-180 (a) 3 11 H477 1(u) 1.78 06/13/2025
135-180 (c) 4 11 H477 1(v) 1.79 06/13/2025
135-180 (d) 5 11 H477 1(w) 1.80 06/13/2025
135-185 11 H477 1(a) 1 06/13/2025
135-185 11 H477 3 3 06/13/2025
135-190 1 11 H477 1(a) 1 06/13/2025
135-190 2 11 H477 3 3 06/13/2025
135-190 (a) 3 11 H477 1(x) 1.81 06/13/2025
135-190 (b) 4 11 H477 1(y) 1.82 06/13/2025
135-195 11 H477 1(a) 1 06/13/2025
135-195 11 H477 1(z) 1.83 06/13/2025
135-195 11 H477 3 3 06/13/2025
135-200 11 H477 1(a) 1 06/13/2025
135-200 11 H477 1(aa) 1.84 06/13/2025
135-200 11 H477 3 3 06/13/2025
136-12 (a) 47 S391 10 10 07/01/2025
136-18 25 H40 29(3) 29.3 06/26/2025
136-18 (39a)a. 47 S391 16 16 07/01/2025
136-18.05 25 H40 29(5) 29.5 06/26/2025
136-19.7 25 H40 29(5) 29.5 06/26/2025
136-19.7 25 H40 29(6) 29.6 06/26/2025
136-27.1 65 S664 6(a) 6 01/01/2025
136-28.12 (a)(3) 47 S391 15(b) 15 07/01/2025
136-32 (b) 47 S391 15(a) 15 07/01/2025
136-44.18 47 S391 14(a) 14 07/01/2025
136-44.20 (b1) 39 H948 8.3 8.3 07/01/2025
136-44.27 (e), (f) 39 H948 8.4 8.4 07/01/2025
136-76.2 (c) 47 S391 8 8 07/01/2025
136-82 25 H40 29(3) 29.3 06/26/2025
136-89.183 (a)(2) 47 S391 6 6 07/01/2025
136-89.193 47 S391 4 4 07/01/2025
136-89.195 25 H40 29(5) 29.5 06/26/2025
136-89.214 25 H40 29(1) 29.1 06/26/2025
136-89.214 (a) 47 S391 5 5 07/01/2025
136-93.1A 25 H40 29(5) 29.5 06/26/2025
136-133.1 (e) 47 S391 20(a) 20 07/01/2025
136-189.11 25 H40 29(5) 29.5 06/26/2025
138A-3 25 H40 29(6) 29.6 06/26/2025
138A-3 (70) 67 H23 5.2 5.2 07/07/2025
138A-11 25 H40 29(5) 29.5 06/26/2025
138A-32 25 H40 29(5) 29.5 06/26/2025
138A-36 25 H40 29(6) 29.6 06/26/2025
140A-1 Chapter, title 1 25 H40 19(a) 19 06/26/2025
140A-1 Art. 1 2 25 H40 19(b) 19 06/26/2025
140A-2 25 H40 19(c) 19 06/26/2025
140A-5 25 H40 19(d) 19 06/26/2025
140A-6 25 H40 19(e) 19 06/26/2025
140A-15 Art. 2 1 25 H40 19(f) 19 06/26/2025
140A-15 2 25 H40 19(g) 19 06/26/2025
143-49.2 2 H47 5.4(a) 5.4 03/19/2025
143-53.1 25 H40 29(6) 29.6 06/26/2025
143-59 25 H40 29(3) 29.3 06/26/2025
143-63.1 25 H40 20 20 06/26/2025
143-64.8 Art. 3A, Part 4 2 H47 5.4(b) 5.4 03/19/2025
143-64.24 (10) 83 H549 1 1 07/29/2025
143-129 (h) 39 H948 8.5 8.5 07/01/2025
143-136 (a2) 63 H559 3(a) 3 07/07/2025
143-136.1 (b1) 63 H559 3(b) 3 07/07/2025
143-139.4A 25 H40 29(1) 29.1 06/26/2025
143-139.5C 25 H40 29(3) 29.3 06/26/2025
143-146 25 H40 29(6) 29.6 06/26/2025
143-151.15 25 H40 29(3) 29.3 06/26/2025
143-157.1 (d)(26) 39 H948 8.6 8.6 07/01/2025
143-162.5 25 H40 29(3) 29.3 06/26/2025
143-162.7 25 H40 29(1) 29 06/26/2025
143-162.8 H171 1.2(a) 1.2 07/01/2026 Vetoed
143-166.3 (a), (e) S50 1.9 1.9 12/01/2025 Vetoed
143-166.41 8 H50 1 1 07/01/2025
143-166.42 8 H50 2 2 07/01/2025
143-166.60 (b) 11 H477 12(a) 12 06/13/2025
143-166.70 (5) 11 H477 12(b) 12 06/13/2025
143-214.1A (a), (c), (d) 48 S472 1(a) 1 10/01/2025
143-214.1A (c), (d) 50 H768 3(a) 3 10/01/2025
143-214.7 (b)(6) 94 H926 20 20 10/06/2025
143-215.4 25 H40 29(6) 29.6 06/26/2025
143-215.13 25 H40 29(6) 29.6 06/26/2025
143-215.22C 25 H40 29(1) 29.1 06/26/2025
143-215.22G (1b) 77 H694 2(b) 2 07/09/2025
143-215.31 (a1)(6) 94 H926 19 19 10/06/2025
143-215.32 25 H40 29(5) 29.5 06/26/2025
143-215.32B 26 H1012 2E.1 2E.1 06/27/2025
143-215.54 (a) 18 H251 7(b) 7 06/26/2025
143-215.77A 25 H40 29(6) 29.6 06/26/2025
143-215.84 25 H40 29(1) 29.1 06/26/2025
143-215.85 25 H40 29(1) 29.1 06/26/2025
143-215.88B 25 H40 29(6) 29.6 06/26/2025
143-215.94A (2), (2a), (7) 25 H40 21(b) 21 06/26/2025
143-215.94A (5) 25 H40 21(a)(1) 21 06/26/2025
143-215.94B (b)(6), (12) 25 H40 21(a)(2) 21 06/26/2025
143-215.94E 25 H40 21(c) 21 06/26/2025
143-215.94F 25 H40 21(a)(3) 21 06/26/2025
143-215.94G 25 H40 21(d) 21 06/26/2025
143-215.94G 25 H40 24(l) 24 06/26/2025
143-215.94P 25 H40 21(a)(4) 21 06/26/2025
143-215.94V 25 H40 21(e) 21 06/26/2025
143-215.94W 25 H40 29(6) 29.6 06/26/2025
143-215.104D 25 H40 29(6) 29.6 06/26/2025
143-215.104P 25 H40 29(6) 29.6 06/26/2025
143-215.108 25 H40 29(5) 29.5 06/26/2025
143-215.110 25 H40 29(5) 29.5 06/26/2025
143-215.125 25 H40 29(6) 29.6 06/26/2025
143-254.5 25 H40 29(1) 29.1 06/26/2025
143-260.10 10 S477 8 8 06/13/2025
143-283.1 Art. 29A 25 H40 22 22 06/26/2025
143-283.2 25 H40 22 22 06/26/2025
143-283.3 25 H40 22 22 06/26/2025
143-283.8 25 H40 22 22 06/26/2025
143-293 25 H40 29(2) 29 06/26/2025
143-318.12 25 H40 29(1) 29.1 06/26/2025
143-318.12 25 H40 29(5) 29.5 06/26/2025
143-318.14A 25 H40 29(1) 29.1 06/26/2025
143-318.14A 25 H40 29(5) 29.5 06/26/2025
143-355.5 25 H40 29(6) 29.6 06/26/2025
143-406 10 S477 7(b) 7.1 06/13/2025
143-509 (9) 27 H576 3.5 3.5 06/27/2025
143A-6 25 H40 29(6) 29.6 06/26/2025
143A-13 25 H40 19(h) 19 06/26/2025
143B-17 25 H40 29(6) 29.6 06/26/2025
143B-53.15 10 S477 6(a) 6.0 06/13/2025
143B-84 25 H40 19(i) 19 06/26/2025
143B-94 10 S477 5(b) 5.1 06/13/2025
143B-135.242 25 H40 29(6) 29.6 06/26/2025
143B-135.275 10 S477 1(a) 1 06/13/2025
143B-139.5 25 H40 28(b) 28 01/01/2023
143B-147 25 H40 29(6) 29.6 06/26/2025
143B-148 25 H40 29(6) 29.6 06/26/2025
143B-165 25 H40 29(6) 29.6 06/26/2025
143B-168.12 (b) 83 H549 7 7 07/29/2025
143B-181.16 25 H40 38(b) 38 06/26/2025
143B-218 83 H549 12(a) 12 12/01/2025
143B-245.12 25 H40 29(1) 29.1 06/26/2025
143B-283 97 S449 4.3(a) 4.3 07/01/2025
143B-289.52 25 H40 29(1) 29.1 06/26/2025
143B-289.54 25 H40 29(1) 29.1 06/26/2025
143B-426.40A 83 H549 8 8 07/29/2025
143B-426.40A (l) 25 H40 21(f) 21 06/26/2025
143B-431.01 25 H40 29(5) 29.5 06/26/2025
143B-435.1 25 H40 29(5) 29.5 06/26/2025
143B-437.01 25 H40 29(3) 29.3 06/26/2025
143B-437.02 25 H40 29(5) 29.5 06/26/2025
143B-437.02A 25 H40 29(5) 29.5 06/26/2025
143B-437.07 25 H40 29(5) 29.5 06/26/2025
143B-437.012 25 H40 29(5) 29.5 06/26/2025
143B-437.012 (d), (j), (k) 65 S664 1 1 07/07/2025
143B-437.020 25 H40 29(5) 29.5 06/26/2025
143B-437.7 25 H40 29(5) 29.5 06/26/2025
143B-437.54 25 H40 29(5) 29.5 06/26/2025
143B-437.73 25 H40 29(5) 29.5 06/26/2025
143B-437.82 25 H40 29(5) 29.5 06/26/2025
143B-437.101 25 H40 29(5) 29.5 06/26/2025
143B-602 25 H40 29(6) 29.6 06/26/2025
143B-801 25 H40 29(6) 29.6 06/26/2025
143B-1010 Art. 13, Part 5, Subpt. B 4 H74 5.1(c) 5.1 05/14/2025
143B-1011 4 H74 5.1(c) 5.1 05/14/2025
143B-1012 4 H74 5.1(c) 5.1 05/14/2025
143B-1013 4 H74 5.1(c) 5.1 05/14/2025
143B-1014 4 H74 5.1(c) 5.1 05/14/2025
143B-1015 4 H74 5.1(c) 5.1 05/14/2025
143B-1016 4 H74 5.1(c) 5.1 05/14/2025
143B-1017 4 H74 5.1(c) 5.1 05/14/2025
143B-1018 4 H74 5.1(c) 5.1 05/14/2025
143B-1019 4 H74 5.1(c) 5.1 05/14/2025
143B-1020 4 H74 5.1(c) 5.1 05/14/2025
143B-1021 4 H74 5.1(c) 5.1 05/14/2025
143B-1022 4 H74 5.1(c) 5.1 05/14/2025
143B-1023 4 H74 5.1(c) 5.1 05/14/2025
143B-1040 Art. 13, Part 5, Subpart D 2 H47 2B.1(a) 2.5 10/01/2026
143B-1041 2 H47 2B.1(a) 2.5 10/01/2026
143B-1208.5 25 H40 29(1) 29.1 06/26/2025
143B-1208.5 25 H40 29(3) 29.3 06/26/2025
143B-1208.15 25 H40 39.5 39.5 06/26/2025
143B-1209.09 97 S449 5.7(a) 5.7 10/22/2025
143B-1209.58 25 H40 39.5 39.5 06/26/2025
143B-1224 (2) 20 H91 1.5 1.5 06/26/2025
143B-1278 72 S118 4(b) 4 10/01/2025
143B-1311 (b)(1)h. 20 H91 2.9 2.9 06/26/2025
143B-1320 25 H40 39.7 39.7 06/26/2025
143B-1320 (a)(17), (b) 62 S133 2 2 07/01/2025
143B-1320 (b) 83 H549 2 2 07/01/2025
143B-1320 (b) 89 H125 4.1(a) 4.1 07/01/2025
143B-1320 (b) 89 H125 4.1(a1) 4.1 07/01/2025
143B-1320 (b) 97 S449 7.2(a) 7.2 10/22/2025
143B-1321 25 H40 29(5) 29.5 06/26/2025
143B-1325 (c)(13) 89 H125 4.1(c) 4.1 07/01/2025
143B-1332 25 H40 29(1) 29.1 06/26/2025
143B-1341 25 H40 29(5) 29.5 06/26/2025
143B-1350 (a), (l) 83 H549 3 3 07/29/2025
143B-1372 25 H40 29(5) 29.5 06/26/2025
143B-1373 25 H40 29(3) 29.3 06/26/2025
143B-1373 25 H40 29(5) 29.5 06/26/2025
143B-1373.2 89 H125 4.3(a) 4.3 07/01/2025
143B-1373.2 25 H40 29(3) 29.3 06/26/2025
143B-1374 89 H125 4.3(b) 4.3 07/01/2025
143B-1374 25 H40 29(3) 29.3 06/26/2025
143B-1400 25 H40 29(4) 29 06/26/2025
143B-1403 25 H40 29(5) 29.5 06/26/2025
143B-1410 83 H549 9 9 07/29/2025
143B-1420 25 H40 29(3) 29.3 06/26/2025
143B-1491 (e) 19 H476 5.1(g) 5.1 06/26/2025
143B-1710 25 H40 29(6) 29.6 06/26/2025
143B-1760 Art. 17, Part 4 4 H74 5.1(b) 5.1 05/14/2025
143B-1760 Art. 17, Part 4 4 H74 5.1(c) 5.1 05/14/2025
143B-1760 Art. 17, Part 4 4 H74 5.1(d) 5.1 05/14/2025
143B-1761 4 H74 5.1(c) 5.1 05/14/2025
143B-1762 4 H74 5.1(d) 5.1 05/14/2025
143B-1762 4 H74 5.1(c) 5.1 05/14/2025
143B-1763 4 H74 5.1(c) 5.1 05/14/2025
143B-1763 4 H74 5.1(d) 5.1 05/14/2025
143B-1764 4 H74 5.1(c) 5.1 05/14/2025
143B-1765 4 H74 5.1(c) 5.1 05/14/2025
143B-1765 4 H74 5.1(d) 5.1 05/14/2025
143B-1766 4 H74 5.1(c) 5.1 05/14/2025
143B-1766 (9), (13) 4 H74 5.1(d) 5.1 05/14/2025
143B-1767 4 H74 5.1(c) 5.1 05/14/2025
143B-1768 4 H74 5.1(c) 5.1 05/14/2025
143B-1768 (4), (5) 4 H74 5.1(d) 5.1 05/14/2025
143B-1769 4 H74 5.1(c) 5.1 05/14/2025
143B-1769 4 H74 5.1(d) 5.1 05/14/2025
143B-1770 4 H74 5.1(c) 5.1 05/14/2025
143B-1770 4 H74 5.1(d) 5.1 05/14/2025
143B-1771 4 H74 5.1(c) 5.1 05/14/2025
143B-1771 (b), (f) 4 H74 5.1(d) 5.1 05/14/2025
143B-1772 4 H74 5.1(c) 5.1 05/14/2025
143B-1772 4 H74 5.1(d) 5.1 05/14/2025
143B-1773 4 H74 5.1(c) 5.1 05/14/2025
143B-1773 (c) 4 H74 5.1(d) 5.1 05/14/2025
143B-1774 4 H74 5.1(d) 5.1 05/14/2025
143B-1775 4 H74 5.1(d) 5.1 05/14/2025
143B-1776 4 H74 5.1(d) 5.1 05/14/2025
143C-1-3 (e) 6 H506 4.3(a) 4.3 07/01/2025
143C-2-5 25 H40 29(5) 29.5 06/26/2025
143C-2-6 25 H40 29(5) 29.5 06/26/2025
143C-6-5.6 (b1), (c) 84 H805 3(a) 3 07/01/2025
143C-6-11 25 H40 29(5) 29.5 06/26/2025
143C-6-11 (f), (k) 47 S391 3 3 07/01/2025
143C-9-10 (b) 89 H125 2B.12(c) 2 07/01/2025
143C-10-1 (c) H171 1.3(a) 1.3 12/01/2025 Vetoed
143C-10-2 H171 1.3(a) 1.3 12/01/2025 Vetoed
143C-10-3 H171 1.3(a) 1.3 12/01/2025 Vetoed
144-7 (a) 94 H926 12(a) 12 10/06/2025
144-9 (b) 25 H40 23 23 06/26/2025
147-12 (a)(15) 25 H40 19(g) 19 06/26/2025
147-64.4 (5) 83 H549 4 4 07/29/2025
147-64.6 25 H40 29(5) 29.5 06/26/2025
147-64.6 (c)(21) 83 H549 10 10 12/01/2025
147-64.6 (c)(24) 83 H549 10 10 12/01/2025
147-64.6B 25 H40 29(1) 29.1 06/26/2025
147-64.6B 25 H40 29(3) 29.3 06/26/2025
147-64.6B 25 H40 29(5) 29.5 06/26/2025
147-64.6B (b) 83 H549 5 5 07/29/2025
147-64.7 (a), (a1) 83 H549 6 6 07/29/2025
147-65 Art. 6, Part 1 1 6 H506 1.1(1) 1.1 06/13/2025
147-65 2 6 H506 1.2(a) 1.2 06/13/2025
147-65.1 6 H506 2.1 2.1 07/01/2025
147-65.2 1 6 H506 1.2(a) 1.2 06/13/2025
147-65.2 2 6 H506 4.1(a) 4.1 07/01/2025
147-65.2 (b) 3 6 H506 1.3 1.3 06/13/2025
147-66 6 H506 1.1(1) 1.1 06/13/2025
147-66 6 H506 1.2(a1) 1.2 06/13/2025
147-66.2 6 H506 1.2(i) 1.2 06/13/2025
147-67 6 H506 1.1(1) 1.1 06/13/2025
147-67.1 6 H506 1.2(b) 1.2 06/13/2025
147-68 6 H506 1.1(1) 1.1 06/13/2025
147-68.3 6 H506 1.2(e) 1.2 06/13/2025
147-68.4 6 H506 1.2(f) 1.2 06/13/2025
147-68.5 6 H506 1.2(j) 1.2 06/13/2025
147-68.6 6 H506 1.2(k) 1.2 06/13/2025
147-69 6 H506 1.1(1) 1.1 06/13/2025
147-69.1 Art. 6, Part 2 1 6 H506 1.1(2) 1.1 06/13/2025
147-69.1 Art. 6, Part 2 2 6 H506 3.1(a) 3.1 01/01/2026
147-69.2 6 H506 1.1(2) 1.1 06/13/2025
147-69.2 6 H506 3.1(a) 3.1 01/01/2026
147-69.2A 6 H506 3.1(a) 3.1 01/01/2026
147-69.3 6 H506 1.1(2) 1.1 06/13/2025
147-69.3 6 H506 3.1(a) 3.1 01/01/2026
147-69.3 (i2) 6 H506 1.3 1.3 06/13/2025
147-69.3A 6 H506 1.2(b) 1.2 06/13/2025
147-69.4 6 H506 1.1(2) 1.1 06/13/2025
147-69.4A 6 H506 3.1(a) 3.1 01/01/2026
147-69.5 6 H506 1.1(2) 1.1 06/13/2025
147-69.5 6 H506 3.1(a) 3.1 01/01/2026
147-69.6 6 H506 3.1(a) 3.1 01/01/2026
147-69.7 6 H506 1.1(2) 1.1 06/13/2025
147-69.7 6 H506 1.2(d) 1.2 06/13/2025
147-69.8 Art. 6, Part 3 6 H506 1.1(3) 1.1 06/13/2025
147-69.8 Art.6, Part 3 6 H506 3.1(b) 3.1 01/01/2026
147-69.9 6 H506 1.1(3) 1.1 06/13/2025
147-69.9 6 H506 3.1(b) 3.1 01/01/2026
147-69.10 6 H506 1.1(3) 1.1 06/13/2025
147-69.10 6 H506 3.1(b) 3.1 01/01/2026
147-69.11 6 H506 1.1(3) 1.1 06/13/2025
147-69.11 6 H506 1.2(c) 1.2 06/13/2025
147-69.12 6 H506 1.1(3) 1.1 06/13/2025
147-69.12 6 H506 3.1(b) 3.1 01/01/2026
147-69.12 25 H40 29(5) 29.5 06/26/2025
147-69.70 6 H506 1.1(3) 1.1 06/13/2025
147-70 6 H506 1.2(e) 1.2 06/13/2025
147-70.1 Art. 6, Part 4 1 6 H506 1.1(4) 1.1 06/13/2025
147-70.1 Art. 6, Part 4 2 6 H506 2.2 2.2 07/01/2025
147-70.2 6 H506 1.1(4) 1.1 06/13/2025
147-70.2 6 H506 2.2 2.2 07/01/2025
147-70.3 6 H506 1.1(4) 1.1 06/13/2025
147-70.3 6 H506 2.2 2.2 07/01/2025
147-70.4 6 H506 1.1(4) 1.1 06/13/2025
147-70.4 6 H506 2.2 2.2 07/01/2025
147-70.5 6 H506 1.1(4) 1.1 06/13/2025
147-70.5 6 H506 2.2 2.2 07/01/2025
147-70.6 6 H506 1.2(d) 1.2 06/13/2025
147-70.6 6 H506 3.1(c) 3.1 01/01/2026
147-71 6 H506 1.2(f) 1.2 06/13/2025
147-71.1 6 H506 1.1(4) 1.1 06/13/2025
147-71.1 6 H506 2.2 2.2 07/01/2025
147-71.2 6 H506 1.1(4) 1.1 06/13/2025
147-71.2 6 H506 2.2 2.2 07/01/2025
147-71.2 (a) 6 H506 3.1(d) 3.1 01/01/2026
147-71.3 6 H506 1.1(4) 1.1 06/13/2025
147-71.3 6 H506 2.2 2.2 07/01/2025
147-72 6 H506 1.2(g) 1.2 06/13/2025
147-72.1 6 H506 1.1(4) 1.1 06/13/2025
147-72.1 6 H506 2.2 2.2 07/01/2025
147-72.1 (e) 6 H506 3.1(e) 3.1 01/01/2026
147-73 6 H506 1.2(h) 1.2 06/13/2025
147-73.2 6 H506 1.1(4) 1.1 06/13/2025
147-73.2 6 H506 1.2(c) 1.2 06/13/2025
147-73.2 6 H506 2.2 2.2 07/01/2025
147-74 Art. 6, Part 5 6 H506 1.1(5) 1.1 06/13/2025
147-75 6 H506 1.1(5) 1.1 06/13/2025
147-75 6 H506 1.2(i) 1.2 06/13/2025
147-75.1 6 H506 1.2(j) 1.2 06/13/2025
147-76 6 H506 1.1(5) 1.1 06/13/2025
147-76.1 6 H506 1.1(5) 1.1 06/13/2025
147-77 6 H506 1.1(5) 1.1 06/13/2025
147-78 6 H506 1.1(5) 1.1 06/13/2025
147-78.1 6 H506 1.1(5) 1.1 06/13/2025
147-79 6 H506 1.1(5) 1.1 06/13/2025
147-80 6 H506 1.1(5) 1.1 06/13/2025
147-81 6 H506 1.1(5) 1.1 06/13/2025
147-82 6 H506 1.1(5) 1.1 06/13/2025
147-83 6 H506 1.1(5) 1.1 06/13/2025
147-84 6 H506 1.1(5) 1.1 06/13/2025
147-85 6 H506 1.1(5) 1.1 06/13/2025
147-86 6 H506 1.1(5) 1.1 06/13/2025
147-86.1 6 H506 1.1(5) 1.1 06/13/2025
147-86.2 6 H506 1.1(6) 1.1 06/13/2025
147-86.2 6 H506 1.2(k) 1.2 06/13/2025
147-86.73 (e), (g1) 19 H476 4.1(a) 4.1 06/26/2025
148-5.5 70 S429 22 22 07/09/2025
148-19.3 25 H40 29(1) 29.1 06/26/2025
148-65.5 25 H40 29(6) 29.6 06/26/2025
150B-1 25 H40 40 40 06/26/2025
150B-1 25 H40 29(5) 29.5 06/26/2025
150B-1 25 H40 29(6) 29.6 06/26/2025
150B-1 (d)(27a) 10 S477 2 2 06/13/2025
150B-1 (d)(35) 93 H307 6.5(f) 6.5 10/03/2025
150B-2 (8a)i. 34 S124 11 11 07/01/2025
150B-19.1 25 H40 29(6) 29.6 06/26/2025
150B-19.4 82 H402 3 3 07/29/2025
150B-20 25 H40 29(5) 29.5 06/26/2025
150B-20 25 H40 29(6) 29.6 06/26/2025
150B-21 25 H40 29(6) 29.6 06/26/2025
150B-21.1 25 H40 29(3) 29.3 06/26/2025
150B-21.1 25 H40 29(6) 29.6 06/26/2025
150B-21.1A 25 H40 29(3) 29.3 06/26/2025
150B-21.1A 25 H40 29(6) 29.6 06/26/2025
150B-21.3 25 H40 29(5) 29.5 06/26/2025
150B-21.3 (b), (b2), (b3) 82 H402 1 1 07/29/2025
150B-21.3A 25 H40 29(5) 29.5 06/26/2025
150B-21.3A 25 H40 29(6) 29.6 06/26/2025
150B-21.4 (b1) 82 H402 2 2 07/29/2025
150B-21.5 25 H40 29(5) 29.5 06/26/2025
150B-21.5 25 H40 29(6) 29.6 06/26/2025
150B-21.5 (c1) 28 H568 1.2 1.2 06/27/2025
150B-21.6 25 H40 29(6) 29.6 06/26/2025
150B-21.19 25 H40 29(6) 29.6 06/26/2025
150B-21.20 25 H40 29(5) 29.5 06/26/2025
150B-21.24 25 H40 29(3) 29.3 06/26/2025
150B-22 25 H40 29(6) 29.6 06/26/2025
150B-22 (c) 94 H926 15 15 10/06/2025
150B-23 (b) 94 H926 14(a) 14 10/06/2025
150B-23.3 25 H40 29(3) 29.3 06/26/2025
150B-34 (a) 1 25 H40 24(a) 24 06/26/2025
150B-34 (a), (d) 2 25 H40 24(b) 24 06/26/2025
150B-37 (c) 25 H40 24(a) 24 06/26/2025
150B-38 94 H926 14(b) 14 10/06/2025
150B-43 25 H40 29(6) 29.6 06/26/2025
153A-22.1 (f) Local Modification 3 H58 3(c) 3 12/07/2026
153A-27.1 (h) 3 H58 4(a) 4 03/27/2025
153A-27.1 (h) 13 H3 1(a) 1 12/04/2028
153A-77 25 H40 29(6) 29.6 06/26/2025
153A-82 (a)(9) 19 H476 6.1(a) 6.1 06/26/2025
153A-93 25 H40 18(c) 18 06/26/2025
153A-94.2 16 H612 4.1 4.1 10/01/2025
153A-145.5 catch line, (c) S153 5(a) 5 * Vetoed
153A-148.1 (a)(4) 39 H948 8.7 8.7 07/01/2025
153A-225.2 25 H40 29(5) 29.5 06/26/2025
153A-246.1 47 S391 13(b) 13 10/01/2025
153A-435.1 S153 5(b) 5.1 * Vetoed
153A-459 25 H40 29(3) 29.3 06/26/2025
153A-464 25 H40 29(1) 29.1 06/26/2025
159-25 (d), (e) 19 H476 6.1(b) 6.1 06/26/2025
159-48 (e) 39 H948 8.8 8.8 07/01/2025
159-81 (1) 39 H948 8.9 8.9 07/01/2025
159-182 H171 1.3(b) 1.3 12/01/2025 Vetoed
159-183 H171 1.3(c) 1.3 12/01/2025 Vetoed
159B-5 94 H926 22(a) 22 10/06/2025
159B-11 (a)(12) 94 H926 22(b) 22 10/06/2025
159B-12 94 H926 22(c) 22 10/06/2025
160A-20 (h)(11) 39 H948 8.10 8.10 07/01/2025
160A-58.1 (b)(5) 14 H26 1 1 06/25/2025
160A-58.55 25 H40 29(5) 29.5 06/26/2025
160A-148 (a)(9)a., b. 19 H476 6.1(c) 6.1 06/26/2025
160A-163 25 H40 18(d) 18 06/26/2025
160A-164.2 16 H612 4.2 4.2 10/01/2025
160A-205.2 catch line, (c) S153 5(c) 5.2 * Vetoed
160A-272 (a), (b1) Local Modification 30 H173 4(a) 4 06/30/2025
160A-300.4 47 S391 13(a) 13 10/01/2025
160A-340 25 H40 29(3) 29.3 06/26/2025
160A-340.2 25 H40 29(3) 29.3 06/26/2025
160A-340.3 25 H40 29(5) 29.5 06/26/2025
160A-340.6 25 H40 29(5) 29.5 06/26/2025
160A-485.1 S153 5(d) 5.3 * Vetoed
160A-499.9 25 H40 29(1) 29.1 06/26/2025
160A-702 (c)(4), (d) 94 H926 4(a) 4 01/01/2026
160A-900 Art. 34 39 H948 5.1 5.1 07/01/2025
160A-901 39 H948 5.1 5.1 07/01/2025
160A-902 39 H948 5.1 5.1 07/01/2025
160A-903 39 H948 5.1 5.1 07/01/2025
160A-904 39 H948 5.1 5.1 07/01/2025
160A-905 39 H948 5.1 5.1 07/01/2025
160A-906 39 H948 5.1 5.1 07/01/2025
160A-907 39 H948 5.1 5.1 07/01/2025
160A-908 39 H948 5.1 5.1 07/01/2025
160A-909 39 H948 5.1 5.1 07/01/2025
160A-910 39 H948 5.1 5.1 07/01/2025
160A-911 39 H948 5.1 5.1 07/01/2025
160A-912 39 H948 5.1 5.1 07/01/2025
160A-913 39 H948 5.1 5.1 07/01/2025
160A-914 39 H948 5.1 5.1 07/01/2025
160A-915 39 H948 5.1 5.1 07/01/2025
160A-916 39 H948 5.1 5.1 07/01/2025
160A-917 39 H948 5.1 5.1 07/01/2025
160A-918 39 H948 5.1 5.1 07/01/2025
160A-919 39 H948 5.1 5.1 07/01/2025
160A-920 39 H948 5.1 5.1 07/01/2025
160A-921 39 H948 5.1 5.1 07/01/2025
160A-922 39 H948 5.1 5.1 07/01/2025
160A-923 39 H948 5.1 5.1 07/01/2025
160A-924 39 H948 5.1 5.1 07/01/2025
160A-925 39 H948 5.1 5.1 07/01/2025
160A-926 39 H948 5.1 5.1 07/01/2025
160D-102 (18) 94 H926 29(d) 29 10/06/2025
160D-107 Local Modification 30 H173 3(a) 3 06/30/2025
160D-108 (c) 94 H926 29(a) 29 10/06/2025
160D-110 25 H40 29(1) 29.1 06/26/2025
160D-203 94 H926 29(c) 29 10/06/2025
160D-308 25 H40 29(5) 29.5 06/26/2025
160D-406 25 H40 29(1) 29.1 06/26/2025
160D-601 (c) 94 H926 11 11 10/06/2025
160D-602 (f) Local Modification 32 H309 3.5(a) 3.5 06/30/2025
160D-705 (c) 94 H926 29(b) 29 10/06/2025
160D-805 25 H40 29(1) 29.1 06/26/2025
160D-805 25 H40 29(5) 29.5 06/26/2025
160D-913 (b) 94 H926 18 18 10/06/2025
160D-1104 25 H40 29(1) 29.1 06/26/2025
160D-1104 (d2) 94 H926 3 3 10/06/2025
160D-1311 25 H40 25 25 06/26/2025
160D-1403.1 25 H40 29(1) 29.1 06/26/2025
162-9 25 H40 29(1) 29.1 06/26/2025
162-62 85 H318 1 1 10/01/2025
162A-9 25 H40 29(5) 29.5 06/26/2025
162A-132.1C 25 H40 29(5) 29.5 06/26/2025
162A-209 25 H40 29(5) 29.5 06/26/2025
163-82.10 25 H40 29(1) 29.1 06/26/2025
163-82.26 25 H40 29(6) 29.6 06/26/2025
163-129 25 H40 40.1 40.1 06/26/2025
163-165.7 25 H40 29(3) 29.3 06/26/2025
163-166.17 25 H40 29(5) 29.5 06/26/2025
163-166.18 25 H40 29(5) 29.5 06/26/2025
163-201 (a) 95 S249 1 1 10/22/2025
163-230.2 25 H40 29(1) 29.1 06/26/2025
163-230.3 25 H40 29(5) 29.5 06/26/2025
163-258.2 (6)a., (7)a. 20 H91 2.10 2.10 06/26/2025
163-258.9 25 H40 29(1) 29.1 06/26/2025
163-258.9 25 H40 29(3) 29.3 06/26/2025
163-258.14 25 H40 29(1) 29.1 06/26/2025
163-258.14 25 H40 29(3) 29.3 06/26/2025
163-258.15 25 H40 29(1) 29.1 06/26/2025
163-258.16 25 H40 29(1) 29.1 06/26/2025
163-258.16 25 H40 29(5) 29.5 06/26/2025
163-274 25 H40 29(1) 29.1 06/26/2025
163-275 (11) 81 H193 5 5 12/01/2025
163-278.8B (b), (c), (d) 25 H40 40.2 40.2 06/26/2025
163-278.14A 25 H40 29(3) 29.3 06/26/2025
166A-19.4 18 H251 2(a) 2 12/01/2025
166A-19.14A 25 H40 29(1) 29.1 06/26/2025
166A-19.31 25 H40 29(5) 29.5 06/26/2025
166A-19.40 (c) 26 H1012 3.4 3.4 06/27/2025
166A-19.41 (e) 18 H251 3 2 06/26/2025
166A-19.70A 25 H40 29(3) 29.3 06/26/2025
168-11 25 H40 26 26 06/26/2025
1885-136 s. 3 PR 3 H58 1(a) 1 03/27/2025
1891-281 PR 14 H26 5(e)(1) 5 06/25/2025
1903-110 s. 2 PR 13 H3 3.2(a) 3 06/25/2025
1903-363 s. 3 1 PR 5 H17 2(b) 2 06/04/2025
1903-363 s. 4 2 PR 5 H17 2(a) 2 06/04/2025
1911-279 PR 32 H309 2.1(d)(1) 2.1 06/30/2025
1913-273 PR 32 H309 2.1(d)(2) 2.1 06/30/2025
1935-106 PR 14 H26 5(e)(2) 5 06/25/2025
1939-168 s. 7(c) - (f) P-L 30 H173 6.1 6.1 06/30/2025
1951-1188 32 H309 2.1(d)(3) 2.1 06/30/2025
1953-717 32 H309 4.1(e)(1) 4.1 06/30/2025
1957-35 s. 1 1 3 H58 2.2(b) 2.3 03/27/2025
1957-35 s. 2 2 3 H58 2.2(a) 2.2 03/27/2025
1957-35 ss. 3-7 3 3 H58 2.2(b) 2.3 03/27/2025
1957-36 14 H26 5(e)(3) 5 06/25/2025
1957-668 32 H309 2.1(d)(4) 2.1 06/30/2025
1961-114 s. 1 32 H309 4.1(e)(2) 4.1 06/30/2025
1961-327 32 H309 4.1(e)(3) 4.1 06/30/2025
1961-754 32 H309 4.1(e)(4) 4.1 06/30/2025
1961-1022 s. 18 15 H183 2(a) 2 06/26/2025
1961-1022 s. 19 15 H183 2(b) 2 06/26/2025
1963-96 s. 1 13 H3 2(a) 2 06/25/2025
1963-295 32 H309 4.1(e)(5) 4.1 06/30/2025
1963-707 0 3 H58 4.1 4.1 03/27/2025
1963-707 s. 4(a) 1 32 H309 4.3(a) 4.3 06/30/2025
1963-707 s. 4(b) - (f), (h) - (j) 2 32 H309 4.3(d) 4.3 06/30/2025
1963-707 s. 4(g) 3 32 H309 4.3(b) 4.3 06/30/2025
1963-707 s. 4(k) 4 32 H309 4.3(c) 4.3 06/30/2025
1965-760 s. 14 13 H3 3(b) 3 06/25/2025
1965-760 s. 15 13 H3 3(c) 3 06/25/2025
1965-760 s. 8 13 H3 3(a) 3 06/25/2025
1965-760 ss. 16 - 19 13 H3 3(d) 3 06/25/2025
1965-988 s. 23 32 H309 1.1 1.1 06/30/2025
1969-385 s. 4 13 H3 3.7(a) 3 06/25/2025
1969-1053 s. 1 32 H309 4.1(e)(6) 4.1 06/30/2025
1969-1089 67 H23 5.1(b) 5.1 07/07/2025
1971-626 s. 3.4 13 H3 3.4(a) 3 06/25/2025
1971-626 s. 4.1 13 H3 3.4(b) 3 06/25/2025
1971-626 s. 4.2 13 H3 3.4(c) 3 06/25/2025
1971-626 s. 4.3 13 H3 3.4(d) 3 06/25/2025
1971-890 s. 3 13 H3 3.5(a) 3 06/25/2025
1973-289 s. 3.3(a) 5 H17 1(a) 1 06/04/2025
1975-239 s. 11.4 32 H309 2.4 2.4 06/30/2025
1977-633 s. 2 32 H309 4.2(a) 4.2 06/30/2025
1977-633 s. 3 32 H309 4.2(b) 4.2 06/30/2025
1977-633 s. 4 32 H309 4.2(c) 4.2 06/30/2025
1977-633 s. 7 32 H309 4.2(d) 4.2 06/30/2025
1981-192 s. 3 32 H309 4.1(e)(7) 4.1 06/30/2025
1983-134 32 H309 3.2(a) 3.2 06/30/2025
1983-234 s. 2 32 H309 4.1(e)(8) 4.1 06/30/2025
1983-601 s. 4 25 H40 41 41 06/26/2025
1987-193 s. 1 13 H3 2.1(a) 2.1 12/07/2026
1987-193 s. 4 13 H3 2.1(b) 2.1 12/07/2026
1987-193 s. 6 13 H3 2.1(c) 2.1 12/07/2026
1989-867 30 H173 4(c) 4 06/30/2025
1991-615 s. 13.8 32 H309 2.5 2.5 06/30/2025
1993-411 14 H26 5(f)(1) 5 06/25/2025
1997-32 s. 1 32 H309 4.4(a) 4.4 06/30/2025
1997-32 s. 3 32 H309 4.4(b) 4.4 06/30/2025
1997-32 s. 4 32 H309 4.4(c) 4.4 06/30/2025
1997-417 s. 3.1 39 H948 3.1 3.1 See Bill
1997-420 14 H26 5(f)(2) 5 06/25/2025
1997-446 s. 4-1 13 H3 3.3(b) 3 06/25/2025
1997-446 s. 4-2 13 H3 3.3(c) 3 06/25/2025
1997-446 ss. 3-3, 3-4 13 H3 3.3(a) 3 06/25/2025
1999-85 14 H26 5(f)(3) 5 06/25/2025
2000-35 s. 3.1 13 H3 5(a) 5 See Bill
2002-42 ss. 3.1, 3.2, 3.3 5 H17 3(a) 3 06/04/2025
2013-357 s. 5 25 H40 7(a) 7 06/26/2025
2014-115 s. 62(b) 83 H549 8 8 07/29/2025
2015-241 s. 10.13 1 56 S125 2.5(e)(1) 2.5 07/03/2025
2015-241 s. 14.11(g) 2 10 S477 6(b) 6.1 06/13/2025
2015-281 s. 12, intro 25 H40 7(c) 7 01/01/2016
2016-94 s. 10.5 56 S125 2.5(e)(2) 2.5 07/03/2025
2016-94 s. 12F.3 89 H125 2B.3(a) 2 07/01/2025
2017-57 s. 9.15 67 H23 1 1 07/07/2025
2018-5 s. 9.4 56 S125 2.5(e)(3) 2.5 07/03/2025
2020-3 s. 4.15(c) 70 S429 22 22 07/09/2025
2020-4 s. 4.2 92 H358 1C.1 1 09/30/2025
2020-18 s. 15 77 H694 3 3 07/09/2025
2021-180 s. 8.10(i) 1 4 H74 2.3(c) 2.3 05/14/2025
2021-180 s. 8.18(c) 2 4 H74 2.4 2.4 05/14/2025
2021-180 s. 9A.3A(a) 3 25 H40 28(a) 28 01/01/2023
2021-180 s. 9A.3A(d) 4 25 H40 28(b) 28 01/01/2023
2021-180 s. 9D.13(c) 5 64 H546 5.1(a) 5.1 07/07/2025
2021-180 s. 9D.19A 6 69 S479 11(a) 11 07/09/2025
2021-180 s. 19C.10(a) 7 2 H47 5.3(b) 5.3 03/19/2025
2021-180 s. 38.10 8 89 H125 4.2(a) 4.2 08/06/2025
2021-180 s. 38.15 9 89 H125 4.3(g) 4.3 07/01/2025
2021-180 s. 40.17(a)(18), (82) 9.5 4 H74 7.1(b) 7.1 05/14/2025
2022-74 s. 9A.1(a) 1 25 H40 27(a) 27 01/01/2023
2022-74 s. 9A.1(d) 2 25 H40 28(c) 28 01/01/2023
2022-74 s. 11.11 3 4 H74 4.2 4.2 05/14/2025
2022-74 s. 11.11(a) 4 65 S664 8 8 07/07/2025
2023-7 s. 1.6(d) 89 H125 2B.12(d) 2 07/01/2025
2023-7 s. 1.8(a) 1 27 H576 2.1 2.1 06/27/2025
2023-7 s. 2.4 2 64 H546 2.1(a) 2.1 07/07/2025
2023-93 s. 2(a) 51 S710 7 7 07/02/2025
2023-133 s. 16(j) 45 H737 11 11 07/01/2025
2023-134 s. 6.9(b) 1 56 S125 2(r) 2 07/03/2025
2023-134 s. 7.28(b) 2 89 H125 2A.10 2 07/01/2025
2023-134 s. 7.36(l) 3 56 S125 4(a) 4 06/30/2025
2023-134 s. 7.58 4 89 H125 2A.8(b) 2 07/01/2025
2023-134 s. 7.69 5 89 H125 2A.9 2 07/01/2025
2023-134 s. 9E.22(a) 6 64 H546 4.1(a) 4.1 07/07/2025
2023-134 s. 11.12 7 4 H74 4.3(b) 4.3 05/14/2025
2023-134 s. 14.10(f) 8 97 S449 6.5(a) 6.5 10/22/2025
2023-134 s. 27.11 9 4 H74 6.4 6.4 05/14/2025
2023-134 s. 38.4 9.1 89 H125 4.1(b) 4.1 07/01/2025
2023-134 s. 40.1(l) 9.2 4 H74 7.3 7.3 05/14/2025
2023-134 s. 40.8(a)(4) 9.3 4 H74 7.1(a) 7.1 05/14/2025
2023-134 s. 40.8(a)(6) 9.4 89 H125 5.2(a) 5.2 07/01/2025
2023-134 s. 41.7(3) 9.5 4 H74 8.1 8.1 05/14/2025
2024-1 s. 6.1(a)(2), (37) 1 4 H74 6.1 6.1 05/14/2025
2024-1 s. 6.1(a)(48) - (51) 2 4 H74 6.1 6.1 05/14/2025
2024-15 s. 2(a) 47 S391 23 23 07/01/2025
2024-29 s. 8(d) 4 H74 6.2 6.2 05/14/2025
2024-32 s. 5.1 97 S449 4.1 4.1 07/01/2025
2024-34 s. 8(a1) 36 H412 8 8 07/01/2025
2024-44 s. 5.1(d), (e), (g) 94 H926 23(a) 23 07/08/2024
2024-45 s. 19.2(f) 47 S391 19.5(a) 19.5 07/01/2025
2024-51 s. 12.1 2 H47 5.11 5.11 03/19/2025
2024-53 s. 2.1(a) 1 2 H47 2A.4(c) 2.4 03/20/2025
2024-53 s. 4B.3 2 2 H47 5.9 5.9 03/19/2025
2024-53 s. 4B.7 3 2 H47 2A.3 2.3 10/25/2024
2024-53 s. 4C.3 4 97 S449 1.1(a) 1.1 10/22/2025
2024-53 s. 4C.7(j) 5 26 H1012 3.3 3.3 06/27/2025
2024-53 s. 4C.11(c) 6 25 H40 42(a) 42 06/26/2025
2024-53 s. 4C.12(c) 7 25 H40 42(b) 42 06/26/2025
2024-53 s. 4C.13(b) 8 4 H74 4.4 4.4 10/25/2024
2024-55 s. 10.2 89 H125 4.4(a) 4.4 07/01/2025
2024-55 s. 10.2(p) 89 H125 4.4(b) 4.4 07/01/2025
2024-56 s. 1.11 1 S115 3.2 3.2 02/27/2025
2024-56 s. 1.3 1 S115 3.1 3.1 02/27/2025
2024-57 s. 1D.3 1 97 S449 1.5(a) 1.5 12/11/2024
2024-57 s. 1D.8 2 97 S449 1.4(a) 1.41 10/22/2025
2024-57 s. 1F.2(d) 3 2 H47 2B.5 2.6 03/192025
2024-57 s. 3J.19 4 56 S125 2.5(e)(4) 2.5 07/03/2025
2025-2 s. 2B.2(a1) 4 H74 1A.1 1.1 05/14/2025
2025-2 s. 2D.2(b) 4 H74 1A.2(a) 1.2 05/14/2025
2025-2 s. 2D.2(c) 4 H74 1A.2(b) 1.2 05/14/2025
2025-2 s. 5.1(3)c. 97 S449 1.4(b) 1.42 10/22/2025
2025-11 s. 1(c) 25 H40 42.1 42.1 06/26/2025
2025-26 s. 2A.3(a)(1)a. 89 H125 1.2 1.2 07/01/2025
2025-26 s. 2A.3(c)(1) 89 H125 2A.10B(a) 2 06/27/2025
2025-26 s. 2B.1(b) 97 S449 1.2(a) 1.2 06/27/2025
2025-29 s. 1.13 01 86 H1015 3.1 3.1 07/30/2025
2025-29 s. 1.95 02 90 S775 3.2 3.2 09/24/2025
2025-29 s. 1.97 03 90 S775 3.3 3.3 09/24/2025
2025-29 s. 1.104 04 90 S775 3.4 3.4 09/24/2025
2025-29 s. 1.107 05 90 S775 3.5 3.5 09/24/2025
2025-29 s. 1.117 06 90 S775 3.6 3.6 09/24/2025
2025-29 s. 1.130 08 90 S775 3.7 3.7 09/24/2025
2025-29 s. 1.133 09 90 S775 3.8 3.8 09/24/2025
2025-29 s. 1.135 10 90 S775 3.9 3.9 09/24/2025
2025-29 s. 1.141 11 90 S775 3.10 3.10 09/24/2025
2025-29 s. 2.36 12 86 H1015 3.2 3.2 07/30/2025
2025-29 s. 2.43 13 86 H1015 3.3 3.3 07/30/2025
2025-29 s. 2.44(a) 13.5 86 H1015 3.4 3.4 07/30/2025
2025-29 s. 2.48 14 86 H1015 3.5 3.5 07/30/2025
2025-29 s. 2.58(a) 15 86 H1015 3.6 3.6 07/30/2025
2025-29 ss. 2.73, 2.78 16 86 H1015 3.7 3.7 07/30/2025
2025-29 s. 2.83 17 86 H1015 3.8 3.8 07/30/2025
2025-29 s. 2.87 18 86 H1015 3.9 3.9 07/30/2025
2025-29 s. 2.92 19 86 H1015 3.10 3.10 07/30/2025
2025-29 s. 2.100 20 86 H1015 3.11 3.11 07/30/2025
2025-29 s. 2.105 21 90 S775 3.11 3.11 09/24/2025
2025-29 s. 2.126 22 90 S775 3.12 3.12 09/24/2025
2025-45 s. 6(d) 97 S449 6.11 6.71 07/01/2025
2025-46 s. 1.3(b) 1 97 S449 2.3 2.3 07/01/2025
2025-46 Part 4 2 92 H358 2.5 2.5 09/30/2025
2025-56 Part 3 92 H358 2.6 2.6 09/30/2025
2025-57 s. 5 92 H358 2.3(b) 2.3 09/30/2025
2025-72 Part V 91 S245 3 3 09/30/2025
2025-86 ss. 2.3, 2.4 90 S775 3.1 3.1 09/24/2025
2025-89 s. 2A.5A 1 92 H358 2.1 2.1 07/01/2025
2025-89 s. 2A.6(b)(2) 2 92 H358 2.8(a) 2.8 09/30/2025
2025-89 s. 3.6 3 97 S449 8.1 8.1 07/01/2025
2025-89 s. 5.1 4 92 H358 8.1 8.1 07/01/2025
2025-90 s. 2.2 96 S777 3.1 3.1 10/23/2025
2025-93 s. 1(j) 97 S449 5.3(b) 5.31 10/22/2025