GENERAL ASSEMBLY OF NORTH CAROLINA
SESSION 2025
S 1
SENATE BILL 261
|
Short Title: Energy Security and Affordability Act. |
(Public) |
|
|
Sponsors: |
Senators Berger, P. Newton, and Barnes (Primary Sponsors). |
|
|
Referred to: |
Agriculture, Energy, and Environment |
|
March 11, 2025
A BILL TO BE ENTITLED
an act to ELIMINATE the INTERIM DATE FOR CARBON REDUCTION BY CERTAIN ELECTRIC PUBLIC UTILITIES and to allow an alternative cost recovery mechanism for construction work in progress for baseload electric generating facilities.
The General Assembly of North Carolina enacts:
SECTION 1.(a) G.S. 62‑110.9 reads as rewritten:
"§ 62‑110.9. Requirements concerning reductions in emissions of carbon dioxide from electric public utilities.
The Utilities Commission shall take
all reasonable steps to achieve a seventy percent (70%) reduction in
emissions of carbon dioxide (CO2) emitted in the State from electric generating
facilities owned or operated by electric public utilities from 2005 levels
by the year 2030 and that result in carbon
neutrality by the year 2050. For purposes of this section, (i) "electric
public utility" means any electric public utility as defined in
G.S. 62‑3(23) serving at least 150,000 North Carolina retail
jurisdictional customers as of January 1, 2021, and (ii) "carbon
neutrality" means for every ton of CO2 emitted in the State from electric
generating facilities owned or operated by or on behalf of electric public
utilities, an equivalent amount of CO2 is reduced, removed, prevented, or
offset, provided that the offsets are verifiable and do not exceed five percent
(5%) of the authorized reduction goal. In achieving the authorized carbon
reduction goals, goal, the Utilities Commission shall:
(1) Develop a plan, no later
than December 31, 2022, 2026, with the electric public utilities,
including stakeholder input, for the utilities to achieve the authorized
reduction goals, goal of carbon neutrality by the year 2050, which
may, at a minimum, consider power generation, transmission and distribution,
grid modernization, storage, energy efficiency measures, demand‑side
management, and the latest technological breakthroughs to achieve the least
cost path consistent with this section to achieve compliance with the
authorized carbon reduction goals goal (the "Carbon
Plan"). The Carbon Plan shall be reviewed every two years and may be
adjusted as necessary in the determination of the Commission and the electric
public utilities.
(2) Comply
with current law and practice with respect to the least cost planning for
generation, pursuant to G.S. 62‑2(a)(3a), in achieving the
authorized carbon reduction goals goal and determining
generation and resource mix for the future. Any new generation facilities or
other resources selected by the Commission in order to achieve the authorized
reduction goals goal for electric public utilities shall be owned
and recovered on a cost of service basis by the applicable electric public
utility except that:
a. Existing law shall apply with respect to energy efficiency measures and demand‑side management.
b. To the extent that new solar generation is selected by the Commission, in adherence with least cost requirements, the solar generation selected shall be subject to the following: (i) forty‑five percent (45%) of the total megawatts alternating current (MW AC) of any solar energy facilities established pursuant to this section shall be supplied through the execution of power purchase agreements with third parties pursuant to which the electric public utility purchases solar energy, capacity, and environmental and renewable attributes from solar energy facilities owned and operated by third parties that are 80 MW AC or less that commit to allow the procuring electric public utility rights to dispatch, operate, and control the solicited solar energy facilities in the same manner as the utility's own generating resources and (ii) fifty‑five percent (55%) of the total MW AC of any solar energy facilities established pursuant to this section shall be supplied from solar energy facilities that are utility‑built or purchased by the utility from third parties and owned and operated and recovered on a cost of service basis by the soliciting electric public utility. These ownership requirements shall be applicable to solar energy facilities (i) paired with energy storage and (ii) procured in connection with any voluntary customer program.
(3) Ensure any generation and resource changes maintain or improve upon the adequacy and reliability of the existing grid.
(4) Retain discretion to
determine optimal timing and generation and resource‑mix to achieve the
least cost path to compliance with the authorized carbon reduction goals, goal,
including discretion in achieving the authorized carbon reduction goals goal
by the dates date specified in order to allow for
implementation of solutions that would have a more significant and material
impact on carbon reduction; provided, however, the Commission shall not exceed
the dates date specified to achieve the authorized carbon reduction
goals goal by more than two years, except in the event the
Commission authorizes construction of a nuclear facility or wind energy
facility that would require additional time for completion due to technical,
legal, logistical, or other factors beyond the control of the electric public
utility, or in the event necessary to maintain the adequacy and reliability of
the existing grid. In making such determinations, the Utilities Commission
shall receive and consider stakeholder input."
SECTION 1.(b) G.S. 62‑110.1 reads as rewritten:
"§ 62‑110.1. Certificate for construction of generating facility; analysis of long‑range needs for expansion of facilities; ongoing review of construction costs; inclusion of approved construction costs in rates.
…
(e) As a condition for
receiving a certificate, the applicant shall file an estimate of construction
costs in such detail as the Commission may require. The Commission shall hold a
public hearing on each application and no certificate shall be granted unless
the Commission has approved the estimated construction costs and made a finding
that construction will be consistent with the Commission's plan for expansion
of electric generating capacity. A certificate for the construction of
generating facility by an electric public utility, as that term is defined by
G.S. 62‑110.9, shall be granted only if the applicant demonstrates
and the Commission finds that the facility is part of the least cost path to
achieve compliance with the authorized carbon reduction goals goal in
G.S. 62‑110.9, will maintain or improve upon the adequacy and
reliability of the existing grid, and that the construction and operation of
the facility is in the public interest. In making its determination, the
Commission shall consider resource and fuel diversity and reasonably
anticipated future operating costs. Once the Commission grants a certificate,
no public utility shall cancel construction of a generating unit or facility
without approval from the Commission based upon a finding that the construction
is no longer in the public interest.
…."
SECTION 2.(a) G.S. 62‑133 reads as rewritten:
"§ 62‑133. How rates fixed.
(a) In fixing the rates for any public utility subject to the provisions of this Chapter, other than bus companies, motor carriers and certain water and sewer utilities, the Commission shall fix such rates as shall be fair both to the public utilities and to the consumer.
(b) In fixing such rates, the Commission shall:
(1) Ascertain the reasonable original cost or the fair value under G.S. 62‑133.1A of the public utility's property used and useful, or to be used and useful within a reasonable time after the test period, in providing the service rendered to the public within the State, less that portion of the cost that has been consumed by previous use recovered by depreciation expense. In addition, construction work in progress may be included in the cost of the public utility's property under any of the following circumstances:
a. To the extent the Commission considers inclusion in the public interest and necessary to the financial stability of the utility in question, reasonable and prudent expenditures for construction work in progress may be included, subject to the provisions of subdivision (4a) of this subsection.
b. For baseload electric generating facilities, reasonable and prudent expenditures shall be included pursuant to subdivisions (2) or (3) of G.S. 62‑110.1(f1), whichever applies, subject to the provisions of subdivision (4a) of this subsection.
c. For baseload electric generating facilities, if the Commission determines there is an overall cost‑savings for customers over the life of the generating facility and a baseload electric generating facility has been subject to an annual ongoing review process pursuant to G.S. 62‑110.1(f), the Commission shall, upon determining through the ongoing review process that the expenditures were reasonably and prudently incurred, allow an increase in base rates outside of the rate‑making processes established under this section or G.S. 62‑133.16 to reflect solely the inclusion of such construction work in progress in the rate base, with the increase being effective 30 days after the Commission's order finding that the expenditures were reasonable and prudent.
…
(4a) Require each public utility to discontinue capitalization of the composite carrying cost of capital funds used to finance construction (allowance for funds) on the construction work in progress included in its rate based upon the effective date of the first and each subsequent general rate order issued with respect to it after the effective date of this subsection; allowance for funds may be capitalized with respect to expenditures for construction work in progress not included in the utility's property upon which the rates were fixed. In determining net operating income for return, the Commission shall not include any capitalized allowance for funds used during construction on the construction work in progress included in the utility's rate base.
…
(c) The original cost of the public utility's property, including its construction work in progress, shall be determined as of the end of the test period used in the hearing and the probable future revenues and expenses shall be based on the plant and equipment in operation at that time. If the public utility elects to establish rate base using fair value, the fair value determination of the public utility's property shall be made as provided in G.S. 62‑133.1A, and the probable future revenues and expenses shall be based on the plant and equipment in operation at the end of the test period. The test period shall consist of 12 months' historical operating experience prior to the date the rates are proposed to become effective, but the Commission shall consider such relevant, material and competent evidence as may be offered by any party to the proceeding tending to show actual changes in costs, revenues or the cost of the public utility's property used and useful, or to be used and useful within a reasonable time after the test period, in providing the service rendered to the public within this State, including its construction work in progress, which is based upon circumstances and events occurring up to the time the hearing is closed.
…."
SECTION 2.(b) G.S. 62‑110.1 reads as rewritten:
"§ 62‑110.1. Certificate for construction of generating facility; analysis of long‑range needs for expansion of facilities; ongoing review of construction costs; inclusion of approved construction costs in rates.
…
(f1) The Except as
provided in G.S. 62‑133(b)(1)c., the public utility shall
recover through rates in a general rate case conducted pursuant to G.S. 62‑133
the actual costs it has incurred in constructing a generating facility in
reliance on a certificate issued under this section as provided in this
subsection, unless new evidence is discovered (i) that could not have been
discovered by due diligence at an earlier time and (ii) that reasonably tends
to show that a previous determination by the Commission that a material item of
cost was just and reasonable and prudently incurred was erroneous. If the
Commission determines that evidence has been submitted that meets the
requirements of this subsection, the public utility shall have the burden of
proof to demonstrate that the material item of cost was in fact just and
reasonable and prudently incurred.
(1) When a facility has been completed, and the construction of the facility has been subject to ongoing review under subsection (f) of this section, the reasonable and prudent costs of construction approved by the Commission during the ongoing review shall be included in the public utility's rate base without further review by the Commission.
(2) If a facility has not been completed, and the construction of the facility has been subject to ongoing review under subsection (f) of this section, the reasonable and prudent costs of construction approved by the Commission during the ongoing review shall be included in the public utility's rate base without further review by the Commission.
(3) If a facility is under construction or has been completed and the construction of the facility has not been subject to ongoing review under subsection (f) of this section, the costs of construction shall be included in the public utility's rate base if the Commission finds that the incurrence of these costs is reasonable and prudent.
(f2) If the construction of a
facility is cancelled, including cancellation as a result of modification or
revocation of the certificate under subsection (e1) of this section, and the
construction of the facility has been subject to ongoing review under
subsection (f), absent newly discovered evidence (i) that could not have been
discovered by due diligence at an earlier time and (ii) that reasonably tends
to show that a previous determination by the Commission that a material item of
cost was just and reasonable and prudently incurred was erroneous, the public
utility shall recover through rates in a general rate case conducted pursuant
to G.S. 62‑133 or as provided in G.S. 62‑133(b)(1)c., the
costs of construction approved by the Commission during the ongoing review that
were actually incurred prior to cancellation, amortized over a reasonable time
as determined by the Commission. In the general rate case, case, or a
proceeding under G.S. 62‑133(b)(1)c., the Commission shall make
any adjustment that may be required because costs of construction previously
added to the utility's rate base pursuant to subsection (f1) of this section
are removed from the rate base and recovered in accordance with this
subsection. Any costs of construction actually incurred, but not previously
approved by the Commission, shall be recovered only if they are found by the
Commission to be reasonable and prudent. If the Commission determines that
evidence has been submitted that meets the requirements of this subsection, the
public utility shall have the burden of proof to demonstrate that the material
item of cost was just and reasonable and prudently incurred.
…."
SECTION 2.(c) G.S. 62‑110.6 reads as rewritten:
"§ 62‑110.6. Rate recovery for construction costs of out‑of‑state electric generating facilities.
(a) The Commission shall, upon petition of a public utility, determine the need for and, if need is established, approve an estimate of the construction costs and construction schedule for an electric generating facility in another state that is intended to serve retail customers in this State.
(b) The petition may be filed at any time after an application for a certificate or license for the construction of the facility has been filed in the state in which the facility will be sited. The petition shall contain a showing of need for the facility, an estimate of the construction costs, and the proposed construction schedule for the facility.
(c) The Commission shall conduct a public hearing to consider and determine the need for the facility and the reasonableness of the construction cost estimate and proposed construction schedule. If the Commission finds that the construction will be needed to assure the provision of adequate public utility service within North Carolina, the Commission shall approve a construction cost estimate and a construction schedule for the facility. In making its determinations under this section, the Commission may consider whether the state in which the facility will be sited has issued a certificate or license for construction of the facility and approved a construction cost estimate and construction schedule for the facility. The Commission shall issue its order not later than 180 days after the public utility files its petition.
(d) G.S. 62‑110.1(f)
shall apply to the construction cost estimate determined by the Commission to
be appropriate, and the actual costs the public utility incurs in constructing
the facility shall be recoverable through rates in a general rate case pursuant
to G.S. 62‑133 as provided in G.S. 62‑110.1(f1).G.S. 62‑110.1(f1),
or as provided in G.S. 62‑133(b)(1)c.
(e) If the construction of a
facility is cancelled, the public utility shall recover through rates in a
general rate case conducted pursuant to G.S. 62‑133 G.S. 62‑133,
or as provided in G.S. 62‑133(b)(1)c., the costs of construction
that were actually incurred prior to the cancellation and are found by the
Commission to be reasonable and prudent, as provided in subsections (f2) and
(f3) of G.S. 62‑110.1."
SECTION 3. If any provision of this act or the application thereof to any person or circumstances is held invalid, such invalidity shall not affect other provisions or applications of this section that can be given effect without the invalid provision or application and, to this end, the provisions of this section are declared to be severable.
SECTION 4. This act is effective when it becomes law, and Section 2 of this act applies to petitions for an increase to rates based on construction work in progress filed on or after that date.